Development of Non-Contact Construction Management Supporting System For Cost Reduction and Duration Reduction By Real-Time Data Sharing (건설공사에서 실시간 현장 정보 공유에 의한 원가절감, 공기단축을 위한 비대면 건설사업관리 솔루션 개발)

  • Kang, Sang-Chan;Kim, Min-Jin;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.323-324
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

Materials management using RFID in the apartment construction (RFID를 활용한 공동주택 건설공사 자재관리 방안 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.251-255
    • /
    • 2008
  • Nowadays the scale of domestic construction becomes large, sophisticated and specialized. It has led to a growing need for the high quality, cost reduction, safety and reduction of work duration. Therefore the importance of construction materials management is emphasized to perform the project successfully. It becomes an current issue about method of construction material management according to the flow of construction progress in the construction field. Therefore, various researches using RFID for efficiency of construction material are being studied. We analyzed the case study using RFID, drew the problems through the investigation of status about the management of material in the field, and then suggested the method of material management using in the apartment building construction field.

  • PDF

The Problem of the Quality of the Predecessor Activity on the Time and Cost of the Successor Activity in the Project Schedule - Project Schedule with Resource Constraints - (프로젝트 일정에서 선행활동 품질이 후행활동의 시간과 비용에 미치는 문제 - 자원제약이 존재하는 프로젝트 일정문제 -)

  • Kim, Gab Sik;Bae, Byeong Man;Ahn, Tae Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.2
    • /
    • pp.265-286
    • /
    • 2022
  • Purpose: The time and cost of a project activity exists in a selected mode and there is a quality level for the selected mode, and the time and cost of the current activity is determined by the quality level of the preceding activity. When an activity is a predecessor activity of an activity, it is characterized as a trade-off problem in which the time and cost of the activity are determined according to the quality level of the activity. Methods: A neighbor search heuristic algorithm obtains a solution by (1) randomly determining the mode, quality level, and assignment order for each activity. (2) get a solution by improving the solution by changing the possible modes and quality levels; (3) to find a solution by improving the solution from the point where it is feasible to advance the start time. Here, Case[1] is a method to find the optimal solution value after repeating (1). Case [2] is a method for finding a solution including (1) and (2). Case [3] refers to a method for finding solutions including (1), (2), and (3). Results: It can be seen that the value of the objective function presented by the algorithm changes depending on how the model of the heuristic algorithm is designed and applied. In other words, it suggests the importance of algorithm design and proves the importance of the quality problem of activities in the project schedule. Conclusion: A study significance of the optimization algorithm and the heuristic algorithm was applied to the effect of the quality of the preceding activity on the duration and cost of itself and the succeeding activity, which was not addressed in the project schedule problem.

Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges (소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안)

  • Jang, Myung-Houn;Yi, Yong-Kyu
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.3
    • /
    • pp.413-422
    • /
    • 2016
  • A construction manager tries to complete a construction project within its duration and budget using available resources. Schedule networks such as Bar-chart and CPM(critical path method) are used to finish the project within the duration. A survey shows that small contractors prefer Microsoft Excel to commercial time management softwares to manage construction time in their fields, because the Excel is useful to control cost with schedule and few time management experts works in the small contractors. A college produces talented graduates who are able to manage time of a construction project. But the quality and quantity of college eduction for time management is insufficient. Another survey shows that majors in Architectural engineering of local national universities have the curriculum for time management, and teach mainly the theory of network scheduling and how to make the network schedule. The several majors have classes for the theory and exercise of commercial time management softwares in several majors. It is necessary to educate time management experts able to use Bar-chart and commercial time management softwares for the small contractors.

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

Automatic Panelizing Algorithms of Free-form Buildings

  • Lee, Donghoon;Lim, Jeeyoung;Habimana, Gilbert;Lee, Taick-Oun;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.425-428
    • /
    • 2015
  • New technologies using a CNC machine are being developed to reduce the production cost of free-form buildings. For production of free-form members using such technologies, vast free-form buildings should be first split into multiple panels that are productible. Taking into consideration of the curved surface of free-form members, the segmented free-form panels may vary in shape and size, which may cause a lot of errors. In addition, it is time-consuming for the work. However, the current panelizing work is completed with the trials and errors of engineers and architectural designers even in large-scale projects, which results in increased construction duration and cost. Thus, it is necessary to develop a technology for panelizing free-form panels so as to maximize the economic feasibility of production technologies for free-form concrete members. The study intends to develeop automatic panelizing algorithms of free-form buildings considering the curved surface and size of free-form panels and the production conditions. The developed algorithms will be useful in applying the production technologies of free-form buildings using CNC machine and reducing the cost.

