• Title/Summary/Keyword: Damage evaluation process

Search Result 293, Processing Time 0.034 seconds

Characteristic of Local Behavior in Orthotropic Steel Deck Bridge with Open Ribs according to Running Vehicle (주행차량에 따른 개단면 강바닥판 교량의 국부거동 특성)

  • Lee, Sung-Jin;Kyung, Kab-Soo;Park, Jin-Eun;Lee, Hee-Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.1
    • /
    • pp.101-108
    • /
    • 2012
  • The orthotropic steel deck bridge made by using relatively thin steel plate, and structural members such as transverse and longitudinal ribs, cross beam, etc. in the bridge are fabricated with complex shape by welding. Therefore, the possibility occurring deformation and defects by welding is very high, and stress states in the welded connection parts are very complex. Also, the fatigue cracks in orthotropic steel deck bridge are happening fromthe welded connection parts of secondary member than main member. However, stress evaluation for main members is mainly carried out in the design process of the bridge, detailed stress evaluation and characteristic analysis is not almost reviewed in the structural details which fatigue crack occurred. For the orthotropic steel deck bridge with open ribs which has been serviced for 29 years, in this study, the cause of fatigue crack is investigated and the fatigue safety of the bridge is examined based on fieldmeasurement by the loading test and real traffic condition. Also, structural analyses using gridmodel and detailed analysis model were carried out for the welded connection parts of longitudinal rib and diaphramthat fatigue crack occurred. Additionally, the behavior characteristics due to running vehicles were investigated by using influence area analysis for these structural details, and the occurrence causes of fatigue crack in the target bridge were clarified.

Technological Development Trends for Underground Safety in Urban Construction (도심지 공사시 지하안전 확보를 위한 기술개발 동향)

  • Baek, Yong;Kim, Woo Seok
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.343-350
    • /
    • 2017
  • Amid increasingly saturated ground space, development of underground space has been booming throughout the world and excavation has been underway near the structure above or under the ground level. But the ground subsidence caused by improper or poor construction technologies, underground water leakage, sudden changes of stratum and the problem with earth retaining system component has been emerged as hot social issue. To deal with such problems nationwide, establishment of preventive and proactive disaster management and rapid restoration system has been pushed now. In this study, collection of the data on technology development trend to secure the underground safety was made, taking into account of internal change elements (changing groundwater level, damage to underground utilities, etc) and external change elements (vehicle load, earthquake and ground excavation, etc) during excavation. Amid the growing need of ground behavior analysis, ground subsidence evaluation technology, safe excavation to prevent ground subsidence and reinforcement technology, improvement of rapid restoration technology in preparation for ground subsidence and development of independent capability, this study is intended to introduce the technology development in a bid to prevent the ground subsidence during excavation. It's categorized into prediction/evaluation technology, complex detect technology, waterproof reinforcement technology, rapid restoration technology and excavation technology which, in part, has been in process now.

A Study on the Effect of Rolling stock driver's license training (효과적인 철도차량운전면허 교육훈련에 관한 연구)

  • Youk, Sim-Goan;Jang, Sung-Wyoung
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1916-1932
    • /
    • 2008
  • The railway accident is characterized by widespread and great(immerse) damage to our society when an accident occurred even if the probability of a railway accident is low. It is no doubt that the role of a rolling stock driver who are active in the first line of the rail safety driving is the most important to prevent an unexpected railway accident. Before new railway safety law being taken into effect, each railway operating organization had the responsibility of training a rolling stock driver by qualification criteria (the requirements or standards of competency), training period, probation period decided on their own standards. To train drivers driving same locomotive model, each railway operating organization had a variety of standards to draft and train trainees. Consequently, It was considered inefficient way to train and manage rolling stock drivers. However, after implementing the new railway safety law, a new system including training and evaluation process to issue driver's license on the condition that entire requirements are satisfied has been established. To prove the competency of the rolling stock driver objectively, training center and third-party evaluation center are divided individually and assigned by government office. Training center should design the training program to allot theatrical education time for different trainee group and to secure maximum practical training time utilizing simulator system to enhance the rolling stock driver's competency. This study analyzes certain conditions necessary to maximize the effectiveness and practical use of training for aquisition of a driver's license and the problems of the existing rail safety law and the ways to improve them.

