A Study on the Proper Rate of the Safety Management Cost under the Construction Technology Promotion Act by Direct Calculation (건설기술진흥법 상 안전관리비에 대한 적산 및 품셈을 통한 적정 요율 산정에 관한 연구)

  • Chae, Yong Sup;Yoon, Young Geun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.68-75
    • /
    • 2018
  • The safety management cost system under the Construction Technology Promotion Act has contributed greatly to the prevention of construction accidents according to the chronological changes and social demand, but various problems have been pointed out. The biggest problem is that the safety management cost is earmarked very low because other items of safety management costs except for the safety inspection are not appropriately included in the actual construction site. Furthermore, it has been pointed out that it is difficult to settle the orderer due to the lack of specific use criteria. Therefore, in order to secure the proper safety management cost, this study is to estimate the actual cost by using of specification, quantity, material cost, labor cost for each type of the safety management item The results of this study were compared with the 71 cases of safety management costs in the safety management plan. In addition, analysis of unclear or unnecessary items in the current safety management cost and criteria and suggestions for improvement are provided. It is hoped that the results of this study will contribute to the rational safety management rate calculation.

Improvement Plan for the Payment Standard of Rental Fee in Construction New Technology (건설신기술 사용료 지급기준 개선방안)

  • Park, Hwan-Pyo;Oh, Un-O
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.193-201
    • /
    • 2006
  • The Evaluation system of Excellent Construction Technology has been operated for 15 years from 1990 in Korea. 443 technologies have been certified as Excellent Construction Technology(ECT) and those ECTs are adapted over 20,000 times into the construction projects. As a result of investigation, new technology evaluation system became a stable stage because new technology evaluation system has assigned about 433 and also applied more than 20,000 times in construction sites in 2004. However, it was indicated to a large problem that there aren't still detail criteria of cost assessment for using ECTs. Therefore, we analyzed the status and problems of the cost of using ECTs and suggested some useful ideas which are reviewed by various aspects. Specially we suggested specified criteria for the cost assessment of using ECTs. It is based on the scheduled construction cost and determined the rate $({\bullet}{\cdot})$ of using ECTs. To adapt ECTs into construction projects nationwide not only it is very important to certify better new technologies but also it is required to make the criteria of cost assessment for using ECTs.

Redeveloped Work Criteria and Cost Unit in Grassland Establishment (초지조성방법에 따른 작업항목의 재설정 및 초지조성단가 추정)

  • Yoon, Byung Ku;Kim, Ji Yung;Kim, Byong Wan;Sung, Kyung Il
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.42 no.1
    • /
    • pp.32-40
    • /
    • 2022
  • In this study, the appropriate unit cost in grassland establishment was redeveloped by the grassland establishment method and work criteria. The grassland establishment method was divided into tillage establishment (all logging) and no-tillage establishment (all logging and partial logging). The price for the work criteria by the establishment method was presented for each permission/authorization and establishment work. In permission/authorization for grassland establishment, the cost of each work criteria was of environmental impact (small scale environmental impact) assessment, disaster impact assessment, cadastral serving fee, forest survey, and connection fee for control of mountainous districts. In establishment was of logging, cleaning/gruffing, plowing/soil preparation, seeding, fertilization, livestock manure compost, seed, herbicide, labor cost (fertilizer, seed and herbicide), soil consolidation, cattle trail, and fence. The unit cost of grassland establishment was KRW 115,894,212 for the tillage establishment, and KRW 110,281,572 and KRW 106,680,122 for the all and partial logging of the no-tillage establishment, respectively. The current study redeveloped the establishment method, work criteria, and estimation of the unit cost of grassland establishment. It can be usefully used to carry out government projects to support related to establishment and maintenance of grassland.

A Study on the Power Expansion Planning Model using Multi-criteria Decision Making Rule (다기준 의사결정 모형을 이용한 전력수급계획 모형에 관한 연구)

  • Han, Seok-Man;Kim, Bal-Ho H.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.3
    • /
    • pp.462-466
    • /
    • 2009
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning can't use cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi-criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.

Optimal Software Release Using Time and Cost Benefits via Fuzzy Multi-Criteria and Fault Tolerance

  • Srivastava, Praveen Ranjan
    • Journal of Information Processing Systems
    • /
    • v.8 no.1
    • /
    • pp.21-54
    • /
    • 2012
  • As we know every software development process is pretty large and consists of different modules. This raises the idea of prioritizing different software modules so that important modules can be tested by preference. In the software testing process, it is not possible to test each and every module regressively, which is due to time and cost constraints. To deal with these constraints, this paper proposes an approach that is based on the fuzzy multi-criteria approach for prioritizing several software modules and calculates optimal time and cost for software testing by using fuzzy logic and the fault tolerance approach.

