Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2016.05a
/
pp.160-162
/
2016
A compact model of tunnel field effect transistor (TFET) has been developed. The model includes a surface potentia calculation module and a band-to-band-tunneling current module. Model comparison with TCAD shows that the mode calculates TFET surface potential and drain current accurately.
In this paper, to make sure that the photovoltaic solar cell module of the system can be normal for output in each solar cell module, input and output unit is installed in the bypass device, and then through the voltage and current monitoring to determine abnormality of the solar cell module, in the case of abnormal occurring, the bypass device can be pass to the next solar module of the serial structure.
The Transactions of the Korean Institute of Power Electronics
/
v.10
no.4
/
pp.380-387
/
2005
We report the performance of an open-frame type low-voltage high-current DC-DC converter module developed using an active clamp forward converter circuit and single ended rectifier. The converter module is designed with the specifications of an 3.3V output voltage, 30A output current, 100W output power and 36-75V input voltage. The synchronous rectifier is used to reduce the conduction loss at high current level and constant current control using precision PCB resistance is adapted to enhance the over current protection function in the system configuration. A prototype converter module is successfully implemented within 8mm height and quarter brick size (58x37mm) and recorded an $95W/in^3$ power density, 90.6$\%$ efficiency and 0.07$\%$ voltage regulation for the entire Input voltage range, thereby demonstrating its application potentials to future telecommunication electronics.
The purpose of this study is to fabricate a sensor module to detect the resistive leakage current (Igr) in real time that occurs to low voltage electric lines and to verify its reliability. In the case of the developed sensor module, wires are inserted into the zero current transformer (ZCT) and current transformer (CT) in advance and then the branch line is connected to the circuit breaker. The measurement result of the resistance of the distribution panel equipped with the developed sensor module shows that the resistance is $0.151m{\Omega}$ between the R and R phases, $0.169m{\Omega}$ between the S and S phases, and $0.178m{\Omega}$ between the T and T phases, respectively. The insulation resistance measured at AC 500 V and 1,000 V is $0.08m{\Omega}$ between the R, S, T and N phases, respectively. Then, the insulation resistance measured at DC 500 V is $83.3G{\Omega}$ between the R, S, T and G terminal, respectively. In addition, the applied withstanding voltage is AC 220 V/380 V/440 V and it was found that characteristics between all phases are good. This study measured the standby power by installing the developed sensor module at the rear of the MCCB and switching the circuit breaker on sequentially. The standby power is 1.350 W when one circuit breaker is turned on, 1.690 W when 2 circuit breakers are turned on, and 4.371 W when 10 circuit breakers are turned on. This study also verified the reliability of the standby power of the distribution panel equipped with the developed sensor module using the Minitab Program (Minitab PGM). Since the analysis shows the statistical average of 1.34627 in the reliable range of normal distribution, standard deviation of 0.001874, AD of 0.554, and P value of 0.140, it is found that the distribution panel equipped with the developed sensor module has high reliability.
As Building Integrated Photovoltaic(BIPV) system replaces the conventional building finishing materials with PV modules, two function of electricity generation and building envelope can be expected. Therefore BIPV can be a good alternative technology for the 21 century environment-friendly buildings. The objective of this paper is to develope BIPV modules for a commercial buildings of which structure is mainly light-weight, curtain wall system. Two types of module are developed for a opaque part and a transparent part of building envelope. Current technology level and market status of Korea determines the configuration of developed BIPV modules. Architectural considerations for the integration of PV module to building envelope such as building structure, construction type, safety, regulation, maintenance etc. have been carefully reflected from the early stage of BIPV module design. Especially the survey result of current building envelope materials determines the size of unit BIPV modules and a unique cladding method for PV module installation is developed. Trial product of BIPV modules and cladding hardwares are manufactured and sample construction details for a demonstration building are proposed.
CIGS solar cells are thin film solar cells that have excellent light absorption coefficient and can be manufactured with high efficiency through the use of low materials. In Korea, they must pass KS certification for home and commercial installation. KS C 8562 is a standard for evaluating the durability of CIGS and thin film amorphous silicon solar modules and deals with contents such as light, temperature, humidity, and mechanical durability. Unlike general crystalline silicon solar modules, the CIGS solar module has a different behavior of output change through these environmental tests, so if it shows 90% or more of the rated output suggested by the manufacturer after the final test, it is judged to be a suitable product. In this paper, the output before and after individual tests was measured through the test method of KS C 8562 to observe the output change and to discover the vulnerabilities of the CIGS solar module when exposed to various environments. Through this, it was confirmed that humidity exposure was the most vulnerable and that it had output recovery characteristics for light (visible light and ultraviolet rays). This study attempted to present the output behavior characteristics and data of the CIGS module at the time when the high efficiency thin film photovoltaic module market is expected to be created in the future.
The main purpose of the UPS is to supply independent and stable power to connected equipment. In installing and operating the UPS system, songle module, three phase UPS in more benefit than multi module, songle phase UPS in the point of volume and cost. However, when supplying Rectifier with output power form three phase UPS, by connecting auto-transformer, occurred harmonic and ripple current makes output filter damaged and leads to nonlinear current coasted by unbalance load. Therefor, in this paper the aim of concentring compound-wound transformer and harmonic filter is supplying liner current by reducing harmonic and ripple current and improving unbalance in voltage and distortion in current wave.
Park, Hyeongsik;Jung, Jaesung;Shin, Myunghun;Kim, Sunbo;Yi, Junsin
Current Photovoltaic Research
/
v.4
no.3
/
pp.119-123
/
2016
We discussed various cover glass substrates available for photovoltaic (PV) modules, and investigated the fabrication methods of light trapping structures for the efficiency enhancement of PV modules: wet and dry etching or laser and direct patternings. We also introduced the analysis of haze at etched glass surfaces as a function of wavelength and also presented a anti-reflection coating technology for PV module.
For high voltage DC-DC converters, the parallel operation of several high voltage source modules is necessary to reduce the material cost. In the conventional parallel operation with HDC module control unit, it is difficult to repair the HDC system for the failure of control unit. To overcome these problems, new parallel operating algorithm for high voltage DC-DC converter is presented. The proposed algorithm has no main control unit and each module can be selected as the master according to the operating conditions. Therefore, one of modules can be replaced as the master immediately when the previous master module is failed. In addition, the extension of extra modules can be simple.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.22
no.10
/
pp.968-973
/
2012
Slam testing is a mandatory testing process to evaluate the fatigue resistance of a door plate module before delivering it to car makers. This process is very hard job to complete it since the testing facilities are considerably expensive and the required testing time is relatively very long, i.e. more than eight days for a single specimen. In this paper, an accelerated testing method of a door plate module is proposed using vibration test equipment instead of the current one by exposing to the critical excitation of a door glass. Under the proposed excitation method, the similar testing result can be evaluated within less than two hours. The suitability of the proposed testing method was demonstrated by comparing failure modes of both the current testing method and the proposed one.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.