• Title/Summary/Keyword: Cost model

Search Result 7,808, Processing Time 0.036 seconds

The Optimal Release Time in Cost Model Using PCLS Model

  • Song, Kwang Yoon;Chang, In Hong;Choi, Min Su;Lee, Da Hye
    • Journal of Integrative Natural Science
    • /
    • v.9 no.3
    • /
    • pp.206-214
    • /
    • 2016
  • The basic goal of software development is to produce high quality software at low cost. Therefore, when to stop software testing and release the software product is a significant point in the software development. The software cost model is an effective tool used to help software developers control costs and determine the release time. In this paper, we discuss the cost model to apply all 6 models with consideration of time to remove errors, cost of removing each error and risk cost due to software failure. We show the impact of cost coefficients and parameter values on the expected total cost by changing the values and comparing the optimal release times.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

Design of a Life Test Sampling Plan Based on the Cost Model

  • Kwon, Young-Il
    • International Journal of Reliability and Applications
    • /
    • v.6 no.1
    • /
    • pp.31-39
    • /
    • 2005
  • An economic life test sampling plan for products with exponential lifetime distribution is developed. To reduce test time, a test plan with curtailed Type II censoring is considered. A cost model is constructed which involves three cost components; test cost, accept cost, and reject cost. Determination of optimal plan minimizing the expected average cost per lot is discussed with a constraint related to consumer's risk. Some numerical examples are provided.

  • PDF

A Study on the Relationship between Firm Characteristics and Information System Outsourcing Cost Estimation Model Preference (기업의 특성과 정보시스템 비용산정모델 선호도의 관계연구)

  • 박진수;김현수
    • Journal of Information Technology Applications and Management
    • /
    • v.10 no.3
    • /
    • pp.75-92
    • /
    • 2003
  • In order to investigate IS(Information Systems) outsourcing cost estimation model preference of firms, this study reviews previous literatures on outsourcing and firm characteristics. The relationships between firm characteristics and IS outsourcing cost estimation model preference are analysed. Four major factors of firms characteristics are found and classified. IS outsourcing cost estimation model with SLA are found to have a strong relationship with organizational culture. Future research will be needed to verify the result of this exploratory study.

  • PDF

Determination of Resetting Time to the Process Mean Shift with Failure (고장을 고려한 공정평균 이동에 대한 조정시기 결정)

  • Lee, Do-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.145-152
    • /
    • 2019
  • All machines deteriorate in performance over time. The phenomenon that causes such performance degradation is called deterioration. Due to the deterioration, the process mean of the machine shifts, process variance increases due to the expansion of separate interval, and the failure rate of the machine increases. The maintenance model is a matter of determining the timing of preventive maintenance that minimizes the total cost per wear between the relation to the increasing production cost and the decreasing maintenance cost. The essential requirement of this model is that the preventive maintenance cost is less than the failure maintenance cost. In the process mean shift model, determining the resetting timing due to increasing production costs is the same as the maintenance model. In determining the timing of machine adjustments, there are two differences between the models. First, the process mean shift model excludes failure from the model. This model is limited to the period during the operation of the machine. Second, in the maintenance model, the production cost is set as a general function of the operating time. But in the process mean shift model, the production cost is set as a probability functions associated with the product. In the production system, the maintenance cost of the equipment and the production cost due to the non-confirming items and the quality loss cost are always occurring simultaneously. So it is reasonable that the failure and process mean shift should be dealt with at the same time in determining the maintenance time. This study proposes a model that integrates both of them. In order to reflect the actual production system more accurately, this integrated model includes the items of process variance function and the loss function according to wear level.

An improvement of software sizing and cost estimation model with function point methods (기능 점수를 이용한 소프트웨어 규모 및 비용산정 방안에 관한 연구)

  • 김현수
    • Korean Management Science Review
    • /
    • v.14 no.1
    • /
    • pp.131-149
    • /
    • 1997
  • Software cost estimation is an important both for buyers and sellers(developers). We reviewed domestic and foreign researches and practices on software cost estimation with function point method comprehensively, In this paper, we derived four promising alternative function point models. They are an IFPUG(International Function Point User Group)-based model(Model I), a shorthand model for client/sever software systems(Model II), a data-oricnted model for relatively large software projects(Model III), and a general- purpose function point model for non business application softwares as well as business applications(Model IV). Empirical data shows that Model I, II, and IV are very useful function point models. In particular, model II and IV look very useful models since they are concise and accurate. These models can be incorporated in a new improved guideline for software cost estimation. General opinion survey shows that Model I, II and IV are preferable. There are no significant differences in preference between buyers and sellers. The survey also shows that users think function point method is better than step(line of code)-oriented cost estimation methods in many ways including objectivity and estimation accuracy.

  • PDF

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

A Study on the Optimal LCC using AMSAA Model (AMSAA Model을 이용한 최적 LCC에 관한 연구)

  • Kim, Jun-Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.3
    • /
    • pp.135-142
    • /
    • 2006
  • Engineers are always concerned with life cycle costs for making important economic decisions through engineering action like reliability of products. Decisions during the reliability growth development of products involve trade-offs between invested costs and its returns. In order to find minimal LCC containing the reliability improvement cost, production cost, repair and replacement costs, and holding cost of spare parts for failure items we suggest in this paper relationship between development cost and sustaining cost in values of growth parameter $\beta$ of AMSAA model. This model is applied to the reliability growth program based on AMSAA model during R&D phase, the warranty activities of items and the block replacement policy for maintenance of items in avionic equipment.

A Study on the Determination of Economic Life of Weapon System by using the PRICE Model (PRICE 모텔을 이용한 무기체계 경제수명 결정에 관한 연구)

  • Kim Seung-Soo;Kang Sung-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.13-31
    • /
    • 2004
  • This paper aims at efficient determining the economic life of weapon systems. Specifically, the procedure to estimate the life cycle cost at initial acquisition state or at development state using the PRICE model is proposed. The PRICE model is a parametric cost estimation which is widely used in the field of national defense. The model includes the estimation of the cost in life cycle of weapon systems such as research and development, acquisition, operation and support. Using this model, economic life of weapon systems can be determined. Based on an equivalent annual cost (EAC) method which sums the capital recovery with return (CR) and the equivalence cost (EC), the economic life will be calculated. A case study is accomplished to illustrate the proposed procedure.

The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure (비용구조분석에 의한 건축단계별 공사비용 절감방법)

  • Park, Keun-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.