  • PDF

Study on Verification of Applicability for a Warehouse Construction Site using a Fire Risk Assessment Tool (화재위험도 평가 Tool에 의한 물류창고 공사장 적용성 검증에 관한 연구)

  • YongGoo Seo;SeHong Min
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.673-688
    • /
    • 2023
  • Purpose: Fires that occur during construction are infrequent, but cause great damage. Recently, with the growth of the logistics and distribution industry, the number of construction sites for new logistics warehouses is increasing, so it was selected as a research subject and research was conducted to reduce accidents at construction sites through the development of a fire risk assessment tool to quantitatively approach fire prevention. Method: A comprehensive fire risk assessment tool was accumulated by classifying the work in progress, classifying combustibles and ignition sources by grade, excluding air (oxygen), which is difficult to control, and additionally substituting evacuation safety. Result: Using the developed and proposed fire risk evaluation tool, excavation work with low fire risk, facility construction with medium fire risk, and finishing work with high fire risk were sampled to derive the result (CGI). Conclusion: In this study, it was possible to establish specific preventive measures and evaluate evacuation safety by controlling physical conditions (combustibles) and energy conditions (ignition sources) according to the risk assessment by developing a tool that can evaluate the risk of 14fire occurrence at construction sites. It is expected that in the future, through the application of the fire risk evaluation tool at construction sites, it will be provided as a criterion for establishing a process plan that can reduce risk and evaluating the adaptability of firefighting equipment.14

A Study on the Consciousness Survey of Improvement of Emergency Rescue Training -Based on the Fire Fighting Organizations in Gangwon Province- (긴급구조훈련 개선에 관한 의식조사 연구 -강원도 소방조직을 중심으로-)

  • Choi, Yunjung;Koo, Wonhoi;Baek, Minho
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.3
    • /
    • pp.440-449
    • /
    • 2019
  • Purpose: Fire-fighting organizations are the very first agencies that take actions at a disaster scene, and emergency rescue training is carried out for prompt and systematic response. However, there is a need for a change due to the limitations in emergency rescue trainings such as perfunctory trainings or trainings without considering regional or environmental characteristics. Method: This study is to conduct theoretical review with regard to emergency rescue training and present a measure to improve the emergency rescue training through attitude survey targeting fire-fighting organizations in Gangwon area. Result: Facilities that cause difficulties when doing emergency rescue activity were mostly hazardous material storage and processing facilities. In terms of the level of emergency rescue and response task, most respondents answered that the emergency rescue was insufficient. The respondents answered that the effectiveness of emergency rescue training was helpful, but some responses showed that the training was not helpful because of scenario-based training, seeming training, similar training carried out every year, unrealistic training, and lack of competent authorities' interest and perfunctory participations. Most respondents answered for the appropriateness of emergency rescue training and evaluation that they were satisfied, however, they were not satisfied with the evaluation methods irrelevant to the type of training, evaluation methods requiring unnecessary training scale, and evaluation methods leading perfunctory participations of competent authorities. Lastly, respondents mostly answered that training reflecting various damage situations are necessary regarding the demand on the improvement of emergency rescue training. Conclusion: The improvement measures for emergency rescue training are as follows. First, it is necessary to set and prepare various training contents in accordance with regional characteristics by reviewing major disasters occurred in the region. Second, it is necessary to revise the emergency rescue training guidelines and manuals for appropriate training plan for each fire station, provide education and training for working-level staff members, and establish training in a way that types, tactics, and strategies of emergency rescue training could be utilized practically. Third, it is necessary to prepare a scheme that can lead participation and provide incentive or penalty from the planning stage of training in order to increase the participation of supporting and competent authorities when an actual disaster occurs. Fourth, it is necessary to establish support arrangements and cooperative systems by authority through training by fire stations or zones in preparation for disaster situations that may occur simultaneously. Fifth, it is necessary to put emphasis on the training process rather than the result for emergency rescue training and evaluation, pay attention to the identification of supplement points for each disaster situation and make improvements. Especially, type or form of training should be considered rather than evaluating the execution status of detailed processes, and the evaluation measure that can consider the completeness (proficiency) of training and the status of role performance rather than the scale of training should be prepared. Sixth, type and method of training should be improved in accordance with the characteristics of each fire station by identifying the demand of working-level staff members for an efficient emergency rescue training.

