• Title/Summary/Keyword: Daechung Dam

Search Result 67, Processing Time 0.031 seconds

Return Flows Considered DAWAST Model (용수수요를 고려한 DAWAST 모형)

  • Noh, Jae-Kyoung;Lee, Jin-Young;Jin, Yong-Shin
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.503-506
    • /
    • 2003
  • The DAWAST model was originally developed to consider daily variation in the unsaturated soil water storage and it is a conceptual lumped model. Return flows from agricultural, domestic and industrial water were included to the original result of model simulation to calibrate model parameter. Daily inflow to the Daechung multipurpose dam was applied to verify the DAWAST model considered return flows. Simulation results were comparable to the inflows of dam operation reasonably.

  • PDF

Modifications of nutrient regime, chlorophyll-a, and trophic state relations in Daechung Reservoir after the construction of an upper dam

  • Ingole, Neha P.;An, Kwang-Guk
    • Journal of Ecology and Environment
    • /
    • v.40 no.1
    • /
    • pp.24-33
    • /
    • 2016
  • Background: Previous numerous studies on watershed scale demonstrated that the constructions of upper dams may influence the below dams due to modifications of flow regime and nutrient inputs. Little is known about how the dam constructions influence the downstream lakes or reservoirs in the regional scale. This study demonstrates how the construction of upper dam (i.e., Yongdam Dam) influences nutrient regime, trophic relations, and empirical models in Daechung Reservoir (DR). Yongdam Dam was constructed at the upstream region of DR in year 2000. Results: The analysis of hydrological variables showed that inflow and discharge in the DR were largely reduced after the year 2000. The construction of upper dam construction also resulted in increases of water temperature, pH and conductivity (as an indicator of ionic content) in the DR. Empirical models of TP-CHL and N:P ratio-CHL suggested that stronger responses of CHL to the phosphorus were evident after the upper dam construction, indicating that algal production at a unit phosphorus increased after the upper dam construction. Mann-Kendall tests on the relations of N:P ratios to TN showed weak or no relations ($t_{au}=-0.143$, z = -0.371, p = 0.7105) before the dam construction, while the relation of N:P ratios to TP showed strong in the periods of before- ($t_{au}=-0714$, z = -2.351, p = 0.0187) and after the construction ($t_{au}=-0.868$, z = -4.270, p = 0.0000). This outcome indicates that TP is key determinant on N:P ratios in the reservoir. Scatter Plots on Trophic State Index Deviations (TSIDs) of "TSI(SD) - TSI(CHL)" against "TSI(TP) - TSI(CHL)" showed that the dominance of clay turbidity or light limitation was evident before the upper dam construction [TSI(TP) - TSI(CHL) > 0 and TSI(SD) - TSI(CHL) > 0] and phosphorus limitation became stronger after the dam construction [(TSI(TP) - TSI(CHL) < 0 and TSI(SD) - TSI(CHL) > 0]. Conclusions: Overall, our analysis suggests that the upper dam construction modified the response of trophic components (phytoplankton) to the nutrients or nutrient ratios through the alteration of flow regime, resulting in modifications of ecological functions and trophic relations in the low trophic levels.

Analysis of Spatial Water Quality Variation in Daechung Reservoir (대청호 수리-수질의 공간적 변동 특성 분석)

  • Lee, Heung Soo;Chung, Se Woong;Choi, Jung Kyu;Oh, Dong Geun;Heo, Tae Young
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.5
    • /
    • pp.699-709
    • /
    • 2011
  • The uses of multi-dimensional hydrodynamic and water quality models are increasing to support a sustainable management of large dam reservoirs in Korea. Any modeling study requires selection of a proper spatial dimension of the model based on the characteristics of spatial variability of concerned simulation variables. For example, a laterally averaged two-dimensional (2D) model, which has been widely used in many large dam reservoirs in Korea, assumes that the lateral variations of hydrodynamic and water quality variables are negligible. However, there has been limited studies to give a justification of the assumption. The objectives of this study were to present the characteristics of spatial variations of water quality variables through intensive field monitoring in Daechung Reservoir, and provide information on a proper spatial dimension for different water quality parameters. The monitoring results showed that the lateral variations of water temperature are marginal, but those of DO, pH, and conductivity could be significant depending on the hydrological conditions and local algal biomass. In particular, the phytoplankton (Chl-a) and nutrient concentrations showed a significant lateral variation at R2 (Daejeongri) during low flow periods in 2008 possibly because of slow lateral mixing of tributary inflow from So-oak Stream and wind driven patchiness.

