• 제목/요약/키워드: Dam construction upstream

검색결과 80건 처리시간 0.023초

Geometrical dimensions effects on the seismic response of concrete gravity dams

  • Sevim, Baris
    • Advances in concrete construction
    • /
    • 제6권3호
    • /
    • pp.269-283
    • /
    • 2018
  • This study presents the effects of geometrical dimensions of concrete gravity dams on the seismic response considering different base width/dam height (L/H) ratios. In the study, a concrete gravity dam with the height of 200 m is selected and finite element models of the dam are constituted including five different L/H ratios such as 0.25, 0.5, 0.75, 1.00, 1.25. All dams are modeled in ANSYS software considering dam-reservoir-foundation interaction. 1989 Loma Prieta earthquake records are applied to models in upstream-downstream direction and linear time history analyses are performed. Dynamic equilibrium equations of motions obtained from the finite element models of the coupled systems are solved by using Newmark time integration algorithm. The seismic response of the models is evaluated from analyses presenting natural frequencies, mode shapes, displacements and principal stresses. The results show that the L/H ratios considerably affect the seismic response of gravity dams. Also, the model where L/H ratio is 1.00 has more desirable results and most appropriate representation of the seismic response of gravity dams.

댐 건설에 따른 하류 하도 어류 서식처 변화 분석 (Change of Fish Habitat in a Downstream Reach of a Stream Due to Dam Construction)

  • 김승기;최성욱
    • Ecology and Resilient Infrastructure
    • /
    • 제1권2호
    • /
    • pp.61-67
    • /
    • 2014
  • 댐의 건설은 유황의 변동과 유사의 흐름을 차단하기 때문에 하천의 수리학적 환경에 큰 영향을 미치게 된다. 본 연구의 목적은 댐의 건설이 댐 하류의 어류의 서식처에 미치는 영향을 분석하는 것이다. 이를 위해 준정류 모형이 흐름모의에 사용되었으며, 물리 서식처 분석을 위해 HSI 모형을 사용하였다. 본 연구에서 사용된 수리모형은 유사이송에 의한 이동상 모의가 가능하다. 유량 시나리오를 통해 댐 건설 전과 후의 피라미에 대한 어류 서식처 조건을 분석하였으며, 모의 결과 댐 건설 후 발전방류로 인하여 피라미의 서식처가 악화되는 빈도가 늘어났다. 또한 댐 하류로부터의 침식이 예측되었다. 이는 상류의 유사량 공급의 차단으로 인하여 나타나는 장기적인 변화이다.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • 제7권
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

유역이수의 고도화에 대응하는 하구담수호의 계획론 -한국.일본의 대표적 사례의 비교연구- (Planning of Extuary Reservoirs for the Development of Water Resources -A Comparative Study of Representation Cases of Korea and Japan-)

  • 이희영
    • 한국농공학회지
    • /
    • 제24권1호
    • /
    • pp.44-52
    • /
    • 1982
  • Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.

  • PDF

충주댐 상류지역 하수도시설 확충사업에 관한 주민의 지불의사액 추정을 위한 CVM의 적용에 관한 연구 (Application of contingent valuation method for estimating willingness-to-pay in planning the integrated sewerage system in the catchment of Dam Chung-Ju)

  • 정동환;박규홍;진영선;조중무
    • 환경영향평가
    • /
    • 제13권2호
    • /
    • pp.73-86
    • /
    • 2004
  • The objective of this research was to estimate residents' willingness-to-pay using contingent valuation method and to investigate their environmental sensibilities prior to conduct the costbenefit analysis on the watershed management program of integrated sewerage construction and operation in the catchment of Dam Chung-Ju. A set of questionnaire was prepared and asked to 1,200 residents at downstream area as well as upstream area of Dam Chung-Ju. As a result, environmental sensibility of the residents living in the catchment of upstream of Lake Chung-Ju seemed very high. However, the substantial practice in their own life for conserving their environment was inactive, although residents' efforts trying to collect and dispose garbages in separate containers and to minimize the waste discharge load were actually made. The willingness-to-pay on each month for 20 years was estimated as 4,841 wons for the openended question and 3,411 wons for the close-ended question. Factorial analysis was also performed to obtain correlation among the questions asked. Seven groups of the correlated questions were identified and their contribution to the estimated willingness-to-pay was analyzed.

