• Title/Summary/Keyword: Database Construction

Search Result 1,433, Processing Time 0.034 seconds

Image database construction for IC chip analysis CAD system (IC칩 분석용 CAD 시스템의 영샹 데이터베이스 구축)

  • 이성봉;백영석;박인학
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.33A no.5
    • /
    • pp.203-211
    • /
    • 1996
  • This paper describes CAD tools for the construction of image database in IC chip analysis CAD system. For IC chip analysis by high-resolution microscopy, the image database is essential to manage more than several thousand images. But manual database construction is error-prone and time-consuming. In order to solve this problem, we develop a set of CAD toos that include image grabber to capture chip images, image editor to make the whole chip image database from the grabbed images, and image divider to reconstruct the database that consists of evenly overlapped images for efficient region search. we also develop an interactive pattern matching method for user-friendly image editing, and a heuristic region search method for fast image division. The tools are developed with a high-performance graphic hardware with JPEG image comparession chip to process the huge color image data. The tools are under the field test and experimental resutls show that the database construction time can be redcued in 1/3 compared to manual database construction.

  • PDF

A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD (건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Roh, Seung-Jun;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

A Systematic Construction Process of 3D Database for Realtime Virtual Simulation of Transportation Equipments (수송장비의 실시간 가상 시뮬레이션을 위한 3차원 데이터베이스의 체계적인 구축 프로세스)

  • Kim, Bo-Hyun
    • IE interfaces
    • /
    • v.16 no.2
    • /
    • pp.258-267
    • /
    • 2003
  • Recently, virtual reality technologies have been rapidly developed and realtime virtual simulation methods have been extensively employed for several application areas such as game, sports, manufacturing, military, and so on. A 3D database in realtime virtual simulation plays a key role because it makes users feel reality in virtual space. In a application view of 3D database, a systematic construction approach is required to reduce its construction time and increase its quality. However, many researches have been mostly focused on realtime graphic issues and its key technologies. In virtual simulation of transportation equipments, this paper proposes a systematic construction process of 3D database consisting of four stages as follows: 1) determine the activity space of a equipment, 2) collect data related to 3D database construction, 3) make a 3-dimensional modeling strategy, and 4) generate and evaluate a 3D model. This paper also introduces a new procedure of 3D environment modeling, which summarizes and expands our modeling experiences, to be used as a modeling guide.

Study on Process Management Methodology of Geographic Information Database Construction (지리정보 데이터베이스 구축공정 관리방법론 연구)

  • 최병길;김성수
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.257-262
    • /
    • 2003
  • This study is aimed to research the management methodology for the process of GIS database construction. In general, used methodologies are made for the purpose of application program development. And the methodologies reflected GIS characteristics are also applied for GIS software development. But the software methodologies are never introduced to construction of GIS database. In this study, various common methodologies are investigated and analyzed, and the methodology which include the characteristic of GIS database construction process as work steps and detail paths is developed and suggested.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

Conceptual Data Modeling on the KRR-1&2 Decommissioning Database

  • Park, Hee-Seoung;Park, Seung-Kook;Lee, Kune-Woo;Park, Jin-Ho
    • Nuclear Engineering and Technology
    • /
    • v.34 no.6
    • /
    • pp.610-618
    • /
    • 2002
  • A study of the conceptual data modeling to realize the decommissioning database on the HRR-1&2 was carried out. In this study, the current state of the abroad decommissioning database was investigated to make a reference of the database. A scope of the construction of decommissioning database has been set up based on user requirements. Then, a theory of the database construction was established and a scheme on the decommissioning information was classified . The facility information, work information, radioactive waste information, and radiological information dealing with the decommissioning database were extracted through interviews with an expert group and also decided upon the system configuration of the decommissioning database. A code which is composed of 17 bit was produced considering the construction, scheme and information. The results of the conceptual data modeling and the classification scheme will be used as basic data to create a prototype design of the decommissioning database.

A Study on the Classification System for Design DB(Database) (디자인 DB(database)에 있어서 분류체계에 관한 연구)

  • 유보현;김태균;홍석기
    • Archives of design research
    • /
    • v.13 no.1
    • /
    • pp.67-74
    • /
    • 2000
  • According to computer-based life style and computer networking system is generalized, the construction of information system based on the construction of database is one of the major jobs in the design field. The construction of standard database system is one of the major factors to build the information infra and develop design field as knowledge-base industry. However, the construction of user-based dassification of database is prior to that of standard design database system. This study presents the possibility of the construction of user-friendly and standard database system by studying the dassification system of database.

  • PDF

Risk Classification and Relational Database Schema in Overseas Power Plant Construction (해외 발전플랜트 리스크 분류체계 및 관계형 데이터베이스 구축 방안)

  • Kim, Min;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.192-193
    • /
    • 2014
  • Due to the decreasing domestic construction market since 2007, Korean construction companies are expanding overseas market. As a result, the international market share by Korea has been continuously increased and achieved 65.2 billion dollars in 2013. Despite of such visible results, profitability concerns are constantly arising. It is pointed out that the low-priced bid competition between Korean construction companies and various unpredictable risks are the most crucial factors which aggravate the profitability in the overseas projects. From this point of view, predicting the risks in advance and controling them could be the most important tasks to improve the profitability. This research proposed 202 risk factors with a hierarchy and relational database schema for power plant construction, which is based on the 24 risk classifications in previous research (Kim & Jung 2013). Proposed risk classification and relational database schema could be utilized as the basic data in risk management system.

  • PDF

The Status Quo of Graph Databases in Construction Research

  • Jeon, Kahyun;Lee, Ghang
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.800-807
    • /
    • 2022
  • This study aims to review the use of graph databases in construction research. Based on the diagnosis of the current research status, a future research direction is proposed. The use of graph databases in construction research has been increasing because of the efficiency in expressing complex relations between entities in construction big data. However, no study has been conducted to review systematically the status quo of graph databases. This study analyzes 42 papers in total that deployed a graph model and graph database in construction research, both quantitatively and qualitatively. A keyword analysis, topic modeling, and qualitative content analysis were conducted. The review identified the research topics, types of data sources that compose a graph, and the graph database application methods and algorithms. Although the current research is still in a nascent stage, the graph database research has great potential to develop into an advanced stage, fused with artificial intelligence (AI) in the future, based on the active usage trends this study revealed.

  • PDF

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF