• Title/Summary/Keyword: Cost reduction

Search Result 3,667, Processing Time 0.033 seconds

Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy (휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정)

  • Choi, Nam-Jin;Kim, Byung-Seop;Shin, Joong-Rin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

Development of Cost-Effective and High-Property Mask in Flatron

  • Song, Jong-Mok;Kim, Byoung-Nam;Koh, Nam-Je;Chun, Hyun-Tae;Park, Ki-Bum
    • Journal of Information Display
    • /
    • v.2 no.1
    • /
    • pp.34-37
    • /
    • 2001
  • We developed the tension mask of which thickness increased from 25 urn to 50 urn to reduce the mask cost and improve the vibration property. First of all, the limitation by which rail structure can support is calculated and the optimal thickness of mask is determined. To prevent the reduction of brightness and brightness uniformity, the dimensions of mask was reassigned. As a result, the increase of mask thickness brought about a reduction in cost and improvement of howling property which had been a weak point of flat CRTs.

  • PDF

A Study on the Optimum Design for Energy Saving of an Auto Transmission Part (자동변속기용 부품의 에너지 절감을 위한 최적 설계 연구)

  • Lee, H.S.;Kim, T.H.;Kim, S.H.;Hong, E.C.;Lee, J.H.
    • Transactions of Materials Processing
    • /
    • v.24 no.3
    • /
    • pp.181-186
    • /
    • 2015
  • Many in the industrial world that consume high amounts of energy are trying to reduce energy when manufacturing their products. Energy saving during manufacturing is a cost reduction. Reduced cost is necessary for profit improvement. The Piston Under Drive Brake used in the current study is an automotive transmission part. The original machining after hot forging was changed to machining after cold forging of a plate in order to save energy and cost. Two extrusion shapes along the outer diameter caused decreased tool life because of the interrupted cut during turning. Therefore, a thickness reduction of two extrusion areas in the outer diameter was needed. The current study suggests an effective way to reduce the thickness of interrupted cut by using progressive blanking.

A Basic Study of Automatic Rebar Length Estimate Algorithm of Slab by Using BIM-Based Shape Codes Built in Revit (BIM 기반 형상코드를 이용한 슬래브 철근길이 자동 산정 기초 연구)

  • JI, Woo-Min;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.89-90
    • /
    • 2023
  • This dissertation investigates the feasibility of accurately calculating the required rebar length using BIM-based shape codes and the potential benefits of such an approach in terms of cost reduction, waste reduction, and environmental improvement. The study aims to explore the possibility of automatically calculating slab rebar length before construction to reduce rebar cutting waste and cost. The results of this study will provide insights into the potential of using shape codes to reduce rebar cutting waste and cost in building frame construction.

  • PDF

An Experimental Study on the Ground Source Heat Pump System for Heating Economic Efficiency and Reduction Amount of $CO_2$ (지열 시스템의 난방 경제성 및 $CO_2$ 절감 실증 연구)

  • Nam, Leem-Woo;Paek, Gi-Dong
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.3 no.2
    • /
    • pp.25-30
    • /
    • 2007
  • The final energy consumption in the building sector in Korea represents almost 20% of the total energy consumption. Besides, Space heating and hot water generation in Korea are based on fossil fuels, with a serious environmental impact. This study describes thermal performance of heating demonstration system using close-loop ground source heat pump installed at Korean minjok leadership academy. The results of the experimental study, it retrieve the investment cost for 3years 8months and reduction amount of $CO_2$are 293,900 $kgCO_2$.

  • PDF

Development of Guidelines for Installing Speed Control Humps (차량과속방지턱의 설치기준 개발에 관한 연구)

  • 문무창;장명순
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.1
    • /
    • pp.137-149
    • /
    • 1994
  • The objective of study is to evaluate the effect of speed control hump on traffic operation and accidents. Three sites were investigated for the change of traffic accidents before and after the hump installation. Vehicle speeds approaching the hump were also analyzed. The study revealed that not only the number of traffic accidents but also the accident severity were significantly reduced by the installation of hump. Further, different types of traffic accidents with lower severity were observed after the hump installation. For the effect of speed reduction by hump, it was found that the speeds observed at 15m upstream of hump were in the range of 36~50 percent of approaching speeds which were not affected by (ie, without) the hump. Economic analysis of hump installation showed the benefit-cost ratio of 4.3 and 11.2 at two sites. Further analysis revealed that the benefit by the accident reduction exceeds the cost by speed reduction and installation capital if AADT is below 43,150 vehicles on two lane highways. It is recommended from the study that humps should be considered on two lane highways of high accident locations for excessive speeds to reduce traffic accidents and severity.

