• Title/Summary/Keyword: Daily Load Curve

Search Result 67, Processing Time 0.026 seconds

Generation of Daily Load Curves for Performance Improvement of Power System Peak-Shaving (전력계통 Peak-Shaving 성능향상을 위한 1일 부하곡선 생성)

  • Son, Subin;Song, Hwachang
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.24 no.2
    • /
    • pp.141-146
    • /
    • 2014
  • This paper suggests a way of generating one-day load curves for performance improvement of peak shaving in a power system. This Peak Shaving algorithm is a long-term scheduling algorithm of PMS (Power Management System) for BESS (Battery Energy Storage System). The main purpose of a PMS is to manage the input and output power from battery modules placed in a power system. Generally, when a Peak Shaving algorithm is used, a difference occurs between predict load curves and real load curves. This paper suggests a way of minimizing the difference by making predict load curves that consider weekly normalization and seasonal load characteristics for smooth energy charging and discharging.

Assessment of Pollution Levels in the Jangsungcheon Watershed Using Load Duration Curves and Analysis of the Causes

  • Cho, Sohyun;Bak, Jonghun;Lee, Yeong Jae;Kim, Kyunghyun;Jung, Kang Young
    • Journal of Environmental Science International
    • /
    • v.28 no.10
    • /
    • pp.873-885
    • /
    • 2019
  • In this study, a load duration curve was applied to the Jangseongcheon, one of the tributaries of the Yeongsan River, to assess whether the target water quality was achieved. In addition, pollution of the water body was investigated to develop and suggest the optimal management time with respect to polluted flow sections and monthly conditions. The average flow rates of sections JS1 and JS2 were $0.25m^3/s$ and $1.08m^3/s$, respectively. The BOD and T-P for water-quality standards at JS1 were rated at II, whereas the COD and TOC were rated at III, thus indicating a fair level of water quality. By contrast, the BOD at JS2 was rated at III, the T-P at IV, and the TOC at V, indicating poor water quality in this section. The load duration curve was plotted using the actual flow data measured in eight-day intervals for eight years from 2011 to 2018 at locations JS1 and JS2 in the Jangsungcheon Basin. In an assessment using the load duration curve on whether the target water quality was met at location JS1, all of the water quality parameters (BOD, COD, TOC, T-N, T-P, and SS) satisfied the target water quality. By contrast, at location JS2, parameters COD, TOC, T-N, and T-P exceeded target values by more than 50%, indicating the target water quality was not met. The discharge loads of locations JS1 and JS2 were analyzed to identify the reasons the target water quality was exceeded. Results revealed that the land system contributed considerably. Furthermore, the discharge load of JS2 accounted for more than 80% of the load on the entire basin, excluding that of JS1. Therefore, the best method for restraining the inflow of pollutants into the stream near location JS2 must be applied to manage the water quality of the Jangsungcheon.

Influence Analysis of Temporal Continuity Change of Flow Data on Load Duration Curve (유량자료의 시간적 연속성 변화가 오염부하지속곡선에 미치는 영향 비교 분석)

  • Kwon, Pil Ju;Han, Jeong Ho;Ryu, Ji chul;Kim, Hong Tae;Lim, Kyoung Jae;Kim, Jong Gun
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.4
    • /
    • pp.394-402
    • /
    • 2017
  • In korea, TMDL is being implemented to manage nonpoint pollution sources as well as point pollution sources. LDC is being used for the planning of TMDL. In order to analyze the water quality using LDC, it is necessary to prepare FDC using the daily flow data. However, only the daily flow data is measured at the WAMIS branch, and 8days flow data and water quality data are measured at the monitoring Networks. So, in many researches, the water quality is being grasped by deriving the LDC using the 8days flow or the daily flow obtained by various methods. These fluctuations may lead to differences in determining whether the target load is achieved. In this study, each LDC was prepared using the 8day flow and the related daily flow. Then, the effect using different flow data on the achievement of target load was compared according to flow conditions. As a result, the difference ratio in the number of overloads under flow condition was showed 19% in high flows, 42% in moist conditions, 49% in mid-range flows, 41% in dry conditions, and 104% in low flows. In the top ten watershed with the highest difference ratio, the flow became lower the difference ration increases. These differences can cause uncertainty in assessing the achievement of target load using LDC. Therefore, in order to evaluate the water quality accurately and reliably using LDC, accurate daily flow data and water quality data should be secured through the installation of national nonpoint measurement network.

