• Title/Summary/Keyword: Cost-increasing factor

Search Result 206, Processing Time 0.032 seconds

Study on the Fueling Economic Feasibility of Plug-in Hybrid Electric Vehicle (플러그인 하이브리드 전기자동차의 연료 경제성에 관한 연구)

  • Roh, Chul-Woo;Kim, Min-Soo
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.4
    • /
    • pp.255-263
    • /
    • 2009
  • The most concerning issue of these days is the energy crisis caused by increasing threat of dependence on imported oil and volatile market trend. Under these circumstances, the PHEV(plug-in hybrid electric vehicle) is drawing attention for the next generation's car which could give a chance to decrease the dependence on imported oil and reduce the environmental impact of vehicle. The fueling cost of PHEV, one of the core factor of decision about buying car, should be calculated in the circumstances of Korea to make sure that PHEV has competitive power in real market. The fuel cost saving of PHEV versus CV(conventional vehicle) is simulated and discussed in the condition of increasing gasoline cost, electricity rate, and city-gas rate. In conclusion, the PHEV60-FS shows the best economic feasibility when gasoline price goes up. The PHEV20 has the most stable economic feasibility as electricity rate increases. The fuel cell cogeneration system for RPG could be an alternative for charger of PHEV in the near future.

Optimum design of steel floor system: effect of floor division number, deck thickness and castellated beams

  • Kaveh, A.;Ghafari, M.H.
    • Structural Engineering and Mechanics
    • /
    • v.59 no.5
    • /
    • pp.933-950
    • /
    • 2016
  • Decks, interior beams, edge beams and girders are the parts of a steel floor system. If the deck is optimized without considering beam optimization, finding best result is simple. However, a deck with higher cost may increase the composite action of the beams and decrease the beam cost reducing the total cost. Also different number of floor divisions can improve the total floor cost. Increasing beam capacity by using castellated beams is other efficient method to save the costs. In this study, floor optimization is performed and these three issues are discussed. Floor division number and deck sections are some of the variables. Also for each beam, profile section of the beam, beam cutting depth, cutting angle, spacing between holes and number of filled holes at the ends of castellated beams are other variables. Constraints include the application of stress, stability, deflection and vibration limitations according to the load and resistance factor (LRFD) design. Objective function is the total cost of the floor consisting of the steel profile cost, cutting and welding cost, concrete cost, steel deck cost, shear stud cost and construction costs. Optimization is performed by enhanced colliding body optimization (ECBO), Results show that using castellated beams, selecting a deck with higher price and considering different number of floor divisions can decrease the total cost of the floor.

What is the Switching Intention from Existing Payment to Mobile Payment Service?

  • Lee, Sae-Bom;Lee, Joon-Young;Moon, Jae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.6
    • /
    • pp.59-66
    • /
    • 2018
  • Recently, the use of mobile payment, called "Pay" payment, is increasing such as 'KakaoPay' and 'SamsungPay'. In Korea, various mobile payment services are running and emerging. The purpose of this study is to examine the intention to switch from using existing credit cards or check card to mobile payment service based on the two-factor theory. We empirically examined the effect of the two factors, the factors that enable switching and the factors that inhibit switching. Therefore, the study use switching cost and switching benefit as parameters to confirm the effect on the switching intention. In addition, this study intends to analyze the differences between two subgroups by the degree of personal innovativeness. We survey smartphone users and credit card or check card users, and analyzed the Smart PLS 3.0 using structural equation model to verify the significance of the research hypothesis.

