• 제목/요약/키워드: Crossing Speed

검색결과 201건 처리시간 0.032초

영상처리를 이용한 구조물 변위측정을 위한 고속 알고리즘 (High Speed Image Processing Algorithm for Structure Displacement Measurement)

  • 오주성;이종운
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2006년도 하계종합학술대회
    • /
    • pp.835-836
    • /
    • 2006
  • For non-contact structure vibration displacement measurement system, an algorithm for image processing using high speed CCD camera is introduced. The system sets the target to the structure, take picture using camera and image processing is performed to display the vibration data. The algorithm flow is basic preprocessing, projection data generation and curve fitting to find three crossing points for calibration or one center point in limited area.

  • PDF

고속용 분기기를 통과하는 철도차량의 동특성 예측연구 (Study on the Dynamic Characteristics of Rolling Stocks Passing on the High Speed Turnout System)

  • 정우진;신정렬;양신추;김남포
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.226-233
    • /
    • 2000
  • This study has been performed to develop the practical method to estimate the change of dynamic characteristics of rolling stocks passing on the high speed turnout system. Each part of turnout system are modeled in consideration of alignment, enter angle and amount of deflection and they are used to achieve dynamic analysis with a train model. Analysis results are compared with test results to confirm its validation

  • PDF

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • 제32권1호
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

무신호 단일로 횡단보도에서 고령 보행자의 횡단행태조사 및 분석 (An Investigation of Road Crossing Behaviour of Older Pedestrians at Unsignalized Crosswalk)

  • 장정아;김정화;최기주
    • 대한교통학회지
    • /
    • 제34권3호
    • /
    • pp.207-221
    • /
    • 2016
  • 현재 우리나라 고령자의 보행사고건수는 전체 보행자 사고건수의 25.9%를 차지하고 있고 이중 고령자 사망사고는 57%에 달한다. 향후 다가올 고령사회를 대비하여 이러한 고령자 사고를 줄이기 위한 다양한 노력이 필요하다. 본 연구는 3차로 무신호 일반로 구간내 횡단보도지역에서 고령자와 비고령자의 횡단단계에 대한 이동행태지표를 정의, 조사 및 분석한 연구이다. 유의성 분석 결과, 고령자와 비고령자의 이동 행태상 몇 가지의 결과를 얻을 수 있었다. 첫째, 접근차량의 존재유무에 따라 고령자와 비고령자 간에 횡단보도 접근시간, 횡단보도 대기시간, 횡단보도 연석에서의 시선수, 횡단하면서의 시선수애 대한 통계적 차이가 존재하였다. 둘째, 횡단 보도 횡단시간의 경우 고령자는 비고령자의 1.16배가 더 소요되고, 고령자의 보행속도는 비고령자의 84.4%의 수준이다. 셋째, 보행수는 고령자가 비고령자에 비하여 약 1.12배가 많았고, 보폭의 크기는 고령자가 비고령자에 비하여 90%의 수준을 갖는 것으로 확인되었다. 넷째, 고령자는 횡단을 위해 대기하는 동안 연속된 차량의 차두간격이 비고령자 대비 1.67배 이상 크게 요구하고 있었다. 이러한 주요 분석 결과는 고령자 횡단 시설 및 도로설계 등에 기초적인 자료로서 활용이 가능할 것으로 기대된다.

터널내 교행 열차의 풍압에 대한 특성법 해석 (Analysis for Characteristics Method on Wind Pressure of Trains Crossing in Tunnel)

  • 남성원
    • 한국철도학회논문집
    • /
    • 제16권6호
    • /
    • pp.454-459
    • /
    • 2013
  • 열차가 터널에 고속으로 진입하면, 압력파가 발생한다. 열차 선두부의 진입에 의하여 발생한 압축파는 터널을 따라 진행되어 터널 출구에서 반사되어 팽창파로 되돌아오며, 후미부의 진입에 의하여 발생한 팽창파도 터널을 따라 전파되어 터널 출구에서 압축파로 반사되어 터널 입구로 되돌아 온다. 열차 선두부 및 후미부에 의하여 발생한 이러한 압력파는 터널 입구 및 출구에서 각각 반사되어 터널 내부를 왕복하며, 차량 객실에 탑승한 승객들에게는 이명감을 일으키고, 터널 출구에서는 환경소음의 일종인 미기압파를 발생시킨다. 터널에서의 큰 압력 변동은 터널의 최적 단면적 설계에도 주요 인자로 고려되고 있으며, 차체의 반복 피로 하중으로 작용하므로, 이에 대한 정량적 및 정성적 분석이 필요하다. 본 연구에서는 고정 격자계를 이용하여 개발한 특성 해법을 교행하는 열차에 대하여 적용하였으며, 교행시의 열차 선두부 및 후미부의 경계 조건식을 개발하여, X-t선도와 같이 해석하였다. 해석 결과, 교행 열차의 특정 터널진입 시간에 압력파 간의 상쇄가 일어남을 알 수 있었다.