Assessing Impact of Reduction of Non-Point Source Pollution by BASINS/HSPF (HSPF를 이용한 비점오염원 삭감에 따른 효과 분석)

  • Bae, Dae-Hye;Ha, Sung-Ryong
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.71-78
    • /
    • 2011
  • This paper aims to assessing impact of reduction of non-point source pollution in the Bokha Stream watershed. The BASINS/HSPF model was calibrated and verified for water flow and water qualities using Total Maximum Daily Load 8days data from 2006 to 2007. Accuracy of the BASINS/HSPF models in simulating hydrology and water quality was compared and there were somewhat differences of statistical results, but water flow and water quality were simulated in good conditions over the study period. The applicability of models was tested to evaluate non-point source control scenarios to response hydrology and water quality in the Bokha stream using various measures which include BMPs approach and change of landuse. The evaluation of reduction of non-point source pollution was developed using load-duration curve. Despite strong reduction of non-point source, there are not satiated target quality at low flow season.

Development of Long Term Flow Duration Curves in 4 River Basins for the Management of Total Maximum Daily Loads (수질오염총량관리를 위한 4대강수계 장기유황곡선 작성방안)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.3
    • /
    • pp.343-353
    • /
    • 2013
  • Flow duration curve (FDC) can be developed by linking the daily flow data of stream flow monitoring network to 8-day interval flow data of the unit watersheds for the management of Total Maximum Daily Loads. This study investigated the applicable method for the development of long term FDC with the selection of the stream flow reference sites, and suggested the development of the FDC in 4 river basins. Out of 142 unit watersheds in 4 river basins, 107 unit watersheds were shown to estimate daily flow data for the unit watersheds from 2006 to 2010. Short term FDC could be developed in 64 unit watersheds (45%) and long term FDC in 43 unit watersheds (30%), while other 35 unit watersheds (25%) were revealed to have difficulties in the development of FDC itself. Limits in the development of the long term FDC includes no stream monitoring sites in certain unit watersheds, short duration of stream flow data set and missing data by abnormal water level measurements on the stream flow monitoring sites. To improve these limits, it is necessary to install new monitoring sites in the required areas, to keep up continuous monitoring and make normal water level observations on the stream flow monitoring sites, and to build up a special management system to enhance data reliability. The development of long term FDC for the unit watersheds can be established appropriately with the normal and durable measurement on the selected reference sites in the stream flow monitoring network.

Derivation of Continuous Pollutant Loadograph using Distributed Model with 8-Day Measured Flow and Water Quality Data of MOE (환경부 8일 간격 유량·수질 관측자료와 분포형 모형을 이용한 연속오염부하곡선의 유도)

  • Kim, Chul-Gyum;Kim, Nam-Won
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.1
    • /
    • pp.125-135
    • /
    • 2009
  • Reliable long-term flows by SWAT-K model were applied to the relationship between stream flow and pollutant load derived from 8-day measured data of Ministry of Environment (MOE) in order to obtain continuous loadograph and evaluate accuracy in water quality modeling for the Chungju dam watershed. The measured flow were compared with flow duration curve from the model, and it showed that measured values corresponded to the almost full range of stream flow conditions except at Odae A. And there was significant relationship ($R^2=0.60{\sim}0.97$) between measured flow and water quality load at all unit-watersheds. Applying this relationship to simulated flows, continuous loadograph was obtained and compared with modeled pollutant loads. Although there were some differences during some dry and flood seasons, those were not significant and overall trend showed a good agreement. From the results, we would be able to derive a continuous loadograph based on measured data at total maximum daily loads (TMDLs) unit-watersheds on a national scale, in which stream flow and water quality have been measured at 8-day intervals since 2004, and this could be helpful to utilize distributed water quality models with difficulty in calibrating and validating parameters from lack of measured data at present.