피라미에 대한 보 철거 구간에서의 물리서식처 모의(PHABSIM) 적용 (Application of Physical Habitat Simulation System (PHABSIM) in the Reach of Small Dam Removal for Zacco platypus)

  • 임동균;정상화;안홍규;김규호
    • 한국수자원학회논문집
    • /
    • 제40권11호
    • /
    • pp.909-920
    • /
    • 2007
  • 하천환경에 대한 사회적 요구에 의해 다양한 하천 복원 및 환경개선사업이 진행되고 있으므로, 이와 같은 사업의 효과를 평가할 방법론이 제공되어야 한다. PHABSIM은 하천 흐름과 관련되어 있는 수생 생물의 수리적 서식처 적합도를 평가하기 위해 제안된 방법이다. 본 연구에서는 보 철거 구간에 PHABSIM을 적용하여, 보 철거에 따른 피라미의 물리서식처 변화와 모형의 적절성을 평가하였다. 그 결과 일반적으로 보를 철거할 경우가 존치할 때보다 물리서식처가 향상된 것으로 나타났다. 그러나 유영력이 약한 산란기의 물리서식처는 보 상류의 유속이 증가되어 감소하는 것으로 나타났으며, 이에 대한 적절한 대책이 필요하다. 본 연구에 적용한 PHABSIM은 보 철거 사업을 포한한 다양한 하천사업의 평가와 필요성을 제시하는 효과적인 방법으로 활용될 수 있을 것이다.

소양강 다목적댐의 수문학적 안정성 검토 (Hydrological Stability Analysis of the Existing Soyanggang Multi-Purpose Dam)

  • 고석구;신용노
    • 물과 미래
    • /
    • 제28권3호
    • /
    • pp.187-195
    • /
    • 1995
  • 본 연구의 목적은 20년 전에 건설 완료된 우리나라 최대 다목적댐인 소양강 다목적댐의 치수능력을 재검토하여 그 대안을 제시하는데 있다. 최악의 기상조건을 고려하여 수문 기상학적 방법으로 산정한 소양강 다목적댐유역의 72시간 지속 가능 최대 강수량(PMP, probable maximum precipitation)은 760.0mm 이며 재산정된 가능 최대 홍수량(PMF, probable maximum flood)은 18,100$m^3$/s이다. 이는 댐 계획 당시 1,000년 빈도 홍수량의 최대치 13,500$m^3$/s 보다 1.34배 크게 나타났다. 가능 최대 홍수량을 설계 홍수량으로 채택할 경우의 4개 대안; 1) 하수 제한수위를 낮추는 안, 2) 비상 여수로를 추가하는 안, 3)기존 댐을 증고시키는 안, 4) 상류에 홍수조절용댐을 건설하는 안 등을 검토한 결과 경제성과 치수 관리 능력 효율면에서 소양강 다목적댐의 수문학적 안정성을 도모할 수 있는 최적의 개선 방안은 비상 여수로를 추가하는 안으로 판단된다. 따라서 현 여수로에 부가하여 비상 여수로를 추가하는 방안이 보다 더 구체적으로 검토되어야 할 것이다.

  • PDF

물수지 방정식을 이용한 대청댐 건설에 따른 수문환경의 변화 분석 (An Analysis of Hydrologic Changes due to Daechung Dam Construction using Water Balance Equation)

  • 안재현;유철상;윤용남
    • 한국수자원학회논문집
    • /
    • 제34권3호
    • /
    • pp.217-229
    • /
    • 2001
  • 댐에 의한 환경의 변화는 생태계의 변화나 댐 주변의 안개일수 증가와 같은 국지기상의 변화도 있으나 본 연구에서는 수문환경의 변화에 초점을 맞추어 댐 건설이후 어떤 수문환경의 변화가 발생하며, 이러한 수문환경의 변화가 유역의 유출특성에 어떤 식으로 영향을 주는지에 대해 정량적으로 살펴보았다. 수분환경의 변화를 살펴보기 위해서 대청댐 건설 전후의 댐 상류에서의 토지이용과 식생의 변화를 비교하였으며, 물수지 방정식을 이용하여 증발산량, 유출량 및 토양 함수비 등을 산정하고 댐 건설에 따른 변화 양상을 분석하였다. 댐의 건설로 인해 댐 상류에서는 삼림의 증사와 초지의 감소로 알베도가 감소하였고 잠재증발산량과 토양수분량이 증가하였으며, 이로인해 실제증발산량이 증가하였다. 또한 댐 건설 후의 유출율이 약간 증가하였다. 이상의 분석을 통해 댐 건설에 따른 수문환경의 변화를 정량적으로 파악할 수 있었다.

