• Title/Summary/Keyword: DAPA

Search Result 68, Processing Time 0.022 seconds

Ground High/Low Temperature Test for FA-50 Aircraft (FA-50 경공격기 전기체 지상 고/저온시험)

  • Ahn, Jong Hoon;Kim, Tae Ho;Woo, Seung Cheol;Cho, Young Kyun;Kim, Do Wan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.6 no.1
    • /
    • pp.41-46
    • /
    • 2010
  • The ground high/low temperature test objective is to check the normal ground operation of FA-50 aircraft in the extreme ground ambient conditions. The aircraft was exposed in climatic conditions of the basic climatic category according to the MIL-HDBK-310. For verified normal operation in the extreme high temperature, the high temperature test was performed in the hot regional type conditions and accentuated solar radiation heat. This test was performed at the test chamber in ADD where is in Haemi. This paper was described about the test procedure of FA-50 high/low temperature including preparation, testing and results.

  • PDF

SE Case Study in Eagle Acquisition Program (독수리구매사업 시스템엔지니어링 적용사례)

  • Lee, Hi-Jang;Lee, Dong-Seok;Ham, Hyuck-Sang;Rho, Kyun-Hyup;Kwon, Young-Hoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.9-16
    • /
    • 2007
  • To Manage the Defense Acquisition Process more efficiently, DAPA has looked over the applying SE process to the Eagle Acquisition Program. Based on comparing 'Requirement' with 'items suggested in the proposal' in RFP and analyzing the result by using Cradle, those items have been discovered with IPT, actualized and corrected. In addition, the computerized data base system makes easier to trace all changed and more efficiency to manage programs. Therefore, this study using SE in other acquisition program.

  • PDF

A Study on the System Requirement Development Process Improvement in Defense R&D Programs (국방 연구개발사업의 시스템 요구사항 개발 프로세스 개선)

  • Kim, Jung-Myong;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.3
    • /
    • pp.290-298
    • /
    • 2009
  • This paper proposes a novel process which can develop the system requirements in defense R&D programs. As the weapon systems become more complicated, the success and effectiveness of R&D outcome heavily depend on the application and tailoring of systems engineering process and methods. And, the accuracy and quality of system requirements are essential prerequisite to leverage the systems engineering process. To produce the artifacts of systems engineering such as OCD, ORD, and the systems requirements, the system user can write out requirement document using the proposed implementation process and templates without expending heavy work loads.

Airworthiness Design Study for the Modified Aircraft (개조 항공기 감항성 설계연구)

  • Ko, Joon Soo
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.21 no.4
    • /
    • pp.11-16
    • /
    • 2013
  • Airworthiness certification is a repeatable process implemented to verify that a specific aircraft can be safely maintained and operated within its approved flight envelope. Airworthiness certification activity for the FA-50 aircraft has been performed according to the Airworthiness Certification Criteria, issued in 2011 by DAPA. It is a right time to study the application of those existing ACC process and tools to the hypothetical modification aircraft. This paper describes airworthiness engineers view of the integrated activities required to substantiate the modified aircraft performance. The compliance methods applicable to the airworthiness certification criteria is also suggested. It will be useful for the establishment of the future Korea modified military aircraft's ACC with the risk assessment and methods of compliances tailored to the legacy aircraft.

Optimum Path Planning for Mechanical Manipulators (기계적 로보트팔을 위한 최적 경로 설계)

  • Kim, Tae-San;Bae, Jun-Kyung;Park, Chong-Kug
    • Proceedings of the KIEE Conference
    • /
    • 1988.07a
    • /
    • pp.941-944
    • /
    • 1988
  • To assure a successful completion of an assigned task without interruption, the hand of mechnical manipulator often travels along a preplanned path. This paper presents a method of obtaining a time sechdule of velocities and acceleration along the path, under the constraints. Because of the involvement of a linear performance index and a largr number of nonlinear constraints, the "method of approximate programming (AMP)" is applied. To overcome the false solutions AMP is modified. To reduce the computing time, a "direct approximate programming algorithm (DAPA)" is developed.