Improvement of Water Quality and Streamflow Monitoring to Quantify Point and Nonpoint Source Pollutant Loads (점오염원과 비점오염원 부하량 정량화를 위한 수질 유량 모니터링 개선)

  • Jang, Ju-Hyoung;Lee, Hyung-Jin;Kim, Hyun-Koo;Park, Ji-Hyoung;Kim, Ji-Ho;Rhew, Doug-Hee
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.5
    • /
    • pp.860-870
    • /
    • 2010
  • Long term monthly monitoring data showed that the water quality of streams flowing into Lake Paldang has been improved by various strategy for water. However, the effect of quality on Lake Paldang is still insufficient because of nonpoint source from watershed. In order to evaluate quantifying methods for pollution source and make a suggestion on improvements, Storm Water Management Model (SWMM) was constructed by using data set from the water quality and streamflow monitoring network in the Kyoungan watershed for Total Maximum Daily Loads (TMDLs). Load duration curve (LDC) based on the result of the Kyoungan watershed SWMM indicated that the water quality criterion on $BOD_5$ was often exceeded in up-stream than down-stream. From flowrate-load correlation curve, SS load significantly increased as streamflow increases. 75.3% of streamflow and 62.1% of $BOD_5$ loads is discharged especially in the zone of high flows, but monitoring data set didn't provide proper information about the conditions and the patterns associated with storm events. Therefore, it is necessary to acquire representative data set for comparing hydrograph and pollutograph through monitoring experimental watershed and to establish methods for quantifying point and nonpoint source pollutant loads.

Estimating BOD, CDO and TOC Hydrologic Flux in Nakdong River Basin (낙동강 유역 BOD, COD 및 TOC의 수문학적 플럭스 추정)

  • Lee, A-Yeon;Park, Moo-Jong;Jo, Deok-Jun;Kim, Sang-Dan
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.9
    • /
    • pp.830-839
    • /
    • 2010
  • This study presents a constituent load estimating procedure that can be operated with the present Korean TMDL monitoring system. The modified TANK model is used as a daily river flow simulation model whose parameters are estimated from 8-day intervals flow data. Constituent loads are estimated with the 7-parameter log linear model whose parameters are estimated by the minimum variance unbiased estimator. Results from Nakdong river basin reveals that the proposed procedure provides satisfactory TOC and BOD load estimates. As an application, a representative load duration curve is derived for working out a way to represent the overall hydrologic flux of BOD, COD and TOC at Nakdong river basin. The present water quality can be checked stochastically by Load Duration Curve through this study and presented visually.

Application of FDC and LDC using HSPF Model to Support Total Water Load Management System (오염총량관리제 지원을 위한 유역모형 기반 유량지속곡선 및 부하지속곡선 활용방안)

  • Lee, Eun Jeong;Kim, Tae Geun;Keum, Ho Jun
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.1
    • /
    • pp.33-45
    • /
    • 2018
  • In this study, we discussed the application of Watershed model and Load Duration Curves (LDC) in Total Water Load Management System. The Flow Duration Curves (FDC) and the LDC were generated using the results of the daily HSPF model and analyzed on monthly or yearly flow duration variability, and non-point pollutant discharge loads by entire flow conditions. As a result of the calibration and verification of the HSPF model, both the flow and the water quality were appropriately simulated. The simulated values were used to generate the Flow Duration Curve and the Load Duration Curve, and then the excess rate by entire flow conditions was analyzed. The point and non-point pollutant discharge loads for entire flow conditions were calculated. It is possible to evaluate the variability of water quality in specific flow duration through the curves reflecting the flow duration variability and to confirm the characteristics of the pollutant source. For a more scientific Total Water Load Management System, it is necessary to switch from a current system to a system that can take into account the entire flow conditions. For this, the application of the watershed model and load duration curve is considered to be the best alternative.

Industrial load forecasting using the fuzzy clustering and wavelet transform analysis

  • Yu, In-Keun
    • Journal of IKEEE
    • /
    • v.4 no.2 s.7
    • /
    • pp.233-240
    • /
    • 2000
  • This paper presents fuzzy clustering and wavelet transform analysis based technique for the industrial hourly load forecasting fur the purpose of peak demand control. Firstly, one year of historical load data were sorted and clustered into several groups using fuzzy clustering and then wavelet transform is adopted using the Biorthogonal mother wavelet in order to forecast the peak load of one hour ahead. The 5-level decomposition of the daily industrial load curve is implemented to consider the weather sensitive component of loads effectively. The wavelet coefficients associated with certain frequency and time localization is adjusted using the conventional multiple regression method and the components are reconstructed to predict the final loads through a five-scale synthesis technique. The outcome of the study clearly indicates that the proposed composite model of fuzzy clustering and wavelet transform approach can be used as an attractive and effective means for the industrial hourly peak load forecasting.

  • PDF