Review of 2015 Major Medical Decisions (2015년 주요 의료판결 분석)

  • Yoo, Hyun Jung;Lee, Dong Pil;Lee, Jung Sun;Jeong, Hye Seung;Park, Tae Shin
    • The Korean Society of Law and Medicine
    • /
    • v.17 no.1
    • /
    • pp.299-346
    • /
    • 2016
  • There were also various decisions made in medical area in 2015. In the case that an inmate in a sanatorium was injured due to the reason which can be attributable to the sanatorium and the social welfare foundation that operates the sanatorium request treatment of the patient, the court set the standard of fixation of a party in medical contract. In the case that the family of the patient who was declared brain dead required withdrawal of meaningless life sustaining treatment but the hospital rejected and continued the treatment, the court made a decision regarding chargeable fee for such treatment. When it comes to the eye brightening operation which received measure of suspension from the Ministry of Health and Welfare for the first time in February, 2011, because of uncertainty of its safety, the court did not accept the illegality of such operation itself, however, ordered compensation of the whole damage based on the violation of liability for explanation, which is the omission of explanation about the fact that the cost-effectiveness is not sure as it is still in clinical test stage. There were numerous cases that courts actively acknowledged malpractices; in the cases of paresis syndrome after back surgery, quite a few malpractices during the surgery were acknowledged by the court and in the case of nosocomial infection, hospital's negligence to cause such nosocomial infection was acknowledged by the court. There was a decision which acknowledged malpractice by distinguishing the duty of installation of emergency equipment according to the Emergency Medical Service Act and duty of emergency measure in emergency situations, and a decision which acknowledged negligence of a hospital if the hospital did not take appropriate measures, although it was a very rare disease. In connection with the scope of compensation for damage, there were decisions which comply with substantive truth such as; a court applied different labor ability loss rate as the labor ability loss rate decreased after result of reappraisal of physical ability in appeal compared to the one in the first trial, and a court acknowledged lower labor ability loss rate than the result of appraisal of physical ability considering the condition of a patient, etc. In the event of any damage caused by malpractice, in regard to whether there is a limitation on liability in fee charge after such medical malpractice, the court rejected the hospital's claim for setoff saying that if the hospital only continued treatments to cure the patient or prevent aggravation of disease, the hospital cannot charge Medical bills to the patient. In regard to the provision of the Medical Law that prohibit medical advertisement which was not reviewed preliminarily and punish the violation of such, a decision of unconstitutionality was made as it is a precensorship by an administrative agency as the deliberative bodies such as Korean Medical Association, etc. cannot be denied to be considered as administrative bodies. When it comes to the issue whether PRP treatment, which is commonly performed clinically, should be considered as legally determined uninsured treatment, the court made it clear that legally determined uninsured treatment should not be decided by theoretical possibility or actual implementation but should be acknowledged its medical safety and effectiveness and included in medical care or legally determined uninsured treatment. Moreover, court acknowledged the illegality of investigation method or process in the administrative litigation regarding evaluation of suitability of sanatorium, however, denied the compensation liability or restitution of unjust enrichment of the Health Insurance Review & Assessment Service and the National Health Insurance Corporation as the evaluation agents did not cause such violation intentionally or negligently. We hope there will be more decisions which are closer to substantive truth through clear legal principles in respect of variously arisen issues in the future.

  • PDF

A Study on the Development and Performance Evaluation of Permeable GFRP Strengthening Panel for RC Structure (투수성 GFRP 보강 복합체 개발 및 투수성에 대한 연구)

  • Jo, Byung Wan;Kang, Seok Won;Park, Cheol;Kim, Jang Wook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.3
    • /
    • pp.65-73
    • /
    • 2013
  • Recently the exterior attaching reinforcement method is being often used by using FRP (Fiber Reinforced Polymer) as a method of strengthening concrete structure. this FRP exterior attaching reinforcement method has several advantages like high intensity, stiffness, good durability and easy installment comparing to its weight. but its structure is airtight covered by reinforcement material whose water permeability is low and water can't be discharged, thus it may provoke a damage to the structure after a long while. the main purposes of this study are to develop GFRP reinforcement material which can discharge the surface water properly and to measure its special functions. for this, we have changed the normal reinforcement material to water permeable structure and measured its water permeance modulus by an indoor test which shows the process of water permeance with the parameter of contained GFRP quantity. also tried to verify the measured value of the water permeance modulus in theory by analyzing the numbers on water permeance process. the test result showed that the biggest quantity of water, 0.5129 g/h $m^2$ was discharged when the fiber contained quantity reached at 75% and the tensile strength was also biggest by 476.6MPa at 75%, so it appeared that COSREM GP panel with 75% fiber contained quantity is the best in ventilation and structure.

