• 제목/요약/키워드: Cost structure

Search Result 3,854, Processing Time 0.031 seconds

Tabu Search based Optimization Algorithm for Reporting Cell Planning in Mobile Communication (이동통신에서 리포팅 셀 계획을 위한 타부서치 기반 최적화 알고리즘)

  • Jang, Kil-woong
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.9
    • /
    • pp.1193-1201
    • /
    • 2020
  • Cell planning, which determines the cell structure for location management of mobile terminals in mobile communications, has been dealt with as an important research task to determine network performance. Among the factors influencing the cell structure planning in mobile communication, the signal cost for location management plays the most important role. In this paper, we propose an optimization algorithm that minimizes the location management cost of all the cells used to plan the cell structure in the network with reporting cell structure in mobile communication. The proposed algorithm uses a Tabu search algorithm, which is a meta-heuristic algorithm, and the proposed algorithm proposes a new neighborhood generation method to obtain a result close to the optimal solution. In order to evaluate the performance of the proposed algorithm, the simulation was performed in terms of location management cost and algorithm execution time. The evaluation results show that the proposed algorithm outperforms the existing genetic algorithm and simulated annealing.

An Index Structure for Updating Continuously Moving Objects Efficiently (연속적인 이동 객체의 효과적인 갱신을 위한 색인 구조)

  • Bok Kyoung-Soo;Yoon Ho-Won;Kim Myoung-Ho;Cho Ki-Hyung;Yoo Jae-Soo
    • The KIPS Transactions:PartD
    • /
    • v.13D no.4 s.107
    • /
    • pp.477-490
    • /
    • 2006
  • Existing index structures need very much update cost because they repeat delete and insert operations in order to update continuously moving objects. In this paper, we propose a new index structure which reduces the update cost of continuously moving objects. The proposed index structure consists of a space partitioning index structure that stores the location of the moving objects and an auxiliary index structure that directly accesses to their current positions. In order to increase the fanout of the node, it stores not the real partitioning area but kd-tree as the information about the child node of the node. In addition, we don't traverse a whole index structure, but access the leaf nodes directly and accomplish a bottom-up update strategy for efficiently updating the positions of moving objects. We show through the various experiments that our index structure outperforms the existing index structures in terms of insertion, update and retrieval.

Seismic Analysis of Bridges Accounting for Soil-Pile-Structure Interaction (지반-말뚝-구조물 상호작용을 고려한 교량구조물의 지진해석)

  • Kim, Moon-Kyun;Lim, Yun-Mook;Cho, Kyung-Hwan;Kim, Ji-Sun
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2005.03a
    • /
    • pp.405-412
    • /
    • 2005
  • In this study, a numerical method for soil-pile-structure interaction problems in multi-layered half-plane is developed. The total soil-pile-structure interaction system is divided into two parts namely, nonlinear structure part and linear soil-pile interaction parts. In the structure field, the general finite element method is introduced to solve the dynamic equation of motion for the structure. In the soil-pile structure interaction part, physical model consisting of lumped parameter, which is frequency dependent coefficient and determined by rigorous analysis method is introduced. Using proposed analysis procedure, the nonlinear behavior of structure considering soil-structure interaction can be efficiently determined in time domain and the analysis cost is dramatically reduced.

  • PDF

Cost Analysis of Home Care with Activity-Based Costing(ABC) (활동기준원가계산[ABC]을 적용한 가정 간호 원가 분석)

  • Lee Su-Jeong
    • Journal of Korean Academy of Nursing
    • /
    • v.34 no.6
    • /
    • pp.1117-1128
    • /
    • 2004
  • Purpose: This study was carried out to substantiate the application process of activity-based costing on the current cost of hospital home care (HHC) service. The study materials were documents, 120 client charts, health insurance demand bills, salary of 215 HHC nurses, operating expense, 6 HHC agencies, and 31 HHC nurses. Method: The research was carried out by analyzing the HHC activities and then collecting labor and operating expenses. For resource drivers, HHC activity performance time and workload were studied. For activity drivers, the number of HHC activity performances and the activity number of visits were studied. Result: The HHC activities were classified into 70 activities. In resource, the labor cost was 245₩per minute, operating cost was 9,570₩ per visit and traffic expense was an average of 12,750₩. In resource drivers, education and training had the longest time of 67 minutes. Average length of performance for activities was 13.7 minutes. The workload was applied as a relative value. The average cost of HHC was 62,741₩ and the cost ranged from 55,560₩ to 74,016₩. Conclusion: The fixed base rate for a visit in the current HHC medical fee should be increased. Exclusion from the current fee structure or flexible operation of traveling expenses should be reviewed.

Minimum life-cycle cost design of ice-resistant offshore platforms

  • Li, Gang;Zhang, Da-Yong;Yue, Qian-Jin
    • Structural Engineering and Mechanics
    • /
    • v.31 no.1
    • /
    • pp.11-24
    • /
    • 2009
  • In China, the oil and natural gas resources of Bohai Bay are mainly marginal oil fields. It is necessary to build both ice-resistant and economical offshore platforms. However, risk is involved in the design, construction, utilization, maintenance of offshore platforms as uncertain events may occur within the life-cycle of a platform under the extreme ice load. In this study, the optimum design model of the expected life-cycle cost for ice-resistant platforms based on cost-effectiveness criterion is proposed. Multiple performance demands of the structure, facilities and crew members, associated with the failure assessment criteria and evaluation functions of costs of construction, consequences of structural failure modes including damage, revenue loss, death and injury as well as discounting cost over time are considered. An efficient approximate method of the global reliability analysis for the offshore platforms is provided, which converts the implicit nonlinear performance function in the conventional reliability analysis to linear explicit one. The proposed life-cycle optimum design formula are applied to a typical ice-resistant platform in Bohai Bay, and the results demonstrate that the life-cycle cost-effective optimum design model is more rational compared to the conventional design.