Geochemical Properties of Sedimentary Phosphorus of Daechung Lake in Autumn, Korea (추계 대청호 퇴적물 내 인의 지화학적 특성)

  • Shim, Moo Joon;Yang, Yun Mo;Oh, Da Yeon;Hwang, Yun Ho;Lee, Soo Hyung
    • Korean Journal of Ecology and Environment
    • /
    • v.48 no.3
    • /
    • pp.168-175
    • /
    • 2015
  • This study was conducted in autumn to determine phosphorus (P) fraction in sediments of Daechung Lake, to elucidate controlling factors for sedimentary P, and to compare with the other areas. For this study, sediment samples were collected at 6 sites only once on November 2014 using ponar grab and analyzed for solid-phase P (Loosely adsorbed, Fe-bound, Al-bound, detrital apatite, and refractory organic P) by sequential extraction. Total phosphorus (TP) was relatively high in front of Daechung Dam and Hoinam where fish farm was run until 1997. The dominant sedimentary P form was Al-bound P, followed by Fe-bound P, which could be released from sediment to water column during suboxic state. Based on principal component analysis, Al-bound P, Fe-bound, and TP were controlled by grain size of sediments. Loosely adsorbed, detrital apatite, and refractory organic P were relatively highly accumulated at the mouth of major tributaries where suspended sediments were delivered. Sedimentary P concentrations in Daechung Lake sediments were not higher than in other lake sediments. Therefore, based on these results, major controlling factors were grain size and input of suspended sediments from tributaries.

Functional Modifications of Daechung Reservoir Eutrophication by Upper Dam Construction (상류댐 건설에 따른 대청호 부영양화에 대한 기능 변화)

  • Lee, Soon-Cheol;Han, Jung-Ho;An, Kwang-Guk
    • Korean Journal of Ecology and Environment
    • /
    • v.41 no.3
    • /
    • pp.348-359
    • /
    • 2008
  • The objectives of the study were to elucidate functional modifications in relation to hydrological, physico-chemical and ecological aspects in Daechung Reservoir by the upper dam constructions of Youngdam Reservoir and analyze temporal and spatial dynamic patterns using trophic parameters of TN, TP, chlorophyll (CHL), and Secchi depth (SD). Hydrological data such as inflow, precipitation, and water levels before (BDC, 1995$\sim$2000) and after (ADC, 2001$\sim$2006) the dam construction showed that precipitation had greater correlations with inflow volume in the BDC (r=0.964, p=0.002) than in the ADC (r=0.857, p=0.029). This outcome indicates that the upper dam construction influenced the inflow and water level of Daechung Reservoir. One of the greatest changes after the dam construction was decreases of nutrient contents (TN, TP) and increases of algal biomass (as CHL) as the water residence time increases. Values of CHL had greater relations with TP in the ADC (r=0.412, p<0.001) than the BDC (r=0.249, p<0.001), indicating that CHL had greater response at a given phosphorus in the ADC. Thus, algal yield at a given TP (CHL : TP ratios) increased in the ADC, resulting in a greater CHL-TP relations. Long-term interannual TP, TN, SD, and CHL showed greater variations in the riverine zone (RZ) than any other transition (TZ) and lacustrine zones (LZ). This phenomenon was mainly attributed to rapid hydrological response in the riverine zone (RZ) to flow reductions (short water residence time) from the upper dam, resulting in ambient contents of nutrients and light regime along with functional relations of CHL-TP.

Evaluation of Eco-Hydrological Changes in the Geum River Considering Dam Operations : II. Hydraulic Fish Habitat Condition Analysis (댐 운영을 고려한 금강의 생태.수문학적 변화 평가 : II. 수리학적 어류서식처 조건 분석)

  • Park, Sang-Young;Kim, Jeong-Kon;Ko, Ick-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.5
    • /
    • pp.407-414
    • /
    • 2009
  • A quantitative analysis was conducted to study the impacts of artificial flow alteration on fish habitate condition change in the Geum River downstream the Daechung Multi-purpose Dam (DMD). River Analysis Package (RAP) was employed for the analysis and three fish species of black shiner, long nose barbel and Korean shinner were selected as icon species. The results of the analysis showed enhaced fish habitat conditions during low flow seasons in spring and fall after DMD construction, while the impact of the Youngdam Multipurpose Dam located upstream the DMD was insignificant. This result could be attributed to the fact that the increased flow during dry seasons helped create preferable habitat conditions for the fish species tested in this study.

