• 제목/요약/키워드: Database Construction

검색결과 1,433건 처리시간 0.031초

IC칩 분석용 CAD 시스템의 영샹 데이터베이스 구축 (Image database construction for IC chip analysis CAD system)

  • 이성봉;백영석;박인학
    • 전자공학회논문지A
    • /
    • 제33A권5호
    • /
    • pp.203-211
    • /
    • 1996
  • This paper describes CAD tools for the construction of image database in IC chip analysis CAD system. For IC chip analysis by high-resolution microscopy, the image database is essential to manage more than several thousand images. But manual database construction is error-prone and time-consuming. In order to solve this problem, we develop a set of CAD toos that include image grabber to capture chip images, image editor to make the whole chip image database from the grabbed images, and image divider to reconstruct the database that consists of evenly overlapped images for efficient region search. we also develop an interactive pattern matching method for user-friendly image editing, and a heuristic region search method for fast image division. The tools are developed with a high-performance graphic hardware with JPEG image comparession chip to process the huge color image data. The tools are under the field test and experimental resutls show that the database construction time can be redcued in 1/3 compared to manual database construction.

  • PDF

건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구 (A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD)

  • 방준식;태성호;노승준;금원석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

수송장비의 실시간 가상 시뮬레이션을 위한 3차원 데이터베이스의 체계적인 구축 프로세스 (A Systematic Construction Process of 3D Database for Realtime Virtual Simulation of Transportation Equipments)

  • 김보현
    • 산업공학
    • /
    • 제16권2호
    • /
    • pp.258-267
    • /
    • 2003
  • Recently, virtual reality technologies have been rapidly developed and realtime virtual simulation methods have been extensively employed for several application areas such as game, sports, manufacturing, military, and so on. A 3D database in realtime virtual simulation plays a key role because it makes users feel reality in virtual space. In a application view of 3D database, a systematic construction approach is required to reduce its construction time and increase its quality. However, many researches have been mostly focused on realtime graphic issues and its key technologies. In virtual simulation of transportation equipments, this paper proposes a systematic construction process of 3D database consisting of four stages as follows: 1) determine the activity space of a equipment, 2) collect data related to 3D database construction, 3) make a 3-dimensional modeling strategy, and 4) generate and evaluate a 3D model. This paper also introduces a new procedure of 3D environment modeling, which summarizes and expands our modeling experiences, to be used as a modeling guide.

지리정보 데이터베이스 구축공정 관리방법론 연구 (Study on Process Management Methodology of Geographic Information Database Construction)

  • 최병길;김성수
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2003년도 추계학술발표회 논문집
    • /
    • pp.257-262
    • /
    • 2003
  • This study is aimed to research the management methodology for the process of GIS database construction. In general, used methodologies are made for the purpose of application program development. And the methodologies reflected GIS characteristics are also applied for GIS software development. But the software methodologies are never introduced to construction of GIS database. In this study, various common methodologies are investigated and analyzed, and the methodology which include the characteristic of GIS database construction process as work steps and detail paths is developed and suggested.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

Conceptual Data Modeling on the KRR-1&2 Decommissioning Database

  • Park, Hee-Seoung;Park, Seung-Kook;Lee, Kune-Woo;Park, Jin-Ho
    • Nuclear Engineering and Technology
    • /
    • 제34권6호
    • /
    • pp.610-618
    • /
    • 2002
  • A study of the conceptual data modeling to realize the decommissioning database on the HRR-1&2 was carried out. In this study, the current state of the abroad decommissioning database was investigated to make a reference of the database. A scope of the construction of decommissioning database has been set up based on user requirements. Then, a theory of the database construction was established and a scheme on the decommissioning information was classified . The facility information, work information, radioactive waste information, and radiological information dealing with the decommissioning database were extracted through interviews with an expert group and also decided upon the system configuration of the decommissioning database. A code which is composed of 17 bit was produced considering the construction, scheme and information. The results of the conceptual data modeling and the classification scheme will be used as basic data to create a prototype design of the decommissioning database.