  • PDF

A Study on Architecture Development Methodology for the Improvement in the Connection between User and Developer in the Defence R&D Program (국방 연구개발사업의 "운용자-개발자"간 연계성 향상을 위한 아키텍처 개발 방법에 대한 연구)

  • Choi, Jeong-Hun;Kang, Seok-Joong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.6
    • /
    • pp.1113-1120
    • /
    • 2010
  • In this paper, we have proposed Architecture Development methodology which can connect both operational view and system view. The Functional Architecture can connect both user and developer, and it is located between Activity analysis and System analysis. We suggest the new architecture methodology using the Functional Architecture and it provides effect to analyze the connection between user(military) and developer(enterprise) in Defence R&D and the new Architecture with the feedback analyze activity on a point of system view and the new architecture make the functional architecture.

Transition of ACTD by Measuring the Technology Readiness Level (기술성숙도 측정을 통한 ACTD 과제 전이 결정에 관한 연구)

  • Bae, Yoon-Ho;Choin, Seok-Cheol;Moon, Hee-Seung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.1
    • /
    • pp.60-69
    • /
    • 2009
  • Recently, request far application of advanced commercial technology to the defense acquisition process, to reduce the budget and shorten development time, has been increased. To accomplish these goals, the Advanced Concept Technology Demonstration(ACTD) is used for the defense acquisition process in Korea. And User Utility Assessment is tested to make a decision for transition to acquisition process. But this process does not include measurement of technology maturity and impacts of interface and interaction among the technologies. In this research, we propose the needs of measurement of TRL and IRL and application of SRL to reduce the risk during development phase, to understand the relations of technologies, and to fulfill the requirement far transition of the ACTD project to system development and demonstration process.

A Study on the Improvement for RAM for Weapon Systems (무기체계 신뢰도 향상방안 연구)

  • Choi, Seok-Cheol;Son, Mun-Kuk
    • Journal of Applied Reliability
    • /
    • v.8 no.1
    • /
    • pp.39-59
    • /
    • 2008
  • The performance of weapon system, based on the acceleration of advanced scientific technology, has been reinforced to the state of precision, complexion and multi-function. People have given great interest for a long time on its development, acquisition cost and enormous expense of operation/support. Under this environmental situation, this research paper proposes two kinds of implementation that can improve the RAM(Reliability, Availability, Maintainability) on weapon system. The first section is to understand all of the actual states on its reliability, in the acquisition process and to make the improvement for RAM at the milestones on the acquisition steps. The next section is to establish a defense RAM center, which will be closely cooperated with acquisition organization such as Ministry of Defense, DAPA(Defense Acquisition Program Administration), DTaQ(Defense agency for Technology and Quality) and ADD(Agency for Defense Development), etc. and to conclusively improve the RAM of weapon system in South Korea.

  • PDF

A Study on Improvement of Defense R & D Program by PMB (PMB적용을 통한 국방연구개발 사업관리 개선방안 연구)

  • Choi, Seok-Cheol;Bae, Yun-Ho
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.2 s.25
    • /
    • pp.60-69
    • /
    • 2006
  • The PMB(performance measurement baseline) is the total time-phased budget plan against which program performance is measured. Additionally it is the schedule for expenditure of the resources allocated to accomplish program scope and schedule objectives, and is formed by the budget assigned. In this paper, we suggest an improvement of the R & D(research and development) program for defense acquisition by using the PMB and an application of the IBR(integrated baseline review) to review the PMB for project manager of the defense agency.

On the Process Improvement for Foreign Purchase Upgrade Programs in Weapon Systems Acquisition Based on Systems Engineering Method (국외상업구매를 통한 무기체계 성능개량사업에서 시스템공학 기반의 프로세스 개선)

  • Shin, Se-Kyoung;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8314-8324
    • /
    • 2015
  • It has been recognized that in keeping the national defense capability on a leading edge, not only the continued production of weapon systems but also the associated maintenance and upgrades are becoming the subjects of great importance. Based on systems engineering process, the domestic acquisition programs for weapons systems led by DAPA have made some advancement where both new systems development and systems upgrade have attracted attention. On the other hand, as a useful type of domestic acquisition the foreign purchase program has been conceived as a process of simply buying needed weapons from abroad. Therefore, if some degree of development is necessary in system upgrades by foreign purchase, many problems turned out to exist. To study a remedy is the objective of this paper. The issues are analyzed first and then a relevant process is proposed based on a systems engineering method. Also included in the improved process is on how to generate a requirement document and the corresponding template to meet the goals of the upgrades by development. By applying the proposed process and template in the foreign purchase upgrade programs, derivation of more appropriate requirements can be expected, thereby offering effective management of programs and target goals.