• Title/Summary/Keyword: Cost Variance

Search Result 282, Processing Time 0.025 seconds

A Study on the design of hospital budget variance analysis model reflecting efficiency and an attainable target cost (효율성과 목표원가를 반영한 병원예산 원가차이 분석 모형 설계)

  • O, Dongil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.696-706
    • /
    • 2013
  • This study aims to develop DEA model which can look into budget cost variance analysis tool based on standard cost using 68 hospital's input and output data. For accomplishing this purpose, by introducing new DEA model which can get an attainable target cost, we can decompose an actual cost difference into several meaningful sub variances. Also based on the 2008 general hospital data, this model can make variance analysis between actual cost and target cost. Total variance can be divided into technical inefficiency variance, price inefficiency variance, allocation inefficiency variance. This study introduces that by using target budget cost concept, traditional actual cost variance can be divided into a technical variance, price variance, budget variance. Finally, we can get result which confirms there does not exist favorable size effects on efficiency and cost management in running a general hospital.

A Study on the Methods of the Overhead Standard Setting and the Overhead Variance Analysis in Standard Cost Accounting (표준원가계산에 있어서 제조간접비표준의 설정과 차이분석기법)

  • 김선정
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.8
    • /
    • pp.81-91
    • /
    • 1983
  • In this study the methods of the overhead standard setting and the overhead variance analysis, which raise problems especially in business practice in case that small businesses introduce the standard cost accounting system, were examined by hypothetical examples. As the result of this study small businesses are advised to take the following in setting the overhead cost. (1) To divide the mixed cost into variable overhead and fixed overhead, it is desirable to take Beast square method. (2) In setting the overhead standard, it is desirable to fake the flexible budget system and to make a budget by the inspection method, after dividing the overhead into variable overhead and fixed overhead. (3) After dividing the overhead variance into variable overhead variance and fixed overhead variance, it is desirable to analyze them as follows. (A) Variable overhead variance is analyzed into spending variance and efficiency variance. (B) Fixed overhead valiance is analyzed into budget variance and denominator variance.

  • PDF

Design of Generalized Minimum Variance Controllers for Nonlinear Systems

  • Grimble Michael J.
    • International Journal of Control, Automation, and Systems
    • /
    • v.4 no.3
    • /
    • pp.281-292
    • /
    • 2006
  • The design and implementation of Generalized Minimum Variance control laws for nonlinear multivariable systems that can include severe nonlinearities is considered. The quadratic cost index minimised involves dynamically weighted error and nonlinear control signal costing terms. The aim here is to show the controller obtained is simple to design and implement. The features of the control law are explored. The controller obtained includes an internal model of the process and in one form is a nonlinear version of the Smith Predictor.

DEELOPMENTS IN ROBUST STOCHASTIC CONTROL;RISK-SENSITIVE AND MINIMAL COST VARIANCE CONTROL

  • Won, Chang-Hee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10a
    • /
    • pp.107-110
    • /
    • 1996
  • Continuing advances in the formulation and solution of risk-sensitive control problems have reached a point at which this topic is becoming one of the more intriguing modern paradigms of feedback thought. Despite a prevailing atmosphere of close scrutiny of theoretical studies, the risk-sensitive body of knowledge is growing. Moreover, from the point of view of applications, the detailed properties of risk-sensitive design are only now beginning to be worked out. Accordingly, the time seems to be right for a survey of the historical underpinnings of the subject. This paper addresses the beginnings and the evolution, over the first quarter-century or so, and points out the close relationship of the topic with the notion of optimal cost cumulates, in particular the cost variance. It is to be expected that, in due course, some duality will appear between these notions and those in estimation and filtering. The purpose of this document is to help to lay a framework for that eventuality.

