• Title/Summary/Keyword: Curtain Wall Process

Search Result 38, Processing Time 0.029 seconds

Performance Evaluations of Mock-up Tests for ALC Panel Curtain Wall in Building Exterior (ALC 패널을 활용한 건축물 외장 커튼월에 대한 Mock-up Test 성능 평가 연구)

  • Kim, Young-Ho;Lee, Yong-Soo
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2013
  • The green building is one of biggest factors to go the goal of energy saving and environmental conservation, reduction of energy consumption, friendly energy technology, recycling of resource, and environmental pollution reduction technology. The purpose of these green buildings realized by the energy-saving technology such as the exterior materials or curtain wall system. The curtain wall system is a element that come to insulated portions of building envelope that results in heat loss. The purpose of this paper is to carried out mock-up tests for exterior wall used in autoclaved lightweight concrete panels in green building practices. Mock-up test execute a mixed process between standard test procedure and complex test procedure based on AAMA 501(American Society for Testing and Materials) and ASTM 283, ASTM 330(American Society for Testing and Materials). In results, tests meet the requirements that grant values in steps of procedures provided on ASTM and AAMA. ALC panel is suitable for a exterior wall product to be gratified thermal cycling performance and structural capacity, deflection(H/200) and lateral displacement(H/50), for curtain walls.

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF

SUPPLY CHAIN MANAGEMENT SYSTEM FOR CURTAIN WALLS USING RFID TECHNOLOGY

  • Sangyoon Chin;Suwon Yoon;Yea-Sang Kim;Cheolho Choi;Do-Bum Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1022-1027
    • /
    • 2005
  • This research presents a collaborative supply chain management system for curtain walls using Radio Frequency IDentification (RFID) to track the product and information flow among participants in high-rise building construction projects. This resarch developed a process model and a strategy for effective utilization of RFID technology through the curtain wall life-cycle. Then an information management system was developed to support the supply chain management of curtain walls with incorporating RFID into curtain wall products flow throughout the life-cycle. The system has been tested for validation and verification in a real world project.

  • PDF

A Study on Participation of Consultant in Curtain Wall Construction (커튼월 공사에서의 단계별 컨설턴트 참여방안 연구)

  • Yoon Hyung-Soo;Yi Dong-Seob;Koo Cho-Jin;Hyun Chang-Tack
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.618-621
    • /
    • 2003
  • The purpose of this study was to propose the participation of consultant pertinent to ground situations. The careful consideration of participating consultant reduces life cycle cost. duration and improves quality. The first step is studying Curtain-wall construction process by researching the documents, and Second step is analyzing Curtain-wall construction's problem through having a interview with a concerned experts (Architect, Gene-con, Sub-con. Consultant). Then we study how consultant solves the problem, propose the way of participation of consultant. The way of participation consist of three phases. the first one is to participate in design & construction process and the second one is to participate in design process, the third one is to participate in construction process. These participations are decided by evaluating project, design phase. construction phase. The verification of these participating strategies was implemented by the interview with the experts.

  • PDF

Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations (초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

An Experimental Study on Thermal Breakage in Curtain Wall Glazing (커튼월 유리의 열파손에 관한 실험적 연구)

  • Lee, Jae-Hyun;Nam, Jung-Woo;Bang, Jung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.236-237
    • /
    • 2013
  • In recent years, the use of glass applied to curtain wall as a building facade material has increased in our nation. However, the non-tempered curved double glass is very easy to broke because it is difficult to guarantee the quality in process of making it into double glazing. So, it is more vulnerable to thermal breakage than tempered double glass. In this paper, surface temperature difference on curved double glazing was compared to that of heat strengthened glass and flat glass by conducting thermal breakage experiments. As a result, flat single glass was broken at temperature difference of 100~140 degrees but curved double glazing was broken at that of 40~60 degrees. Therefore, it was concluded that curved double glazing is more vulnerable than flat double glazing to thermal breakage, and it should be considered the possibility of thermal breakage when curtain wall glazing is applied as a building facade material.

  • PDF

Present State Investigation and Analysis of Cladding System in High rise Residential Buildings (초고층 주거건물 외피시스템의 현황조사 및 분석)

  • Seok Ho-Tae;Kwak Hyun-Chul;Song Seung-Yeong
    • Journal of the Korean housing association
    • /
    • v.15 no.5
    • /
    • pp.43-50
    • /
    • 2004
  • As residential buildings becomes high rise buildings, the new cladding system was needed for structure system, and unpredictable problems were found in it. The aim of this study is to analysis the present state and find improvement of indoor environment in high rise residential building, which used curtain wall system. Then, suggest to create comfortable indoor environment for high rise residential buildings in the process of design.

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

Multitasking Façade: How to Combine BIPV with Passive Solar Mitigation Strategies in a High-Rise Curtain Wall System

  • Betancur, Juan
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.4
    • /
    • pp.307-313
    • /
    • 2017
  • This paper outlines the processes and strategies studied and selected by the team during the design stages of the project for the incorporation of BIPV into the tower's façade. The goal was to create a system that helps reduce internal heating and cooling loads while collecting energy through photovoltaic panels located throughout the building. The process used to develop this façade system can be broken down into three stages. 1. Concept: BIPV as design catalyst for a high-rise building. 2. Optimization: Balancing BIPV and Human comfort. 3. Integration: Incorporating BIPV into a custom curtain wall design. The FKI Project clearly illustrates the evolution building enclosures from simple wall systems to high performance integrated architectural and engineering design solutions. This design process and execution of this project represent the design philosophy of our firm.