• Title/Summary/Keyword: Crane systems

Search Result 245, Processing Time 0.032 seconds

Measurement and Modeling of Job Stress of Electric Overhead Traveling Crane Operators

  • Krishna, Obilisetty B.;Maiti, Jhareswar;Ray, Pradip K.;Samanta, Biswajit;Mandal, Saptarshi;Sarkar, Sobhan
    • Safety and Health at Work
    • /
    • v.6 no.4
    • /
    • pp.279-288
    • /
    • 2015
  • Background: In this study, the measurement of job stress of electric overhead traveling crane operators and quantification of the effects of operator and workplace characteristics on job stress were assessed. Methods: Job stress was measured on five subscales: employee empowerment, role overload, role ambiguity, rule violation, and job hazard. The characteristics of the operators that were studied were age, experience, body weight, and body height. The workplace characteristics considered were hours of exposure, cabin type, cabin feature, and crane height. The proposed methodology included administration of a questionnaire survey to 76 electric overhead traveling crane operators followed by analysis using analysis of variance and a classification and regression tree. Results: The key findings were: (1) the five subscales can be used to measure job stress; (2) employee empowerment was the most significant factor followed by the role overload; (3) workplace characteristics contributed more towards job stress than operator's characteristics; and (4) of the workplace characteristics, crane height was the major contributor. Conclusion: The issues related to crane height and cabin feature can be fixed by providing engineering or foolproof solutions than relying on interventions related to the demographic factors.

Boundary Control of Container Crane;Two-Stage Control of a Container Crane as Nonflexible and Flexible Cable

  • Park, Hahn;Hong, Keum-Shik
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.153-158
    • /
    • 2004
  • In this paper, we proposed a two-stage control of the container crane. The first stage control is time-optimal control for the purpose of fast trolley traveling. With suitable trolley velocity patterns, the sway which is generated during trolley moving is minimized. At the second stage control feedback control law is investigated for the quick suppression of residual vibration after the trolley motion. For more practical system, the container crane system is modeled as a partial differential equation (PDE) system with flexible cable. The dynamics of the cable is derived as a moving system with tension caused by payload using Hamilton's principle for the systems. A control law based upon the Lyapunov's method is derived. It is revealed that a time-varying control force and a suitable passive damping at the actuator can successfully suppress the transverse vibrations.

  • PDF

Robust Adaptive Control of 3D Crane Systems with Uncertainty (불확실성 요소를 갖는 3D 크레인 시스템의 강인적응제어)

  • Jeong, Sang-Chul;Kim, Dong-Won;Lee, Hyung-Ki;Cho, Hyun-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.102-108
    • /
    • 2008
  • This paper presents robust and adaptive control method for complicated three dimensional crane systems with uncertain effect. We consider an overhead crane system in which a trolly located on its top is moved to x- and y-axis independently. We first approximate the complicated crane model through linearization approach to simply construct a PD control and then design an adaptive control system for compensating modeling error and control deviation which is feasibly occurred due to system perturbation in practice. An adaptive control scheme is analytically derived using Lyapunov stability theory for a given bound of system perturbation. We accomplish numerical simulation for evaluation of the proposed control system and demonstrate its superiority comparing with the traditional control strategy.

Position Control of AS/RS Stacker Crane By Using Cain-Scheduled Control Method in Automated High Rack Warehouse System

  • Kim, Hwan-Seong;You, Sam-Sang;Shigeyasu Kawaji
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.198-201
    • /
    • 1999
  • An automated storage and retrieval machinery for high rack warehouse systems is developed in order to stack the various kinds of productions. However, according to increase in the rack height, the long lead time should be taken. In stacker crane systems, the variations of the lifting height and the load generate the vibration of lifting machine, and it makes a Position control to be difficult Therefore, the reduction of vibration will be important factor for saving the lead time and the damage of Productions. This paper deals with a position control of stacker crane in automated high rack warehouse system by using a gain-scheduled control algorithm via a LMI method, where the variations of elastic coefficient of the stacker crane's post are considered.

  • PDF

Status of Fatal Crane Accidents and Their Safety Measures (크레인 사망 재해 실태와 안전 대책)

  • Kee, Do-Hyung;Kim, Won-Ki
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.1 s.69
    • /
    • pp.137-142
    • /
    • 2005
  • This study aims to survey the fatal industrial accidents attributed to crane, and to present their preventive measures based on the results of the survey. The survey was on the basis of 60 fatal accidents caused by crane from January 1998 to July 2003. The results showed that 1) of varying types of crane, fatal accidents were most frequently caused by mobile no: 2) more crane accidents occurred on weekend of Friday and Saturday by a day of the week; 3) experienced crane operators with long length of work or the age of over 40 were more frequently subjected to fatal accidents compared to novice operators; and 4) crane accidents were more attributable to unsafe acts such as poor working method, non-observance for safe working rules, etc. than hardware aspects of crane itself. It is recommended that for reducing crane accidents, more practical education and training for crane operation be reinforced.