  • PDF

Optimal Transmission Expansion Planning Considering the Uncertainties of Power Market (전력시장 불확실성을 고려한 최적 송전시스템 확장계획)

  • Son, Min-Kyun;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.560-566
    • /
    • 2008
  • Today, as the power trades between generation companies and power customer are liberalized, the uncertainty level of operated power system is rapidly increased. Therefore, transmission operators as decision makers for transmission expansion are required to establish a deliberate investment plan for effective operations of transmission facilities considering forecasted conditions of power system. This paper proposes the methodology for the optimal solution of transmission expansion in deregulated power system. The paper obtains the expected value of transmission congestion cost for various scenarios by using occurrence probability. In addition, the paper assumes that increasing rates of loads are the probability distribution and indicates the location of expanded transmission line, the time for transmission expansion with the minimum cost for the future by performing the Montecarlo simulation. To minimize the investment risk as the variance of the congestion cost, Mean-Variance Markowitz portfolio theory is applied to the optimization model by the penalty factor of the variance. By the case study, the optimal solution for transmission expansion plan considering the feature of market participants is obtained.

Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.

A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test - (표준단면을 이용한 터널 공사비 예측모델 개발 (II) - 공사비 변동 모델 및 검증 -)

  • Cho, Jeongyeon;Kim, Sang-Kwi;Kim, Kyoungmin;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.677-684
    • /
    • 2008
  • The paper provides an approximate cost estimating model that can be used for tunnel. Based on the previous study analyzed critical factors that have impact on tunnel construction cost, this paper establishes a cost variance index table that reflects the cost impacts due to the change of the critical cost factors. An estimating procedure is described utilizing the index table. For the verification of the suggested model, the comparison of the estimated construction cost with real project cost is performed. The estimated results range from 95%~111% of the real project costs. As an approximate tunnel cost estimating model, the model can be utilized to quickly estimate tunnel construction costs based on the conceptual information at the planning stage and to efficiently make a decision on design alternatives.

Risk-averse Inventory Model under Fluctuating Purchase Prices (구매가격 변동시 위험을 고려한 재고모형)

  • Yoo, Seuck-Cheun;Park, Chan-Kyoo;Jung, Uk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.4
    • /
    • pp.33-53
    • /
    • 2010
  • When purchase prices of a raw material fluctuate over time, the total purchasing cost is mainly affected by reordering time. Existing researches focus on deciding the right time when the demand for each period is replenished at the lowest cost. However, the decision is based on expected future prices which usually turn out to include some error. This discrepancy between expected prices and actual prices deteriorates the performance of inventory models dealing with fluctuating purchase prices. In this paper, we propose a new inventory model which incorporates not only cost but also risk into making up a replenishment schedule to meet each period's demand. For each replenishment schedule, the risk is defined to be the variance of its total cost. By introducing the risk into the objective function, the variability of the total cost can be mitigated, and eventually more stable replenishment schedule will be obtained. According to experimental results from crude oil inventory management, the proposed model showed better performance over other models in respect of variability and cost.

Economic Design of Tool Resetting Period in NC Machining (NC 선반가공에서 공구 조정주기의 경제적 설계)

  • 배문택;윤원영;목학수
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.6
    • /
    • pp.33-39
    • /
    • 1998
  • This paper is related to economic design of tool-resetting period in NC machining. In NC lathe machining, the mean and variance of components dimension fluctuate in slow time and we should reset tool program to compensate the variation from the fluctuation. In this paper. we propose the procedure determining the optimal resetting period based on the total expected operating cost which consists of resetting cost and the quality cost related to dimension variation. As a case study, using experimental data about dimension changes of a lathe machining, we obtain the regression equations of mean and variance of the dimension fluctuation, total expected operating cost, and optimal resetting period.

  • PDF

Generalized minimum variance control of plant with autoregressive noise model (자기회귀 잡음모델을 가진 플랜트의 일반화 최소분산제어)

  • 박정일;최계근
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1986.10a
    • /
    • pp.370-372
    • /
    • 1986
  • In this paper we propose a Generalized Minimum Variance Self-tuning Control of the system with an autoregressive noise model. To establish a Generalized Minimum Variance Control, the control input is also included in a cost function and a novel identity is introduced. The effectiveness of this algorithm is demonstrated by the computer simulation.

  • PDF