A Study on the Improvement of the Disaster Prevention and Control System for Underpasses by Analytic Hierarchy Process (계층분석법을 통한 지하차도 재해 예방 및 제어 시스템 개선 연구)

  • Kim, Phil Do;Kim, Kyoung Soo;Moon, Yoo Mi
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.734-746
    • /
    • 2020
  • Purpose: Increase in the size and number of underpasses rises occurrence of disasters such as fire and flooding inundation in underpasses. In the occurrence of disasters, the underpasses are more vulnerable to expose of crucial disasters than the general roads due to they are built underground. Therefore, The purpose of this paper is to derive system improvement items to prevent and control disasters in underpasses. Method: A hierarchical model of disaster impact factors and alternatives was developed based on prior researches and expert advices on disaster analyses and impact factors in the underpasses. The developed model was employed for surveys of pairwise comparison, and rankings of improvement were determined by applying the AHP method. Result: With a consistency of the surveys, results of relative weights of evaluation criteria(traffic accidents, fire, flooding inundation) and alternatives(law, system/planning, maintenance/human factor/environment) shows that improvement of laws and system related to the fire disaster is a top priority to prevent and control disaster of the underpasses. Conclusion: From experts' point of view, strengthening laws and systems related to disater prevention facilities such as water spray facilities, external(ground) exit in relation to fire in underpasses showed that it is an alternative to prevent disasters and minimize damage to underpasses.

A Study on Selection of Optimal Shelters according to Dam Break Scenario Based on Continuous Rainfall Event (연속호우사상기반의 댐 붕괴 시나리오에 따른 최적대피소 선정에 관한 연구)

  • Kim, Kyunghun;Lim, Jonghun;Kim, Hung Soo;Shin, Soeng Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.433-447
    • /
    • 2023
  • There is a growing demand for the stability of existing dams due to abnormal climate and the aging of dams. Emergency Action Plans (EAPs) for reservoir or dam failure only consider a single rainfall event. Therefore, this study simulates dam failure caused by continuous rainfall events, and proposes the establishment of EAP by selecting the optimal shelters. We define a mega rainfall event scenario caused by continuous rainfall events with 500-year frequency in the Chungju Dam watershed and estimate the mega flood. The mega flood event scenario is divided into two cases: scenario A represents the flooding case caused by discharge release from a dam, while scenario B is the case of a dam break. As a result of flood inundation analysis, the flooded damage area by the scenario A is 50.06 km2 and the area by the scenario B is 6.1 times of scenario A (307.45 km2). We select optimal shelters for each administrative region in the city of Chungju, which has the highest inundation rate in the urban area. Seven shelter evaluation indicators from domestic and foreign shelter selection criteria are chosen, and Analytical Hierarchy Process (AHP) method is used to evaluate the alternatives. As a result of the optimal shelter selection, the six shelters are selected and five are schools. This study considers continuous rainfall events for inundation analysis and selection of optimal shelters. Also, the results of this study could be used as a reference for establishment of the EAP.

Evaluation of Steel Tube Connection in Precast Concrete Double Wall System (프리캐스트 콘크리트 더블월 시스템의 각형 강관 연결부 성능평가 )

  • Yujae Seo;Hyunjin Ju
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.2
    • /
    • pp.25-32
    • /
    • 2023
  • In this study, a double wall system is introduced, which was invented to simplify the complicated manufacturing process of the existing precast concrete (PC) double wall systems and to remove defects such as laitance that may occur during the production of concrete panels. An experimental study was conducted to investigate the tensile resisting capacity of the steel tube which is embedded in the precast concrete panel to keep the spacing between PC panels and to prevent damage of the PC panels during transportation and casting concrete onsite. The experiment was planned to determine the detail of effective steel tube connection considering the steel plate treatment method according to the formation of the opening, the presence of embedded concrete, and the reinforcement welding for additional dowel action as key variables. As a result, the ultimate tensile strength increased by 20-30% compared to the control specimen (ST) except for the steel tube specimen (ST_CP) which has steel plates bent inward at the end part of the steel tube. Since the specimen (ST_CON) filled with concrete inside the control specimen has no additional process and cost for the steel tube connections compared to the control specimen during the production of the developed double wall system, it is determined to be the appropriate detail of steel tube connection.