(r, Q) Policy for Operation of a Multipurpose Facility (단일 범용설비 운영을 위한 (r, Q) 정책)

  • ;Oh, Geun-Tae
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.3
    • /
    • pp.27-46
    • /
    • 1992
  • This paper considers an (r, Q) policy for operation of a multipurpose facility. It is assumed that whenever the inventory level falls below r, the model starts to produce the fixed amount of Q. The facility can be utilized for extra production during idle periods, that is, when the inventory level is still greater than r right after a main production operation is terminated or an extra production operation is finished. But, whenever the facility is in operation for an extra production, the operation can not be terminated for the main production even though the inventory level falls below r. In the model, the demand for the product is assumed to arrive according to a compound Poisson process and the processing time required to produce a product is assumed to follow an arbitary distribution. Similarly, the orders for the extra production is assumed to accur in a Poisson process are the extra production processing time is assumed to follow an arbitrary distribution. It is further assumed that unsatisfied demands are backordered and the expected comulative amount of demands is less than that of production during each production period. Under a cost structure which includes a setup/ production cost, a linear holding cost, a linear backorder cost, a linear extra production lost sale cost, and a linear extra production profit, an expression for the expected cost per unit time for a given (r, Q) policy is obtained, and using a convex property of the cost function, a procedure to find the optimal (r, Q) policy is presented.

  • PDF

Cost and reliability of retrofit alternatives for schools located on seismic zones

  • De Leon-Escobedo, David;Garcia-Manjarrez, Jose Luis
    • Earthquakes and Structures
    • /
    • v.21 no.5
    • /
    • pp.505-514
    • /
    • 2021
  • A formulation based on structural reliability and cost effectiveness is proposed to provide recommendations to select the best retrofit strategy for schools with reinforced concrete frames and masonry walls, among three proposed alternatives. The cost calculation includes the retrofit cost and the expected costs of failure consequences. Also, the uncertainty of the seismic hazard is considered for each school site. The formulation identifies the potential failure modes, among shear and bending forces for beams, and flexure-compression forces for columns, for each school, and the seismic damages suffered by the schools after the earthquake of September 17, 2017 are taken into account to calibrate the damaged conditions per school. The school safety level is measured through its global failure probability, instead of only the local failure probability. The proposed retrofit alternatives are appraised in terms of the cost/benefit balance under future earthquakes, for the respective site seismic hazard, as opposed to the current practice of just restoring the structure original resistance. The best retrofit is the one that corresponds to the minimum value of the expected life cycle cost. The study, with further developments, may be used to develop general recommendations to retrofit schools located at seismic zones.

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

Cost Structure of Korean Manufacturing Industries connected with the Central Government's Environmental Investment (중앙정부의 환경투자 관련 제조업의 비용분석)

  • Min, Seung-Ki
    • Journal of Environmental Policy
    • /
    • v.9 no.4
    • /
    • pp.3-27
    • /
    • 2010
  • In this paper, we have analyzed the cost structure of the Korean manufacturing industry in relation to the central government's environmental investment(CGEI below) by applying translog variable cost function. Important findings are as follows. First, sufficiency degree of CGEI of 0.7230, less than optimal level of 1, causes production inefficiency. Therefore, central government should forward a strategy to raise CGEI to meet appropriate standards. In addition, inspite of the deficiency of CGEI, shadow priceis lower than market price due to q-value of 0.9572, yielding unfavorable conditions for CGEI. However, CGEI brings about increase in output, variable cost saving, and economies of scale of firms. Second, by comparing this study with an existing study(2010), we have discovered the following facts. In both studies, we find that there are deficiency of investment, unfavorable conditions in investment, economies of scale, and output increase due to investment. However, the current study has found that, CGEI, which shows efficiency by positive(+) shadow price, saves variable cost. Therefore, firms suffer from production inefficiency due to variable cost caused by a shortage of efficient CGEI. Moreover, the previous study conducted in 2010 found that investment in prevention of environmental pollution(IPEP below), which indicates inefficiency by negative(-) shadow price, cannot reduce variable cost. In such circumstances, firms yield abnormal production efficiency based on variable cost savings caused by inefficient IPEP. For this reason, firms should raise IPEP to optimal level to reduce IPEP inefficiency to achieve production efficiency by reducing variable cost.

  • PDF

Image Reversal Photoresist for the Single Isolation Structure of OLEDs (오엘이디의 단열 소자분리 구조를 위한 이미지 라버셜 감광제)

  • Lee, Seung-Jun;Sin, Yun-Su;Chae, Gyeol-Yeo;Im, Dae-U;Choe, Gyeong-Hui
    • Proceedings of the Optical Society of Korea Conference
    • /
    • 2009.02a
    • /
    • pp.541-542
    • /
    • 2009
  • We have developed an image reversal photoresist with high thermal stability and electric insulating properties for the single isolation structure of OLEDs. The thermal stability and electric insulating properties are investigated and compared with those of conventional insulator and cathode separator materials. The single isolation structure using the image reversal photoresist reduces the fabrication process steps and cuts down the manufacturing cost.

  • PDF