A Study on Integrated Airworthiness Certification Criteria for Avionics Software Safety and Security (항공소프트웨어 안전과 보안을 위한 통합 감항 인증기준 개발 연구)

  • Han, Man-Goon;Park, Tae-Kyou
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.46 no.1
    • /
    • pp.86-94
    • /
    • 2018
  • As the use of software is increasing in aircraft system, an exposure to the threat of safety and security also continues to grow. Although certification criteria for software safety such as DO-178C have already been established, specific certification criteria for software security have not yet been included. Recently DO-326A, DO-356 and DO-355 have been published separately for aircraft and system airworthiness security certification criteria. However, to comply individual certification criteria and procedures, it requires the additional cost and effort. Therefore, this paper proposes the efficient integrated certification criteria saving cost, effort and time by combining the certification criteria for software safety and security.

A Revised Benefit-Cost Analysis of the Korean TUR Program (우리나라 고독성물질 사용저감 규제의 수정 편익-비용분석)

  • Yoon, Daniel Jongsoo;Byun, Hun-Soo
    • Clean Technology
    • /
    • v.26 no.3
    • /
    • pp.168-176
    • /
    • 2020
  • The introduction of the Korea toxics use reduction (TUR) program to build a clean society is generally evaluated based on social economic criteria. Among various techniques, benefit-cost analysis is the most commonly used. This method is focused on the calculation and comparison of all the benefits and costs attributable to the TUR program. However, since it is reasonable to consider not only economic criteria but also policy criteria in the process of evaluation, it is necessary to reflect on the criteria weights found in the benefits and costs. This study aims at developing a new evaluation technique to achieve this purpose and apply it to the Korean TUR program to be implemented in 2020. This study selected competitiveness, toxic substances' emission reduction ratio, and health improvement as policy criteria. The Analytic Hierarchy Process (AHP) technique was initially used to calculate the weight and then, based on the results, the concept of information entropy introduced by Claude Shannon was used to eliminate subjective bias. As a result of the study, it was found that the revised benefit-cost analysis considering the weights of the policy criteria, as well as the existing economic criteria, could be a reasonable alternative in evaluating the feasibility of TUR regulations for highly toxic substances.

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

The Study of Risk Acceptance Criteria for Railway System (철도시스템의 위험도 허용 기준 개발에 관한 연구)

  • Kim, Young-Sang;Maeng, Hee-Young;Wang, Jong-Bae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.796-805
    • /
    • 2008
  • Safety Management of Korean railway industry has been rapidly changed into a risk-based approach adopted by developed countries since Railway Safety Act 2004, Rolling Stock Risk Assessment Guidance and its following regulations came into force. The fundamental requirements for the risk-based safety management is to carry out a systematic hazard identification and quantified risk analyses including cost-benefit analyses, but there has been rare a serious discussion over risk acceptance criteria and value of life in order to be able to judge the results of risk analyses and carry out cost-benefit analyses. This study presents the results of a review of risk acceptance criteria and value of life which may be adoped to Korean railway industry through the analyses with comparison of risk accepatnce principles and risk accepatnce criteria which have been already applied to other countries or other railway operators.

  • PDF

A Study on the Inventory Cost Estimation Criteria Considering Supply Chain Characteristics of a Electronic Product Manufacturer (전자제품 제조사 관점에서의 공급사슬 특성을 고려한 재고비용 산정 기준의 제시)

  • Nam, Jung-Hoon;Hwang, Seung-June
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.15-25
    • /
    • 2016
  • SCM activities in a company are considered as total innovation through synchronizing supply and demand while maintaining appropriate inventory level and reducing the business operating costs. Until now, even several researches are carried out on the SCM performance of the companies which have introduced and been operating SCM, the research on the cost analysis for the inventory which occurs frequently on supply chain is still insufficient. Especially, for the electronics industry in which the product depreciation is sharp caused by the short product life cycle and the complexity of distribution channels, even the inventory related costs are a major factor in business management, since the current estimated criteria of inventory costs are limited to the interest and maintenance management costs, the criteria do not reflect the total influence of the product depreciation and lost opportunity cost which are related to the business management. Furthermore, even though the rapid price drops of the distributor inventory caused by the frequent new model launch can be covered by the product manufacturers, the scale of total costs related to the inventory has not been conceived because the price compensation is traditionally considered as a market costs. In this research, we analyzed the inventory characteristics of electronics industry in which the price depreciation happens frequently, newly defining the estimated criteria of the product total inventory cost which includes price depreciation from the product manufacturers' view. Finally we focus on the case study of a representative electronics company and verify the scale of the influence on management performance.