Development of the Position Control Algorithm for Nonlinear Overhead Crane Systems (비선형 천장 크레인시스템의 위치제어 알고리즘 개발)

  • 이종규;이상룡
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.4
    • /
    • pp.142-147
    • /
    • 2000
  • An overhead crane system which transports an object by girder motion, trolley motion, and hoist motion becomes a nonlinear system because the length of a rope changes. To develope the position control algorithm for the nonlinear crane systems, we apply a nonlinear optimal control method which uses forward and backward difference methods and obtain optimal inputs. This method is suitable for the overhead crane system which is characterized by the differential equation of higher degree and swing motion. From the results of computer simulation, it is founded that the position of the overhead crane system is controlled, and the swing of the object is suppressed.

  • PDF

Integrated Simulations of a Floating Crane Installation Vessel with DP systems in Waves

  • Nam, B.W.;Hong, S.Y.;Kim, Y.S.;Kim, J.W.
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.1 no.2
    • /
    • pp.85-93
    • /
    • 2015
  • The nonlinear time-domain analysis method was implemented to carry out a series of integrated simulations for a deep-water crane vessel system composed of four sub components, including a floating vessel, lifted equipment, hoisting cable and dynamic positioning (hereinafter DP) system. The analysis of the coupled dynamics consists of the crane vessel and equipment connected using the crane wire, and the DP is modeled according to the wind, wave and current conditions. The DP systems were numerically implemented using a classical PD feedback controller, and various simulations of the deepwater installation were conducted using different conditions in order to evaluate the global performance of the floating crane vessel combined with the DP system.

Anti-swing and position control of crane using fuzzy controller (퍼지제어기를 이용한 크레인의 진동억제 및 위치제어)

  • Jeong, Seung-Hyun;Park, Jung-Il
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.3 no.5
    • /
    • pp.435-442
    • /
    • 1997
  • The roof crane system is used for transporting a variable load to a target position. The goal of crane control system is transporting the load to a goal position as quick as possible without rope oscillation. The crane is generally operated by an expert operator, but recently an automatic control system with high speed and rapid tansportation is required. In this paper, we developed a simple fuzzy controller which has been introduced expert's knowledge base for anti-swing and rapid tranportation to goal position. In particular, we proposed the synthesis reasoning method which synthesizes on the basis of expert knowledge of the angle control input and position control input which are inferenced parallel and simultaneously. And we confirmed that the performance of the developed controller is effective as a result of applying it to crane simulator and also verified whether the proposed synthesis rules have been applied correctly using clustering algorithm from the measured data.

  • PDF

A Study on Adaptive Control of 3D Crane Systems : Implementation of a Real-time Simulator (3D 크레인 시스템 적응제어에 관한 연구 : 실시간 시뮬레이터 구현)

  • Song, C.H.;Cho, H.C.;Lee, J.W.;Lee, Y.J.;Lee, K.S.
    • Journal of Power System Engineering
    • /
    • v.12 no.6
    • /
    • pp.36-41
    • /
    • 2008
  • A crane is very important mechanical systems in industrial applications to move huge objects. Especially, in marine port terminals, it is used to place container boxes at desired position within given operating time. However, such system is faced with environmental disturbance such as wind from the sea, thus crane control system is required to cope with this nature. This paper proposed robust and adaptive control algorithm of a complicated 3D crane against the environmental disturbance. We simplify a mathematical design procedure to derive our control algorithm. We conduct real-time experiment using a crane simulator to evaluate its superiority and reliability.

  • PDF

Development of partial state feedback control algorithm for nonlinear overhead crane whose two axes are moved simultaneously (두 축이 동시에 운동하는 비선형 천장 크레인의 부분상태 궤환제어 알고리즘 개발)

  • 이종규;이상룡
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.395-398
    • /
    • 1996
  • In this study, when the nonlinear overhead crane which allows simultaneously travel and traverse motion moves a desired transport route, the object suspended the end of rope does undesirable swing motion. Nonlinear overhead crane pertubes in the vicinity of an operating point, therefore the nonlinear overhead crane is modified to linear overhead crane for the operating point. The linear overhead crane was controlled to swing angles of the object by the ratio of torque inputs to motors of the girder and the trolley. As a basis for the result of the linear overhead crane, the nonlinear overhead crane was controlled swing angles of the object and positions of the overhead crane without collision with environmental equipment by partial state feedback control.

  • PDF