Flood Stage Determination by Implicit Nymerical Technique (부정류 해석에 의한 금강하류부 홍수위결정)

  • 선우중호
    • Water for future
    • /
    • v.16 no.2
    • /
    • pp.123-129
    • /
    • 1983
  • One of the techniques to determine flood stages in natural channel is to find the solution of unsteady flow equations such as continuity and momentum equations. Since the exact analytic solution of these equations are not Known, the implicit numerical scheme is widely accepted tool for the approximate solution of equations. This technique is applied to the downstream of Daechung Dam in Geum River for the determination of flood stage for given frequency. However the flood stages are greatly affected by the method of reservoir Operation Method and Technical Operation Reservoir Method. Obviously, the Tech. ROM is found to be superior to Auto ROM.

  • PDF

A Study on Traveling Characteristics and Evaluation about Noise of Hydraulic Turbine Dynamo in Dam (댐 수차 발전기 소음의 전달특성과 평가에 관한 연구)

  • Yun, Jae-Hyun;Kook, Jung-Hoon;Kim, Jae-Soo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.30 no.7
    • /
    • pp.705-711
    • /
    • 2008
  • In case of the domestic condition, as the initiating from Sumjin River Dam, total 14 units of multipurpose dams had been constructed in 1965 for the roles of flood control, waterpower generation, irrigation, water supply, industrial water supply. In the case of such multipurpose dam, it produces electric energy by converting the potential energy utilizing its head and quantity of the water into kinetic energy. However, in this process, since during the time when the turbine connected to the hydraulic turbine dynamo revolves and there occurs a loud noise, it brings the physical, mental bad influences to those people also a decline of an effective working efficiency. On such point of view, after selection of various 16 measurement points, this study has measured and analyzed the travelling characteristics of noise generated at the hydraulic turbine dynamo in Daechung Dam, and also has evaluated the degree of indoor noise using the evaluation index such as PSIL, NC. As the result of noise-evaluation, in case of Daechung Dam, since the noise damage grade appears very seriously at various spaces, it is considering that its soundproof measure would be necessitated keenly. Also, it is considered that such data could be utilized as the valuable material hereafter for establishment of an efficient noise-reduction countermeasure and a comfortable working environment for the hydraulic turbine dynamo plant.

A Study on the Impact Range Calculation at the Downstream of Dam (댐이 하류하천에 미치는 영향권 산정에 관한 연구)

  • Park, Bong-Jin;Kim, Hyeon-Sik;Jung, Kwan-Sue;Ji, Hong-Ki
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.10
    • /
    • pp.1009-1021
    • /
    • 2008
  • In this study, 4 indices of hydraulic & hydrological, geomorphological, eco & environmental, social effect and 38 items are selected to calculate impact range of downstream of dam. The Analytic Hierarchy Process(AHP) was applied to determine the priority of impact range calculation indices and items. As results of indices valuation, hydraulic & hydrological effect is the first priority, the second is eco & environmental, next are geomorphological and social effect. As results of items valuation, the design flood of dam is the first priority, the second is the natural flood & design flood of channel, next are the design flood rate of channel, drainage area and back water level caused by downstream of dam. In the case of Daechung dam, impact ranges were estimated 47.21 km in terms of the design flood of dam, 45.71 km of the design flood rate of channel, 13.94 km of the drainage area.

Analysis of Electrical Resistivity Change in Piping Simulation of a Fill Dam (필댐의 파이핑 재현시험시 전기비저항 변화 분석)

  • Ahn, Hee-Bok;Lim, Heui-Dae
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.4
    • /
    • pp.59-68
    • /
    • 2010
  • Piping, a common form of internal embankment erosion, is caused by progressive movement of soil particles through an embankment. The phenomenon commonly occurs with precursory signs of development of fractures in dam structures, but also occurs without any noticeable signs in dams that showed satisfactory dam performance for several years, due to dissolution of soluble material in an embankment. While piping accounts for nearly 50% of the causes for dam failure, few studies have been made for systematic evaluation of the phenomenon. In this study, we attempted to monitor the changes in electrical resistivities of fill-dam material while a saddle dam is dismantled for the construction of emergency spillways of Daechung dam. Two artificial subhorizontal boreholes were drilled into the embankment structure to simulate piping along the two artificial flow channels. Monitoring of changes in electrical resistivity showed an increase in resistivity values during piping. Thus, the investigation of resistivity over time could be an effective method for piping prediction.