• Title/Summary/Keyword: Database Construction System

Search Result 829, Processing Time 0.026 seconds

A Study on the Classification System for Design DB(Database) (디자인 DB(database)에 있어서 분류체계에 관한 연구)

  • 유보현;김태균;홍석기
    • Archives of design research
    • /
    • v.13 no.1
    • /
    • pp.67-74
    • /
    • 2000
  • According to computer-based life style and computer networking system is generalized, the construction of information system based on the construction of database is one of the major jobs in the design field. The construction of standard database system is one of the major factors to build the information infra and develop design field as knowledge-base industry. However, the construction of user-based dassification of database is prior to that of standard design database system. This study presents the possibility of the construction of user-friendly and standard database system by studying the dassification system of database.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Image database construction for IC chip analysis CAD system (IC칩 분석용 CAD 시스템의 영샹 데이터베이스 구축)

  • 이성봉;백영석;박인학
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.33A no.5
    • /
    • pp.203-211
    • /
    • 1996
  • This paper describes CAD tools for the construction of image database in IC chip analysis CAD system. For IC chip analysis by high-resolution microscopy, the image database is essential to manage more than several thousand images. But manual database construction is error-prone and time-consuming. In order to solve this problem, we develop a set of CAD toos that include image grabber to capture chip images, image editor to make the whole chip image database from the grabbed images, and image divider to reconstruct the database that consists of evenly overlapped images for efficient region search. we also develop an interactive pattern matching method for user-friendly image editing, and a heuristic region search method for fast image division. The tools are developed with a high-performance graphic hardware with JPEG image comparession chip to process the huge color image data. The tools are under the field test and experimental resutls show that the database construction time can be redcued in 1/3 compared to manual database construction.

  • PDF

WORKFORCE INFORMATION DATABASE AND RFID TECHNOLOGY TO TRACK AND MANAGE WORKFORCE INFORMATION

  • Yong-Woo Kim;Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1094-1099
    • /
    • 2009
  • Workforce information is important in production planning because production planning requires matching a production unit's capacity to loads of assignments. However, tracking and managing workforce information such as skills and accident history is not an easy job. This paper describes a prototype database system for a workforce database system that employs RFID technology. This system tracks daily workforce production capacity on sites. A pilot project is described to explore the benefits and possibility of using radio-frequency identification (RFID) to track and manage workforce information, and is followed by the results of a survey to identify benefits. In addition to the survey identifying the benefits of the database system, the paper also presents a list of challenges through a series of interviews.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

Study on Construction Method of Satellite Radio Interferer Search System (위성전파 혼신원 탐색 시스템 구축 방안 연구)

  • Kang, Chul-Gyu;Park, Chul-Sun;Oh, Chang-Heon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.3
    • /
    • pp.343-348
    • /
    • 2011
  • In this paper, we propose the construction and reconstruction method of satellite radio interferer search system to deal with the keen competition among nations to acquire the limited satellite sources. To construct the satellite interferer search system, whole TLS system construction, part of TLS system construction, and domestic system construction methods are proposed. After that characteristics, advantages, and disadvantages of the system are analyzed when these proposed systems are constructed. In addition, database problems are analyzed in case of the reliability of the operating database, the convergence management between database management systems, and public database service then the solution are proposed.

A Development of a Web Based Supporting System for Writing Construction Project Specification (Web기반 공사시방서 작성 시스템 개발 방안)

  • Kim Kyoon-Tai;Kim Tae-Song;Koo Jai-Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.501-506
    • /
    • 2001
  • The Korean government established a domestic specification system, and regulated that owner should produced construction project specifications, instead of special provisions, in design phase, January 1998. But in Korea the ability of construction engineers for construction project specification are insufficient. So the government had built up a database of standard specifications and developed a supporting system for writing construction project specification(SPECMAKE) in 1999. However, it is a PC base stand-alone system, so it is not convenient to update the database. In order to overcome these limitations, the purpose of this paper builds up a database of construction criteria and develops a automatic writing system for construction project specification on web base. The database contains standard specifications, design and construction guidelines related with construction business. And this paper describes the frameworks, the components, and the functions of the specifications writing system for the construction projects.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

A Study of the Actual Construction Data Management System for Apartment Housing (공동주택의 공사실적자료 관리시스템 분석)

  • Park Hyung-Jae;Kim Tae-Hee;Kim Sun-kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.489-494
    • /
    • 2001
  • Actual construction data of completed projects can be utilized for the economic, time benefit of improving the efficiency on planning, designing, estimating and managing tasks in succeeding projects. But the lack of the system which accumulates and manages the actual data with standardized type, it has not performed well and stayed on early stage. It is required not only specific plan for the utilization of actual data but a construction information management system which collects and processes far-reaching data with standardized from based on facility. Therefore, the purpose of this study is to develop a construction information management system for Apartment housing ,which stored data along project feature database, actual cost database and actual database based on the Web. This effort can make an offer the clearness of dull construction market and the base of construction intelligence

  • PDF