디자인 DB(database)에 있어서 분류체계에 관한 연구 (A Study on the Classification System for Design DB(Database))

  • 유보현;김태균;홍석기
    • 디자인학연구
    • /
    • 제13권1호
    • /
    • pp.67-74
    • /
    • 2000
  • 오늘날 컴퓨터의 사용이 일반화되어 인터넷을 이용한 정보의 교환 시스템이 보편화되면서 필요한 정보를 신속하게 이용하고 공유할 수 있는 데이터 베이스 환경을 구축하는 일은 디자인 분야에서도 신속히 추진해야 할 과제 중의 하나로 떠오르게 되었다. 이러한 디자인 데이터 베이스(DB)의 체계적 구축은 디자인 정보화 산업의 추진과 더 나아가 지식기반 산업으로서의 디자인 분야 발전의 토대가 된다. 이러한 체계적 구축은 디자인 분야 발전의 토대가 된다. 이러한 체계적이고 표준화된 디자인 DB의 구축을 위하여 선행되어 져야 할 것이 사용자들이 쉽게 접근하고 이용할 수 있는, 사용자 중심의 보편화된 분류체계를 수립하는 것이다. 본 연구에서는 분류체계에 대한 연구를 통하여 사용자 중심의 표준화된 분류체계의 구축과 이러한 분류체계가 오늘날의 기술환경에 적용되어 실행될 수 잇는 가능성을 제시하는데 목적이 있다.

  • PDF

해외 발전플랜트 리스크 분류체계 및 관계형 데이터베이스 구축 방안 (Risk Classification and Relational Database Schema in Overseas Power Plant Construction)

  • 김민;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.192-193
    • /
    • 2014
  • Due to the decreasing domestic construction market since 2007, Korean construction companies are expanding overseas market. As a result, the international market share by Korea has been continuously increased and achieved 65.2 billion dollars in 2013. Despite of such visible results, profitability concerns are constantly arising. It is pointed out that the low-priced bid competition between Korean construction companies and various unpredictable risks are the most crucial factors which aggravate the profitability in the overseas projects. From this point of view, predicting the risks in advance and controling them could be the most important tasks to improve the profitability. This research proposed 202 risk factors with a hierarchy and relational database schema for power plant construction, which is based on the 24 risk classifications in previous research (Kim & Jung 2013). Proposed risk classification and relational database schema could be utilized as the basic data in risk management system.

  • PDF

The Status Quo of Graph Databases in Construction Research

  • Jeon, Kahyun;Lee, Ghang
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.800-807
    • /
    • 2022
  • This study aims to review the use of graph databases in construction research. Based on the diagnosis of the current research status, a future research direction is proposed. The use of graph databases in construction research has been increasing because of the efficiency in expressing complex relations between entities in construction big data. However, no study has been conducted to review systematically the status quo of graph databases. This study analyzes 42 papers in total that deployed a graph model and graph database in construction research, both quantitatively and qualitatively. A keyword analysis, topic modeling, and qualitative content analysis were conducted. The review identified the research topics, types of data sources that compose a graph, and the graph database application methods and algorithms. Although the current research is still in a nascent stage, the graph database research has great potential to develop into an advanced stage, fused with artificial intelligence (AI) in the future, based on the active usage trends this study revealed.

  • PDF

건설공사 생산성 관리를 위한 데이터모델 (Datamodel for Productivity Management of Construction Project)

  • 류한국;유정호;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.442-445
    • /
    • 2002
  • 건설공사 클레임 중에서 공기지연 클레임의 발생빈도가 높다. 공기지연 클레임은 발주자와 원도급자 모두에게 프로젝트 자체의 경제적 문제 뿐 만 아니라 회사의 존폐와 관련이 된다. 체계적인 증빙자료의 부재로 인하여 산정방법이 정량적이지 못하기 때문에 공기지연 클레임을 공평하게 해결하는 데 어려움이 많다. 따라서, 건설공사 단계에서 공사정보 또는 증빙자료를 체계적으로 구축할 수 있어야 한다. 본 연구는 예비적 고찰로 공기지연 클레임 데이터베이스의 기존 연구와 문제점을 고찰하였다. 단계별 공정표와 데이터베이스 연계구축 방안을 제시하였고, 건설생산성 데이터베이스 구축을 위한 요구정보에 근거하여 개념적 데이터모델링과 논리적 데이터모델링을 통한 건설공사 생산성 관리를 위한 데이터 모델링을 구축하였다. 이에 본 연구는 손실생산성을 고려한 공기지연일수 산정을 위해 건설공사 생산성 관리를 위한 데이터모델의 구축을 목적으로 한다.

  • PDF