Browse > Article
http://dx.doi.org/10.3741/JKWRA.2008.41.7.693

A Development of Simplified Design Method of the Detention Pond for the Reduction of Runoff  

Lee, Jae-Joon (Dept. of Civil and Environmental Engrg., Kumoh National Institute of Technology)
Kwak, Chang-Jae (Dept. of Civil and Environmental Engrg., Kumoh National Institute of Technology)
Publication Information
Journal of Korea Water Resources Association / v.41, no.7, 2008 , pp. 693-700 More about this Journal
Abstract
Detention pond has an important role in peak flow reduction to mitigate flood damage. Design of detention pond is accomplished through the preliminary stage, and design stage in general. New development projects produce increased peak flow and flow amounts. In this case it is necessary to design the detention pond easily and simply. A simplified design method of the detention pond is suggested in this study. Used design variables are peak flow ratio(${\alpha}$) and storage ratio($S_r$). ${\alpha}$ is the peak flow ratio of before and after development of the basin. $S_r$ is a ratio of storage volume to total runoff volume. Applicability of the proposed method was also proved. The simple procedure of detention pond design is proposed in this study.
Keywords
Detention Pond; Peak Flow Ratio; Reduction of Runoff; Simplified Design Method; Storage ratio;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Guo, Y. and B.J. Adams (1999). "Analysis of Detention Ponds for Storm Water Quality Control." Water Resources Research, Vol. 35, No. 8, pp. 2447-2456   DOI
2 Paine, A. (1998). "The BASINOPT Program, ver.2.7."
3 Wycoff, R.L. and V.P. Singh (1976). "Preliminary Hydrologic Design of Small Flood Detention Reservoirs." Water Resources Bulletin, Vol. 12, No. 2, pp. 337-349   DOI
4 Akan, A.O. (1993). Urban Stormwater Hydrology : A Guide to Engineering Calculations, Technomic Publishing, Lancaster, PA
5 Guo, Y. and B.J. Adams (1999). "An Analytical Probabilistic Approach to Sizing Flood Control Detention Facilities." Water Resources Research, Vol. 35, No. 8, pp. 2457-2468   DOI
6 안태진, 박종윤, 류희정, 김중훈 (2003). “소유역에서 홍수조절용 펌프 및 유수지 규모의 결정에 관한 연구.” 한국수자원학회논문집, 한국수자원학회, 제36권, 제3호, pp. 385~398   과학기술학회마을
7 이종태, 윤세의, 이재준, 윤용남 (1991). “도시화영향을 고려한 유수지 계획모형.” 한국수문학회지, 한국수문학회, 제24권, 제4호, pp. 73-83   과학기술학회마을
8 Brater, E.F., King, H.W., Lindell, J.E., Wei, C.Y. (1996). "Handbook of Hydraulics, 7th ed." McGraw-hill
9 Guo, Y. (2001). "Hydrologic Design of Urban Flood Control Detention Ponds." Journal of Hydrologic Engineering, Vol. 6, No. 6, pp. 472-479   DOI   ScienceOn
10 소방방재청, 한국방재협회 (2005). 재해영향평가 실무지침서 개정
11 신응배, 이두진, 곽수동, 선상운, 이동훈 (2003). “하수관거모델을 이용한 CSO 저류시설의 최적용량결정에 관한 연구.” 한국물환경학회.대한상수도학회 공동 춘계학술발표회 논문집, pp. 309-312
12 윤여진, 이재철 (2001). “계획강우의 지속기간에 따른 저류지용량의 산정.” 한국수자원학회논문집, 한국수자원학회, 제34권, 제5호, pp. 415-426   과학기술학회마을
13 이정식, 이재준, 김규호, 오석호 (1995). “도시유역에 서 지체저류시설의 수문학적 설계에 관한 연구.” 한국수문학회지, 한국수문학회, 제28권, 제2호, pp. 159-173   과학기술학회마을
14 이재준, 김호년, 곽창재 (2006)a. “도시화에 따른 저류지의 유역 및 수문특성인자 분석.” 대한토목학회 학술발표회 논문집, 대한토목학회, pp. 1141-1144
15 이재준, 김호년, 곽창재 (2006)b. “도시유역에서 저류지설계를 위한 특성인자 분석.” 한국방재학회논문집, 한국방재학회, Vol. 6, No. 4, pp.37-47
16 이재준, 곽창재, 김호년 (2006). “도시유역에서 저류지 계획모형의 비교 및 저류효과 분석.” 대한토목학회 학술발표회 논문집, 대한토목학회, pp. 1053-1056
17 행정자치부(소방방재청)(2000-2006). 각종 개발사업재해영향평가서
18 환경부 (2005). 하수도 설계기준
19 Abt, S.R. and N.S. Grigg (1978). "An Approximate Method for Sizing Detention Reservoirs." Water Resources Bulletin, Vol. 14, No. 4, pp. 956-965   DOI