  • PDF

북한 황강댐 유출량에 따른 임진강유역 홍수 피해 지역 시뮬레이션 (Simulation of the Flood Damage Area of the Imjin River Basin in the Case of North Korea's Hwanggang Dam Discharge)

  • 박성재;이창욱
    • 대한원격탐사학회지
    • /
    • 제34권6_1호
    • /
    • pp.1033-1039
    • /
    • 2018
  • 우리나라는 매년 여름철마다 태풍과 집중호우가 함께 발생하는 홍수로 인해 인명 및 재산피해가 발생한다. 특히 임진강 유역은 급경사와 좁은 하도인 상류부와, 낮은 평지인 하류부로 되어 있어 홍수에 취약한 지형을 가지고 있다. 게다가 북한 지역의 임진강 상류에 위치한 대형 댐인 황강댐에서 여름철 마다 무단방류로 인하여 피해가 발생하였다. 이런 홍수 피해를 방지하기 위해 우리나라에서는 2010년 군남홍수조절지를 건설하여 홍수피해를 방지하고 있다. 하지만 홍수조절지의 건설 이후에도 홍수조절능력이 황강댐의 최대 저수량의 20%밖에 미치지 못한다. 이에 이 연구에서는 경기북부지역의 집중호우시 발생할 수 있는 홍수 피해 위험지역을 산정하기 위하여 LAHARZ_py 프로그램을 이용하여 피해예상지역을 산출하였다. 그 결과 군남홍수조절지의 홍수조절능력을 넘는 황강댐의 방류가 발생할 시에 경기도 연천군과 파주시에 피해가 예상되었다. 추후 이 연구는 홍수 피해를 대비하기 위한 자료로 유용할 것으로 판단된다.

수위변화에 따른 CFRD의 변형거동 사례분석 (A Case Study on Deformation Behaviors of CFRD with Water Level Change)

  • 윤중만;여규권;김홍연;이재연
    • 한국지반신소재학회논문집
    • /
    • 제17권1호
    • /
    • pp.21-31
    • /
    • 2018
  • 본 연구에서는 시공이 완료된 CFRD에 대하여 담수시점부터 수위변화에 따른 댐 제체의 변형거동을 파악하기 위하여 현장 모니터링을 통하여 댐의 변위를 분석하고, 이를 수치해석 결과와 비교하였다. 담수에 따른 댐 정상 및 하류사면 제체의 거동을 계측한 결과, 축방향 수평변위, 상 하류측 수평변위, 침하가 대부분 초기 담수로부터 저수위가 댐 높이 절반 정도에 이를 때부터 발생하였다. 그 후 저수위 최고 상승시까지 변위가 진행된 후 수위에 관계없이 일정하게 수렴되는 양상을 보였다. CFRD에서 가장 중요한 역할을 하는 차수벽의 수평변위는 모든 지점에서 비슷한 양상을 보였다. 차수벽의 수평변위는 담수 전 외부온도의 영향으로 동절기에 증가하고 하절기에 감소하는 경향이 있었다. 또한, 담수 후 저수위가 댐 높이 절반 정도에 이를 때까지 변위가 증가한 후 수위상승과 함께 감소하는 경향을 보였다. 결과적으로 차수벽의 거동은 저수위 조건뿐 아니라 담수 후에도 계절적인 변화를 나타내며, 콘크리트 슬래브의 재료적인 특성 영향이 큰 것으로 판단된다. 수치해석 결과 댐 축조 후 최대 침하량과 발생 위치는 실제와 다소의 차이가 있었는데, 이러한 차이는 해석시 입력 매개변수의 추정, 축조일수 및 층 시공두께 등 다양한 설계와 시공의 차이에서 기인한 것으로 판단된다. 그리고 전반적인 기간에 대하여 침하는 댐 축조기간 동안 대부분 완료되었고 담수 초기에 약간의 침하가 발생한 후 수렴되었다.