• Title/Summary/Keyword: Cost control

Search Result 5,856, Processing Time 0.04 seconds

Optimal supervisory control (최적 제어를 위한 Supervisory control)

  • 박홍성;김면집;노갑선;권욱현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10a
    • /
    • pp.498-503
    • /
    • 1991
  • This paper presents a framework of a optimal supervisory controller, which consists of decision rules and the supervisory controller proposed by Ramadge and Wonham. From the presented framwork we obtain optimal control patterns minimizing the given cost functions. The properties of the presented optimal supervisory controller are discussed. Two examples are given to illustrate a designing method of the optimal supervisory controller.

  • PDF

Analytical Approach of Multicasting-supported Inter-Domain Mobility Management in Sensor-based Fast Proxy Mobile IPv6 Networks

  • Jang, Ha-Na;Jeong, Jong-Pil
    • International journal of advanced smart convergence
    • /
    • v.1 no.2
    • /
    • pp.1-11
    • /
    • 2012
  • IP-based Wireless Sensor Networks (IP-WSNs) are gaining importance for their broad range of applications in health care, home automation, environmental monitoring, industrial control, vehicle telematics, and agricultural monitoring. In all these applications, a fundamental issue is the mobility in the sensor network, particularly with regards to energy efficiency. Because of the energy inefficiency of network-based mobility management protocols, they can be supported via IP-WSNs. In this paper, we propose a network-based mobility-supported IP-WSN protocol called mSFP, or the mSFP: "Multicasting-supported Inter-Domain Mobility Management Scheme in Sensor-based Fast Proxy Mobile IPv6 Networks". Based on [8,20], we present its network architecture and evaluate its performance by considering the signaling and mobility cost. Our analysis shows that the proposed scheme reduces the signaling cost, total cost, and mobility cost. With respect to the number of IP-WSN nodes, the proposed scheme reduces the signaling cost by 7% and the total cost by 3%. With respect to the number of hops, the proposed scheme reduces the signaling cost by 6.9%, the total cost by 2.5%, and the mobility cost by 1.5%. With respect to the number of IP-WSN nodes, the proposed scheme reduces the mobility cost by 1.6%.

A Study on Establishing Operation Mathematical Model for Optimum Capacity Estimation of the ESS Applications for each in the Nationwide Perspective (국가적 관점에서 용도별 ESS 적정용량 산정을 위한 운전수리모델 수립에 대한 연구)

  • Kim, Jung-Hoon;Youn, Seok-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.969-978
    • /
    • 2016
  • Around the world are increasing the demand for ESS. Currently, the domestic is expected to benefit by operating ESS. In the domestic, it is expected to benefit from operations of the installed ESS because of the introduction of ESS less capacity. However ESS capacity to the maximum profit occurs is unknown. ESS is different from the charge-discharge characteristics and the reserve to replace, depending on the application. Therefore, it should be established in accordance with the ESS optimal capacity according to the purpose used because it can maximize the quality and efficiency of the electric energy. To the ESS optimal capacity estimation by the purpose used, It should compare the investment cost caused by ESS facility installation and operation cost caused by operating ESS. In this paper, the operation mathematical model for estimating marginal operation costs established. In operation mathematical model, operating cost is considered fuel cost and no-load cost start-up cost. Because no-load cost and start-up cost are not related to cost and power plant output, there are expressed an integer variable costs as a step function.

Survey of Corrosion Cost in China and Preventive Strategies

  • Ke, Wei;Li, Zhiqiang
    • Corrosion Science and Technology
    • /
    • v.7 no.5
    • /
    • pp.259-264
    • /
    • 2008
  • A national consultative project entitled "corrosion cost survey in China and preventive strategies" was funded by the Chinese Academy of Engineering in 1998. Soon afterwards, an expert group was organized jointly by the Institute of Metal Research, CAS and Chinese Society of Corrosion and Protection. The report on corrosion cost survey in China was published in 2003. According to this report the overall annual corrosion cost in China estimated by the Uhlig Method and Hoar Method at 1997-2001 was found to be 200.7 billion Yuan RMB and 228.8 billion Yuan RMB respectively, which is equivalent to 2% of the gross national product of China. However the total cost of corrosion including the direct and indirect cost was estimated to be more than 500 billion Yuan RMB per year in China. Among them, corrosion cost of infrastructure ranked in first comparing with other sectors. Although corrosion costs in some sectors, such as electric power, petrochemical, oil pipeline and railway in China has reduced in the past years, significant losses are still being encountered in most sectors of industries and cost-effective methods have not always been implemented. Both successful and unsuccessful cases in corrosion control and corrosion management were collected. As the investment in capital construction continues increasing rapidly in China, the maintenance and life extension of the infrastructures will become a big issue. The preventive strategies have been suggested

A Study on the Affecting Factors and Effects of Switching Costs in On-line shopping mall (온라인 쇼핑몰 전환비용의 영향 요인과 효과에 관한 연구)

  • Han, Pil Koo;Kang, Seong Chul;Jun, Byoung Ho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.3
    • /
    • pp.137-150
    • /
    • 2011
  • Long-term customer retention strategies with switching cost is very important for gaining a competitive advantage in on-line shopping mall environment. The purpose of this study is to investigate the affecting factors of switching cost in terms of on-line shopping mall's quality and the effects of it on customers' behavior moderating commitment. According to the result, information quality and customized information were found to be significantly related to social switching cost, and also royalty program and product differentiation were found to be significantly related to lost benefit cost and procedural cost respectively. When it comes to the relationship between switching cost and commitment, results shows that social switching cost is not significantly related to affective commitment. Lost benefit cost and procedural cost, however, were found to be significantly related to affective commitment and calculative commitment respectively. Finally, affective commitment was found to bolster repurchase intention and control negative WOM, and calculative commitment was found to bolster both repurchase intention and negative WOM.

ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

A Study on the Method of New Activity Based Cost Management Coping with Changes in the Cost Structure of Real Estate Construction Industry (부동산 건설업의 원가구조 변화에 대응한 공종별 신활동기준 원가관리 기법에 관한 연구)

  • Lee Jeong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.69-79
    • /
    • 2003
  • About 93$\%$ of domestic teal estate construction firms registered as the end of 2001 recorded net profits of only less than 500 million won(including firms in the red) for the term. As a result of having analyzed the ratios of sales costs and the structural ratios of sales costs for the past 10 years, it was found that there have been great changes in structural ratios of sales costs. Material costs and labor costs have gradually decreased, but outsourcing costs of processing have greatly increased. In order to find activity points which are fundamental to cost control, the methods of new activity based cost management have been pursued. The characteristics of real estate construction industry lie in the fact that contract prices (sales in) are fixed and amounts of profits differ depending on the use of costs. In order to create maximum profits from fixed contract prices, the new activity based cost management has been proposed. The control of operation budgets and management costs is designed to control their schedules and expenses in different respects. Operation budgets ate executed with specific activities and management costs are controlled as a form of material costs, labor costs, out sourcing costs and expenses which are details of expenditure. In order to execute them by using the methods of new activity based cost management, first of all, we have to analyze what activity drivers ale and how much added values such activities can create. It is considered as a method of cost management which is necessary far the survival management of real estate construction industry.

The National Cancer Screening Program for Breast Cancer in the Republic of Korea: Is it Cost-Effective?

  • Kang, Moon Hae;Park, Eun-Cheol;Choi, Kui Son;Suh, MiNa;Jun, Jae Kwan;Cho, Eun
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.14 no.3
    • /
    • pp.2059-2065
    • /
    • 2013
  • This goal of this research was to evaluate the cost-effectiveness of the National Cancer Screening Program (NCSP) for breast cancer in the Republic of Korea from a government expenditure perspective. In 2002-2003 (baseline), a total of 8,724,860 women aged 40 years or over were invited to attend breast cancer screening by the NCSP. Those who attended were identified using the NCSP database, and women were divided into two groups, women who attended screening at baseline (screened group) and those who did not (non-screened group). Breast cancer diagnosis in both groups at baseline, and during 5-year follow-up was identified using the Korean Central Cancer Registry. The effectiveness of the NCSP for breast cancer was estimated by comparing 5-year survival and life years saved (LYS) between the screened and the unscreened groups, measured using mortality data from the Korean National Health Insurance Corporation and the National Health Statistical Office. Direct screening costs, indirect screening costs, and productivity costs were considered in different combinations in the model. When all three of these costs were considered together, the incremental cost to save one life year of a breast cancer patient was 42,305,000 Korean Won (KW) (1 USD=1,088 KW) for the screened group compared to the non-screened group. In sensitivity analyses, reducing the false-positive rate of the screening program by half was the most cost-effective (incremental cost-effectiveness ratio, ICER=30,110,852 KW/LYS) strategy. When the upper age limit for screening was set at 70 years, it became more cost-effective (ICER=39,641,823 KW/LYS) than when no upper age limit was set. The NCSP for breast cancer in Korea seems to be accepted as cost-effective as ICER estimates were around the Gross Domestic Product. However, cost-effectiveness could be further improved by increasing the sensitivity of breast cancer screening and by setting appropriate age limits.

The Correlations among the Categorized Quality Cost Factors on SMEs (Small & Medium-sized Enterprises) (중소 제조기업의 품질비용 행태에 관한 실증 연구)

  • Lee, Sang-Choon;Koo, Il-Seob
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.04a
    • /
    • pp.731-746
    • /
    • 2011
  • The successful and sustainable growth of SMEs depends on their ability of strengthen their competitiveness in quality and cost and service more than anything else as a fundamental of operation. Among these key competitive factors of SMEs, quality is the most critical factor in manufacturing business fields. Because quality strongly influence cost and service performance on this manufacturing business field. There are many different ways to improve the quality performance but it needs proper management decision to choose the best way what can maximize outputs with minimum inputs. And it needs effective measurement methods and some indicators to analysis the quality performance properly. The quality cost is one of the simplest key indicators to measure the quality performance and the effectiveness of quality related management decisions. The major purpose of this study is to diagnose the categorized current level of actual quality cost of local SMEs to maximize their quality management effectiveness through comparing their level with others what's expressed in early studies. In this study, through survey on local SMEs, we found that their average annual quality cost ratio versus turnover - Total amount of annual quality cost divided by annual turnover - is around 3.69% excluded some SME's performances what have different quality control measures with others. And we found some results what corresponded with the early studies on the correlations between those categorized quality costs factors and some discrepancies between some of the literature model and the early case study results as follows. There were negative correlations between the Prevention costs and the External failure costs, and the Appraisal costs and the External failure costs, and there was positive correlation between the Appraisal costs and Internal failure costs same as early studies. But, we couldn't found any strong negative correlations between the Cost of control - Preventive costs & Appraisal costs - and the Cost of Failure of control - Internal & External failure costs -. It reveals not only the lack of effectiveness on their preventive or appraisal activities but also it can reveal there were so many effective ways to prevent the failure costs properly such as some innovative investment on Factory automation includes Error Proofing and more preventive actions to improve the effectiveness of the typical management methods likes CE (Concurrent Engineering), APQP (Advanced Product Quality Planning), FMEA (Failure Mode & Effect Analysis) etc.

  • PDF

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.