Analysis of the Importance of Evaluation Factors for Automotive Procurement Logistics using AHP (AHP를 활용한 자동차 조달 물류 평가요인 중요도 분석)

  • Young-Kyou HA
    • Korea Trade Review
    • /
    • v.47 no.2
    • /
    • pp.19-29
    • /
    • 2022
  • This study evaluated the importance of automobile procurement logistics using AHP. Although automobile procurement and logistics is represented by JIT, internal and external risk factors for the automobile and logistics industries are increasing, so it is necessary to re-evaluate them and establish countermeasures. Therefore, this study conducted AHP analysis targeting 30 automobile procurement and logistics experts. Through previous studies and interviews, 4 factors for Tier 1 and 12 factors for Tier 2 were derived. As a result of AHP, the logistics factor was analyzed as the most important and the cost factor was less important than the other factors. This means that supply chain operation is more important than cost, and it is analyzed that stopping all supply chain participants is more damaging than logistics or inventory costs. Such research can provide implications not only for the automotive supply chain but also other industries with similar characteristics, and it is considered to be a meaningful study at the present time when the global supply chain is being reorganized.

Optimal Transmission Expansion Planning Considering the Uncertainties of Power Market (전력시장 불확실성을 고려한 최적 송전시스템 확장계획)

  • Son, Min-Kyun;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.560-566
    • /
    • 2008
  • Today, as the power trades between generation companies and power customer are liberalized, the uncertainty level of operated power system is rapidly increased. Therefore, transmission operators as decision makers for transmission expansion are required to establish a deliberate investment plan for effective operations of transmission facilities considering forecasted conditions of power system. This paper proposes the methodology for the optimal solution of transmission expansion in deregulated power system. The paper obtains the expected value of transmission congestion cost for various scenarios by using occurrence probability. In addition, the paper assumes that increasing rates of loads are the probability distribution and indicates the location of expanded transmission line, the time for transmission expansion with the minimum cost for the future by performing the Montecarlo simulation. To minimize the investment risk as the variance of the congestion cost, Mean-Variance Markowitz portfolio theory is applied to the optimization model by the penalty factor of the variance. By the case study, the optimal solution for transmission expansion plan considering the feature of market participants is obtained.

A Study on Utilizing DEA in Efficiency Evaluation of Social Welfare Agencies (자료포락분석(DEA)을 이용한 사회복지관의 효율성 평가에 관한 연구 : 부산지역 사례를 중심으로)

  • Son, Kwang-Hoon
    • Korean Journal of Social Welfare
    • /
    • v.52
    • /
    • pp.117-141
    • /
    • 2003
  • This study is to identify the efficiency in Busan social welfare agencies between input factors and output factors. For this purpose, gathered are the 2001 services reports of those study agencies. This study used 4 difference model, model 1; comparing input factor(social worker number & labor cost) about output factor(the total number of program used person), model 2; comparing input factor(the total number of social welfare agencies staff & the total working expenses) about output factor(the total number of program used person), model 3; comparing input factor(the total number of volunteer, social welfare agencies staff & a period of operation) about output factor(the total number of program used person), model 4; comparing input factor(the total number of volunteer, social welfare agencies staff, a period of operation & the total working expenses) about output factor(the total number of program used person). Charnes's study(1978) provided an analytical tool for efficiency services output of non-profit organizations, and DEA(Data Envelopment Analysis) was a analytical framework for evaluating the impact of social service outcome. the finding are as follows : (1) In the results of comparing 4 models as same standard, we can find 35-55%(16-25) efficiency agencies among the 45 social welfare agencies. (2) For all DMU becoming the efficiency 1 to standard of output factor, model 1; 33 agencies are increasing the social worker number($\Delta$0.8 number), 10 agencies are raising the labor cost of social worker($\Delta$1,189,000 Won), model 2; 30 agencies are increasing the total number of social welfare agencies staff($\Delta$1.25 number), 14 agencies are raising the total working expenses($\Delta$1,447,000 Won), model 3; 8 agencies are increasing the total number of social welfare agencies staff($\Delta$2.26 number), 14 agencies are increasing the total number of volunteer($\Delta$52 number), and 10 agencies are increasing a period of operation($\Delta$13 month), model 4; 24 agencies are increasing the total number of social welfare agencies staff($\Delta$1.8 number), 12 agencies are raising the total working expenses($\Delta$5,017,000 Won), 12 agencies are increasing the total number of volunteer($\Delta$43.2 number), and 23 agencies are increasing a period of operation($\Delta$16 month).