  • PDF

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

A study of Simulations on the Changes of Physician's Practice Patterns in University Hospitals after the Introduction of DRG in Obstetrics and Gynecology (산부인과 포괄수가제 도입에 따른 일개 대학병원의 진료행태 변화 모의실험 연구)

  • Shin, Sam-Chul;Kim, Jong-Soo
    • Journal of Digital Convergence
    • /
    • v.11 no.6
    • /
    • pp.289-298
    • /
    • 2013
  • The objective of this study was to predict the changes in the duration of hospital stay, hospital admission fee, costs of drugs, changes in laboratory cost, material cost, total medical cost, adjusted amount of treatment and the efficacy of obstetrics and gynecology DRG system. The cost of drugs showed the greatest change and was followed by materials for medical examinations and the change in methods of medical examinations. In the analysis of the quantity of medical service the profit of medical examinations were influenced mostly by the duration of hospital stay. The results and data in this study could be used as a basis of future DRG system protocols and will be utilized so that hospitals can build a efficient medical system.

The Flow rate estimation of CSOs using EC Data (전기전도도를 이용한 CSO의 유량 추정)

  • Choi, Weon-Suk;Song, Chang-Soo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.5
    • /
    • pp.751-757
    • /
    • 2011
  • The monitoring technique based on electrical conductivity (EC) can provide researchers with some advantages in maintenance management and is cost-effective as compared with existing CSOs monitoring. In this study, the flow rate estimation using EC data was executed in two sites where storm overflow chamber had installed. In the result of A-site, R2 of second order multinomial between dilution ratio of EC and observed flow rate was showed the range of 0.68 ~ 0.77. And $R^{2}$ of B-site was 0.62 ~ 0.81. On the other hand, cumulative frequency of A-site was 43.4 ~ 52.2% in the relative error level of under 20%. And B-site was 10.1 ~ 46.5%. The flow rate estimation formula was improved through consideration of some parameters including antecedent dry days and rainfall duration. And difference between estimated flow rate and observed flow rate in total rainfall event was very small.

Cost-Benefit Analysis of Back School Program for Occupational Low Back Pain Patients (직업성 요통환자에서 재활 프로그램(Back School Program) 도입의 비용-편익분석)

  • Ju, Yeong-Su;Ha, Mi-Na;Han, Sang-Hwan;Kwon, Ho-Jang;Cho, Soo-Hun;Kim, Chang-Yup;Kim, Sun-Min
    • Journal of Preventive Medicine and Public Health
    • /
    • v.29 no.2 s.53
    • /
    • pp.347-357
    • /
    • 1996
  • Although occupational low back pain accounts for $20\sim40%$ of all occupational illness and injury, there are limited numbers of studies regarding the effectiveness of back school program. The objective of this study was to evaluate the economic benefit of back school program for early return to work of occupational low back pain patients in the current occupational injury compensation and management system. The cost-benefit analysis in this study was conducted to evaluate the relative magnitude of benefit to cost. The total cost was estimated by calculating the value of components in back school program according to governmental budget protocol. The back school program was consisted of three major approaches, pain center, work-hardening program and funcional restoration program and each of components had various facilities and experts. The total amount of cost was estimated as 250,866,220 won per year. The most promising type of back school program were quite intensive (a 3 to 5-week stay in a specialized center), therefore, if we adopted the 5-week stay course, 10 courses could be held in a year. Following to the medical act, 20 patients per doctor could participate in a each course, ie, total 200 patients in a year. As a result, we could estimate the cost of 1,254,331 won a patient. We estimated the benefit by using data of a few local labor offices about average medical treatment beneficiary and off-duty beneficiary of 46 occupational low back pain patients in 1994. Ullman and Larsson (1977) mentioned that the group of chronic low back pain patients who participated in back school program needed less time to recover by 48.4% of beneficiary duration. And in the trying to estimate the benefit, we asked 10 rehabilitation board certificate doctors about reduction proportion of treatment cost by introducing back school program. The answered reduction proportions were in the range of $30\sim45%$, average 39%. As a final result, we could see that the introduction of back school program in treatment of chronic occupational low back pain patients could produce the benefit to cost ratio as 3.90 and 6.28. And we could conclude that the introduction of back school program was beneficial to current occupational injury compensation and management system.

  • PDF