  • PDF

The Technology of Peak Demand Reduction using Automatic Water Tank Pumping System on the Apartment And Analysis of Effect of Energy Cost (아파트 고가수조 자동급수장치를 이용한 전력피크 감소 및 전력시장에서의 효과 분석)

  • Lee, Jae-Gul;Lee, Yun-Kyoung;Cho, Won-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.161-163
    • /
    • 2006
  • This paper introduce the technology of peak demand reduction using automatic water tank pumping system on the apartment. That systems on the apartments installed water tank can control pumping(electricity) demand. Generally, system peak demand is occurred at the same time on workday and many water pumps consume electric power randomly. At this point, shift of operating time of water pump can reduce peak demand using automatic water tank pumping system. We were operating this system on some apartments for test of effect of peak demand reduction. and we represent result of demand shift. This result suggests that spread of the automatic water pumping system can contribute to reduce system peak demand and reduce system operation cost.

  • PDF

Enhancing Value of Public Construction Projects by Improving Contract Review Process

  • Song, Sang-Hoon;Bang, Jong-Dae;Cho, Gun-Hee;Sohn, Jeong-Rak;Jung, Sang-Ho
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.479-489
    • /
    • 2011
  • This study aims to suggest the method to enhance the value of public construction project during contract review process considering budget reduction for project profit and public interest enhancement simultaneously. The main results of this study are as follows: (1) Current method are considered to be improved from the point that cost reduction through current method could influence performance of the object of contract without conforming to user requirements or facilities' function. (2) In order to supplement current process, the method to evaluate the variation of performance and value was established based on facility type, participants on each phase, and their requirement. (3) Case study was conducted to verify suggested method, and showed the successful application in enhancing the value of construction projects on public sector.

Optimal Periodic PM Schedules Under $ARI_1$ Model with Different Pattern of Wear-Out Speed

  • Lim Jae-Hak
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.121-129
    • /
    • 2005
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate of amount proportional to the failure intensity, which increases since the last PM and slows down the wear-out speed to that of new one. And the proportion of reduction in hazard rate decreases with the number of PMs. Our model is similar to $ARI_1$ proposed by Doyen and Gaudoin(2004) in the sense of reduction of hazard rate. Our model has totally different wear-out pattern of hazard rate after PM's, however, and the proportion of reduction depends on the number of PM's. Assuming that the system undergoes only minimal repairs at failures between PM's, the expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

  • PDF

An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective (장기적 관점에서의 모듈러 주택 공사비 절감기회 분석)

  • Kim, Hu Yong;Ryu, Kuk Mu;Kim, Kyoon Tai;Jun, Young Hun;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.124-134
    • /
    • 2018
  • Despite the many advantages of modular housing, low preference for modular housing for consumers who are familiar with RC structure leads to high construction cost of modular housing. The cost of modular buildings is about 130% of that of RC structures, so it is urgent to secure economical efficiency of modular buildings. Therefore, in this study, after calculating the savings amount of modular housing by type of construction work, economic analysis was conducted from a long - term perspective. In order to carry out the research, the authors compiled and analyzed the material cost, labor cost, and expenses incurred by each type of work by reclassifying the statement of the modular housing into the factory production and the site installation. After that, Pareto diagrams were created to find a core work that is included in the cost ratio of about 80%, and selected it as a cost reduction subject. Based on the assumption that the market size of domestic modular housing is similar to the level of modular advanced countries such as Japan and European countries, six cost reduction methods were set up that reflects the characteristics of the modular construction method and used for the expert interviews. Cost saving potentials in percentage from the interview were converted to the amount of savings that can be achieved by each type of method when applying the method. Finally, the findings of the study are expected to suggest long-term directions for technical development for modular construction and cost savings.