Freight charges are one of the major clauses in the voyage charter. However, in case of unexpected delays at loading and discharging ports, the owner of the ship would not be willing to cover the various costs he should bear by paying the freight receives from the charterer. Therefore, the shipowner, whose time and the ship would be both considered to be an expense, would try to reduce the laytime as least as possible when signing the charter party and to receive compensation such as demurrage and damage for detention from the charterer, just waiting for the agreed laytime to pass. In this study, we review the differences between demurrage and damage for detention and examine the acknowledgeable circumstances through the actual cases. Since the shipowner and the charterer do not often agree on the damage for detention from the respective contract, it is necessary to examine each. Besides, the shipowner and the charterer must acquaint the damage for detention and specify in a contract, to compensate for the actual loss of the shipowner.
For the last two decades, Seoul has always been affected by large floods. As climate change causes more frequent localized heavy rains exceeding the capacity of sewer or river to discharge water, flood damage is expected to increase. Under the situation, detention facilities for lacking capacity of sewers can control stormwater runoff to reduce flood damage in urbanized areas. In this study, in order to reduce flood damage in Cheonggyecheon areas, the capacity of detention facilities was decided to make up for the lacking capacity of main sewers in case of the rainfall in July, 2001 as large flood. The average amount of stormwater detained in eight Cheonggyecheon drainage areas is $235.09m^3/ha$. Location and size of stormwater detention facilities is designed to have effects in short term by targeting the reduction of flood damage. Schools and parks are suggested as optimal locations where detention facilities are constructed in drainage areas.
In this study for the development of area due to the increasing of industry, population and spreading of urbanization is rapidly increasing but about seventy percent of our nation's areas consists of the mountainous districts. In such case, when those areas have the heavy rains break, they are washed away by a fast-flowing stream of a valley and overflowed. Thus it could result on human life and property damage and also the widespread of flood damage in the downstream area. To decrease those damage, the construction of flood control reservoir is necessary. This research was aim to construct the flood runoff models of a mountainous small district and to determine the probability rainfall by analyzing precipitation. The study also examined the effects of location and size of flood control reservoir on flood reduction. The result showed that the construction of detention basin was an effective way to ensure the safety of flood control and multiple detention basin had superior result for reducing amount of runoff in the down stream area than the single detention basin.
Detention pond has an important role in peak flow reduction to mitigate flood damage. Design of detention pond is accomplished through the preliminary stage, planning stage, and design stage in general. New development projects produce increased peak flow and flow amounts. In this case it is necessary to design the detention pond easily and simply. The simple procedure of detention pond design is proposed in this study. The relevant variables are peak flow ratio ($\alpha$) for the before and after development, and storage ratio which is ratio of storage volume to flow amounts. Simplified method for the detention pond design with runoff reduction is easily used for practical purposes.
Operation models for storm water pumps in detention pond were developed in order to reduce the damage by inundation in urbanized area. The return periods (10, 20, 30 years) of rainfall were selected to estimate inflow discharge to detention ponds. Inflow hydrographs of detention ponds were derived by using the SWMM, and Petri net diagrams were selected to analyze the pump actions. Safety and efficiency of pumps and detention ponds were estimated by penalty index. In order to verify the models, the models were applied to three selected detention ponds in Seoul area. In numerical experimental results, the developed model 3 is more effective in inland flooding prevention than the existing one, and may be used to design and evaluate detention ponds with real time data of rainfall.
This study is for design of the detention system distributed in a watershed by the Multi-Objective Genetic Algorithms(MOGAs). A new model is developed to determine optimal size and location of detention. The developed model has two primary interfaced components such as a rainfall runoff model to simulate water surface elevation(or flowrate) and MOGAs to get the optimal solution. The objective functions used in this model depend on the peak flow and storage of detention. With various constraints such as structural limitations, capacities of storage and operational targets. The developed model is applied at Gwanyang basin within Anyang watershed. The simulation results show the maximum outlet reduction is occurred at detention facilities located in upper reach of watershed in the peak discharge rates. It is also reviewed the simultaneous construction of an off-line detention and an on-line detention. The methodologies obtained from this study will be used to control the flood discharges and to reduce flood damage in urbanized watershed.
Detention pond has an important role in peak flow reduction to mitigate flood damage. Design of detention pond is accomplished through the preliminary stage, and design stage in general. New development projects produce increased peak flow and flow amounts. In this case it is necessary to design the detention pond easily and simply. A simplified design method of the detention pond is suggested in this study. Used design variables are peak flow ratio(${\alpha}$) and storage ratio($S_r$). ${\alpha}$ is the peak flow ratio of before and after development of the basin. $S_r$ is a ratio of storage volume to total runoff volume. Applicability of the proposed method was also proved. The simple procedure of detention pond design is proposed in this study.
The ability to defend against floods in urban areas was weakened, because the increase in the impervious rate of urban areas due to urbanization and industrialization and the increase in the localized torrential rainfall due to abnormal climate. In order to reduce flood damage in urban areas, various runoff reduction facilities such as detention ponds and infiltration facilities were installed. However, in the case of domestic metropolitan cities, it is difficult to secure land for the installation of storm water reduction facilities and secure the budget for improving the aged pipelines. Therefore, it is necessary to design a storage system (called the detention pond in trunk sewer) that linked the existing drainage system to improve the flood control capacity of the urban area and reduce the budget. In this study, to analyze the effect of reducing runoff amounts according to the volume of the detention pond in trunk sewer, three kinds of virtual watershed (longitudinal, middle, concentration shape) were assumed and the detention pond in trunk sewer was installed at an arbitrary location in the watershed. The volume of the detention pond in trunk sewer was set to 6 cases ($1,000m^3$, $3,000m^3$, $5,000m^3$, $10,000m^3$, $20,000m^3$, $30,000m^3$), and the installation location of the detention pond in trunk sewer was varied to 20%, 40%, 60%, and 80% of the detention pond upstream area to the total watershed area (DUAR). Also, using the results of this study, a graph of the relationship and relational equation between the volume of the detention pond in trunk sewer and the installation location is presented.
Kim, Yun-Tae;Shim, Jae-Hyun;Chung, Jae-Hak;Ahn, Jae-Chan
Journal of the Korean Society of Hazard Mitigation
/
v.4
no.3
s.14
/
pp.51-60
/
2004
Urban flood damage has been caused by drainage deficiency. One of the methods to solve this problem is to construct detention basin and Pumping station and to pump out the water to the river. However, because of rapid urbanization, the capacity of drainage pipelines is sometimes not sufficient enough during the rainy season. Therefore, even though we have enough pumping stations, the inflow of surface water never reaches to the detention area, causing floods in urban area. This research is to find improvement of urban drainage system, estimating drainage pipeline risk. Also, eight models for a computer program were developed for practical use. The models were verified changing precipitation duration, intensity, design period, time distribution model, and etc. This verification was processed focusing that the model can regulate the water level in the detention basin and minimize the effect downstream. As a result Fuzzy models were found to be efficient to lower the water level in detention basin, and decreased about 8 cm in water level of downstream.
Kim, Seongpyo;Lee, Taegyo;Ryu, Jungrim;Park seonmee;Choi, Heeyong;Choi, Hyeonggil
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.129-130
/
2023
This study proposes rainwater infiltration retention blocks as a solution to the flooding problems caused by recent climate change and developed a flood prediction simulation program to select the optimal site for installing rainwater infiltration retention blocks that can minimize damage from floods. By applying the existing 2D flood analysis model G2D and adding a reservoir function, the volume of water before and after installation can be determined through simulation results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.