단층대를 통과하는 터널의 안정성확보에 관한 연구 (A Study of Stability Evaluation for Tunnel at the Fault Zone Crossing)

  • 박인준;최정환;김수일
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.105-112
    • /
    • 2001
  • The purpose of this study is to assess the stability of tunnel for a high speed railway crossing the fault zone. The area where the tunnel crossed the fault zone can be unstable during construction and operation. Geotechnical investigations have been conducted to determine an optimum excavation method by obtaining the material properties around the fault zone and to check the stability of the tunnel. For the numerical analysis, the FLAC, numerical analysis code based on finite difference method, was utilized to analyze the behavior of the fault at three points having typical ground conditions. Based on the results of numerical analysis, the combinations of compaction grouting and LW grouting were determined as suitable methods for pre-excavation Improvement of the ground surrounding the tunnel opening. In conclusion, the stability of the tunnel construction for the high speed railway within the fault zone may be obtained by adopting the optimum excavation method and the reinforcement method. The numerical analysis based on FLAC program contains errors caused by assumptions used in numerical analysis, therefore constant monitoring with respect to the change of ground condition and groundwater is highly recommended to minimize the numerical error and the possibility of damage to tunnel.

  • PDF

직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구 (Railway Underground Crossing Method Using PC Slab)

  • 민경주;이방우;박병룡
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

심층 강화학습을 이용한 휠-다리 로봇의 3차원 장애물극복 고속 모션 계획 방법 (Fast Motion Planning of Wheel-legged Robot for Crossing 3D Obstacles using Deep Reinforcement Learning)

  • 정순규;원문철
    • 로봇학회논문지
    • /
    • 제18권2호
    • /
    • pp.143-154
    • /
    • 2023
  • In this study, a fast motion planning method for the swing motion of a 6x6 wheel-legged robot to traverse large obstacles and gaps is proposed. The motion planning method presented in the previous paper, which was based on trajectory optimization, took up to tens of seconds and was limited to two-dimensional, structured vertical obstacles and trenches. A deep neural network based on one-dimensional Convolutional Neural Network (CNN) is introduced to generate keyframes, which are then used to represent smooth reference commands for the six leg angles along the robot's path. The network is initially trained using the behavioral cloning method with a dataset gathered from previous simulation results of the trajectory optimization. Its performance is then improved through reinforcement learning, using a one-step REINFORCE algorithm. The trained model has increased the speed of motion planning by up to 820 times and improved the success rates of obstacle crossing under harsh conditions, such as low friction and high roughness.

4가지 선회보조 장치가 운전 성능에 미치는 영향: 장애 유무와 운전면허 유무에 따른 비교 (Influence of Four Types of Steering Assistive Devices on Driving Performance: Comparison of Normal and Disabled People with and without Driver's License)

  • 송정헌;김용철
    • 대한의용생체공학회:의공학회지
    • /
    • 제38권1호
    • /
    • pp.32-42
    • /
    • 2017
  • The aim of this study was to evaluate driving performance of Healthy and disabled groups (with or without driver's license) to control steering wheel by using steering assistive devices in the driving simulator. The persons with partial loss of use of all four limbs have problems in operation of the motor vehicle because of functional loss to operate steering wheel. Therefore, if steering assistive devices for grasping the steering wheel are used to control the vehicle on the road in persons with disabilities, the disabled persons can improve mobility in their community life by driving a motor vehicle safely. Ten healthy subjects (with or w/o driver's license) and ten subjects with physical disabilities (with or w/o driver's license) were involved in this study to evaluate driving performance to operate steering wheel by using four types of steering assistive devices (Single-pin, V-grip, Palm-grip, Tri-pin) in driving simulator. STISim Drive 3 software was used to test the steering performance in four scenarios: straight road at low and high speed of vehicle (40 km/h and 80 km/h), curved road at low and high speed of vehicle (40 km/h and 80 km/h). This study used two-way ANOVA in order to compare the effects of two factors (type of steering assistive device and subject group) in the three dependent variables of driving performance (the lateral position of vehicle, standard deviation of lateral position representing the variation of the left and right movement of the vehicle and the number of line crossing). The mean values of the three dependent variables (lateral position, standard deviation of lateral position, the number of line crossing) of steering performance were statistically significantly smaller for the healthy or disabled groups with driver's license than the other groups without driver's license on the curved road at high speed of vehicle compared to low speed of vehicle.

EU의 TSI 규정 및 국내 철도차량안전기준의 대형장애물 유한요소모델 개발과 분산형 고속열차의 충돌성능평가에 적용 (Development of FE Models of the Heavy Obstacle for the EU-TSI and Domestic Rolling Stock Safety Regulations and Application to Collision Evaluation of the Korean High-speed EMU)

  • 김거영;구정서
    • 한국철도학회논문집
    • /
    • 제14권4호
    • /
    • pp.333-340
    • /
    • 2011
  • 본 논문은 유럽 TSI와 국내철도차량안전기준에 정의된 건널목 충돌사고시나리오에서 요구하는 성능의 대형 변형체 장애물의 유한요소 모델에 대하여 2가지 종류의 모델을 개발하여 한국형 분산형 고속철도 차량에 적용하고 평가하였다. 규정에서 요구하는 대형 장애물은 기존 강체모델에서 현재의 변형체모델로 변경되었으며 규정에 정의된 방법으로 변형체 강성 값이 검증되어야 한다. 여러 번의 시뮬레이션을 통해 기준을 만족하는 균일한 밀도와 강성의 솔리드 형 장애물 모델과 균일하지 않은 셸 형 장애물 모델 등 2가지를 개발하였다. 본 연구에서 개발된 대형장애물을 사용하여 분산형 고속열차를 대상으로 규정의 대형장애물 충돌시뮬레이션을 수행하였고 그 결과를 평가하였다. 셸 형과 솔리드 형 장애물은 열차와 충돌 후 거동에 상당한 차이가 있었고, 셸 모델이 더 가혹한 결과를 나타내었다.