Proceedings of the Korean Institute of Building Construction Conference
/
2014.05a
/
pp.42-43
/
2014
Few studies on crew productivity has been conducted, although the data is significant for time and cost estimation. Crew productivity data was collected for over 9 months from a nuclear power plant and analysed in order to identify factors driving the productivity. It was revealed that the crew productivity of form work, rebar work and concrete pouring work was 45.64(㎡/crew·day), 2.93(t/crew·day), 110.25(㎡/crew·day) on average respectively. Moreover, 'nightwork', 'No. of workers per crew' and 'total work amount' were identified as drivers.
Korean Journal of Construction Engineering and Management
/
v.5
no.3
s.19
/
pp.146-152
/
2004
Consideration of factors driving crew productivities is imperative for accurate construction time estimation. Their impacts need to be well understood by estimators. There have been, however, little studies that quantified relationships between crew productivities and factors. This paper quantifies impacts of $^{\circ}A$ECrew size $^{\circ}\phi$ on crew productivities, for three highway concrete bridge activities, namely Column, Cap, and Deck, based on data compiled from 17 on-going highway projects in Texas State, USA. It was found that, for Bridge Deck operation, an increase of one crew-worker of formwork and rebarwork by one, leads to an increase of the productivity (cy/crew day) by 2.5 and 2.9, respectively. For the other activities, larger crew sizes did not lead to better crew productivities.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.11a
/
pp.90-91
/
2013
In the field of nuclear power construction, management and the systematic construction is very necessary. For more efficiently managing, analysis of influence factors and productivity is indispensable now. On this research, we collected the data from the nuclear power plant which is located in Korea. We analyzed the productivity and influence factors. As a result, productivity was 0.75(㎡/man·hour).On one hand, the productivity should be personnel, weather and whether there is a night duty or not. On the other hand, work crew depends upon operators, formwork amount, the presence or absence of night duty.
Korean Journal of Construction Engineering and Management
/
v.20
no.3
/
pp.39-45
/
2019
Crew productivity in the construction industry is an important indicator of soundness and efficiency of work process, since all works in a site are conducted as groups of people. A survey was conducted in order to reveal importance and performance of major management factors affecting crew productivity in road bridge construction site using IPA. As a result of the analysis, it was found that 'Construction equipment' and 'Human resource related' factors among five major-categories are most important but with low performance. Furthermore, from another analysis with 27 factors of sub-categories, it is revealed that factors needed sustained attention are four, namely 'Just-in-time machinery delivery', 'Formation of a crew members', 'Skill of workers', and 'Site control and management', whereas those needed much more improvement are five, such as 'Machinery performance', 'Clearity of Design', 'Clearity of shop drawing', 'Timing of work instruction and approval', and 'Clearity of work instruction'. Findings from this study will enable road agencies as well as road construction experts to enhance crew productivity in a site.
Journal of Construction Engineering and Project Management
/
v.1
no.1
/
pp.37-43
/
2011
Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.
ChangTaek Hyun;TaeHoon Hong;SoungMin Ji;JunHyeok Yu;SooBae An
International conference on construction engineering and project management
/
2011.02a
/
pp.256-261
/
2011
Labor productivity is a significant factor related to control time, cost, and quality. Many researchers have developed models to define method of measuring the relationship between productivity and various constraints such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only contains the average productivity data of the construction industry, and it is difficult to predict the time and cost of any particular project; hence, there are some errors in estimating duration and cost for individual activity and project. To address these issues, this research collects data, measures productivity, and develops time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites and it is possible that the result will be used as the EVMS baseline of cost management and schedule management.
Korean Journal of Construction Engineering and Management
/
v.12
no.6
/
pp.42-53
/
2011
This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.6
/
pp.2519-2528
/
2013
The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.
Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.171-174
/
2009
The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.
Korean Journal of Construction Engineering and Management
/
v.2
no.3
s.7
/
pp.101-109
/
2001
Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.