  • PDF

The Analysis of the Management Efficiency and Impact Factors of Smart Greenhouse Business Entities - Focusing on the Business Entities of Strawberry Cultivation in Jeolla-do - (스마트온실 경영체의 경영 효율성 및 영향요인 분석 - 전라권 딸기 재배 경영체를 중심으로-)

  • Ha, Ji Young;Lee, Seung Hyun;Na, Myung Hwan;Kim, Deok Hyeon;Lee, Hye Lim;Lee, Yong Gyeon
    • Journal of Korean Society for Quality Management
    • /
    • v.49 no.2
    • /
    • pp.213-231
    • /
    • 2021
  • Purpose: This study intends to provide decision-making information to improve efficiency by analyzing the management efficiency of smart greenhouse business entities and identifying factors that affect the efficiency based on input and output. Methods: The subjects of analysis were business entities for cultivating strawberries in smart greenhouses in Jeolla region (northern and southern Jeolla provinces), and the analysis focused on the management performance of the 2019-2020 crop period (year). Data Envelopment Analysis(DEA) was applied as an analysis method for efficiency analysis, Quantile Regression(QR) analysis was applied as a factor affecting the efficiency. Results: The reason for the efficiency gap between business entities was that there were many business entities that did not minimize the input cost at the current level of output, and the area where the variance among business entities was large was the fixed cost per 10a. In the results of the affecting factor analysis, it was found that the seed-seedlings cost, fertilizer cost, other material cost, and employment and labor cost had a negative (-) effect on the efficiency, and that the repair and maintenance cost had a positive (+) effect. Conclusion: Therefore, to achieve the efficiency of scale, it is necessary to reduce the input scale to an appropriate level. In the case of business entities with low efficiency by quartile, the seed-seedlings, fertilizer, and other material costs reduce expenditures, and repair maintenance costs can improve efficiency by increasing expenditures.

A Novel Single Phase Soft Switched PFC Converter

  • Altintas, Nihan
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1592-1601
    • /
    • 2014
  • In this study, a novel single phase soft switched power factor correction (PFC) converter is developed with active snubber cell. The active snubber cell provides boost switch both to turn on with zero voltage transition (ZVT) and to turn off with zero current transition (ZCT). As the switching losses in the proposed converter are too low, L and C size can be reduced by increasing the operating frequency. Also, all the semiconductor devices operate with soft switching. There is no additional voltage stress in the boost switch and diode. The proposed converter has a simple structure, low cost and ease of control as well. It has a simple control loop to achieve near unity power factor with the aid of the UC3854. In this study, detailed steady state analysis of the proposed converter is presented and this theoretical analysis is verified by a prototype of 100 kHz and 500 W converter. The measured power factor and efficiency are 0.99 and 97.9% at full load.

A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects (공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구)

  • You, Yong-Hwan;Lee, Kyoo-Hyun;Kim, Chong-Woen;Choi, In-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

A STUDY ON RISK WEIGHT USING FUZZY IN REAL ESTATE DEVELOPMENT PROJECTS

  • Sung Cho;Kyung-ha Lee ;Yong Cho ;Joon-Hong Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1176-1182
    • /
    • 2009
  • Due to recession in real estate market, interest of risk analysis is increasing. Feasibility study in the first stage takes a great role in a project. There are not objectified tools which are able to cope with uncertainty of project, and feasibility study based on selected method of determinism does not include liquidity of weight risk. Also, shortage of consideration for subjective and atypical external factors causes inappropriate results. Therefore, this study proposes feasibility study model focused on risk factor influences in construction cost and sales cost. Considering effective level of cost based on objective risk factors and probable weight of risk by this model, real workers are able to bring correct and scientific decisions better than former method based on selective analysis of real estate development.

  • PDF