• Title/Summary/Keyword: Crew Productivity

Search Result 31, Processing Time 0.018 seconds

Analysis of the Crew Productivity and Influence Factor for Special-Plant Reinforce Concrete (특수 플랜트 철근콘크리트 공종의 작업조 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-HO;Ahn, Young-Chull;Oh, Jae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.42-43
    • /
    • 2014
  • Few studies on crew productivity has been conducted, although the data is significant for time and cost estimation. Crew productivity data was collected for over 9 months from a nuclear power plant and analysed in order to identify factors driving the productivity. It was revealed that the crew productivity of form work, rebar work and concrete pouring work was 45.64(㎡/crew·day), 2.93(t/crew·day), 110.25(㎡/crew·day) on average respectively. Moreover, 'nightwork', 'No. of workers per crew' and 'total work amount' were identified as drivers.

  • PDF

Quantitative Analysis on Factors Affecting Crew Productivity : Crew Size

  • Huh Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.146-152
    • /
    • 2004
  • Consideration of factors driving crew productivities is imperative for accurate construction time estimation. Their impacts need to be well understood by estimators. There have been, however, little studies that quantified relationships between crew productivities and factors. This paper quantifies impacts of $^{\circ}A$ECrew size $^{\circ}\phi$ on crew productivities, for three highway concrete bridge activities, namely Column, Cap, and Deck, based on data compiled from 17 on-going highway projects in Texas State, USA. It was found that, for Bridge Deck operation, an increase of one crew-worker of formwork and rebarwork by one, leads to an increase of the productivity (cy/crew day) by 2.5 and 2.9, respectively. For the other activities, larger crew sizes did not lead to better crew productivities.

Analysis of the Productivity and Influence Factor for Special-Plant Formwork (특수 플랜트 형틀공종의 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-HO;Oh, Jae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.90-91
    • /
    • 2013
  • In the field of nuclear power construction, management and the systematic construction is very necessary. For more efficiently managing, analysis of influence factors and productivity is indispensable now. On this research, we collected the data from the nuclear power plant which is located in Korea. We analyzed the productivity and influence factors. As a result, productivity was 0.75(㎡/man·hour).On one hand, the productivity should be personnel, weather and whether there is a night duty or not. On the other hand, work crew depends upon operators, formwork amount, the presence or absence of night duty.

  • PDF

Analysis of Major Management Factors Affecting Crew Productivity in Road Bridge Construction Site Using IPA (IPA를 이용한 도로교량 골조공사의 작업조 생산성 관리요인의 중요도 및 실행도 분석)

  • Huh, Young-Ki;Lee, Sang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.39-45
    • /
    • 2019
  • Crew productivity in the construction industry is an important indicator of soundness and efficiency of work process, since all works in a site are conducted as groups of people. A survey was conducted in order to reveal importance and performance of major management factors affecting crew productivity in road bridge construction site using IPA. As a result of the analysis, it was found that 'Construction equipment' and 'Human resource related' factors among five major-categories are most important but with low performance. Furthermore, from another analysis with 27 factors of sub-categories, it is revealed that factors needed sustained attention are four, namely 'Just-in-time machinery delivery', 'Formation of a crew members', 'Skill of workers', and 'Site control and management', whereas those needed much more improvement are five, such as 'Machinery performance', 'Clearity of Design', 'Clearity of shop drawing', 'Timing of work instruction and approval', and 'Clearity of work instruction'. Findings from this study will enable road agencies as well as road construction experts to enhance crew productivity in a site.

The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity

  • Hyun, Chang-Taek;Hong, Tae-Hoon;Ji, Soung-Min;Yu, Jun-Hyeok;An, Soo-Bae
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.37-43
    • /
    • 2011
  • Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.

PROBABILISTIC MODEL-BASED APPROACH FOR TIME AND COST DATA : REGARDING FIELD CONDITIONS AND LABOR PRODUCTIVITY

  • ChangTaek Hyun;TaeHoon Hong;SoungMin Ji;JunHyeok Yu;SooBae An
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.256-261
    • /
    • 2011
  • Labor productivity is a significant factor related to control time, cost, and quality. Many researchers have developed models to define method of measuring the relationship between productivity and various constraints such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only contains the average productivity data of the construction industry, and it is difficult to predict the time and cost of any particular project; hence, there are some errors in estimating duration and cost for individual activity and project. To address these issues, this research collects data, measures productivity, and develops time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites and it is possible that the result will be used as the EVMS baseline of cost management and schedule management.

  • PDF

A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF