• 제목/요약/키워드: Cost Structure

검색결과 3,827건 처리시간 0.715초

Analysis on the Construction Cost of Spatial Structures-Focused on the Roof Structure (대공간구조물의 건설 비용 분석-지붕구조체 중심으로)

  • Jang, Myung-Ho;Cheong, Myung-Chae;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • 제7권1호
    • /
    • pp.87-94
    • /
    • 2007
  • An economic analysis is one of the most important factor to determine tile project feasibility. In some mega project, however, it is not unique factor to make a Go or No-Go decision because of overriding this work, an economic aspect by some project indirect factor such as political, social, environmental and technical factor, etc. The purpose of the this study is to investigate the cost model effects of spatial structure.

  • PDF

A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

An Analysis on Cost Factor Reduction of Life Cycle for High Speed Train(KTX-1) Based on the Maintenance Information (유지보수정보를 활용한 고속철도차량(KTX-1) 수명주기비용 요소절감 분석)

  • Kim, Jae-Moon;Kim, Yang-Su;Chang, Chin-Young;Lee, Jong-Sung
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.2169-2170
    • /
    • 2011
  • This paper presents about the analysis on cost factor reduction using the life cycle cost model for motor block in the KTX-1. Until now, most life cycle cost of the system as a whole that has been studied. but in case of railway industry part, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. Therefore, In this paper presents cost breakdown structure for life cycle cost (LCC) estimation for localization development of propulsion control system (Motor Block) in high speed railway vehicle (KTX-1). Also to analysis LCC on motor block, it was analyzed physical breakdown structure (PBS) and preventive cost on propulsion control system in view of maintenance cost. Based on this, we describe life cycle cost on motor block of KTX-1.

  • PDF

A Decision Making Process for Improving Quality Cost : A Case Study of C&C Product Failure Cost (품질비용 개선을 위한 의사결정 프로세스 연구 : C&C 제품 실패비용 사례 분석)

  • Lee, Dong-Han;Chae, Hwa-Sung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제33권2호
    • /
    • pp.162-169
    • /
    • 2010
  • This paper analyzes the difference between theoretical cost of quality and real world cost. Examined are the theoretical cost structure of quality, it's measurement styles, a process based improvement strategy of quality cost, and possible adaptation of decision making concepts in enhancing the cost structure. This study will contribute to the literature in delineating an improvement process of quality cost by adjusting service policy.

Data Structure Modeling for the LCC Analysis of the Plate Girder Bridge Considering Corrosion (부식을 고려한 판형교의 LCC 분석 데이터구조 설계)

  • Kim, Dong-Hyun;Kim, Bong-Geun;Lee, Sang-Ho
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.497-500
    • /
    • 2007
  • Data structure was designed not only to estimate LCC but also to analyze time-variant reliability index of plate girder bridges. Information model for data structure was categorized into cost information, cost variable information, user cost information, and reliability analysis information according to the characteristic of data. EXPRESS language of STEP was adopted to describe the data structure for the electronic representation of LCC information. The suitability of the developed data structure was verified by estimating LCC and analyzing time-variant reliability index of a plate girder bridge considering corrosion on the basis of the constructed test database.

  • PDF

Study on Optimal LCC Considering Asset Management Through Maintenance-Period Analysis about Railway Truss Bridge (철도트러스 교량의 유지보수주기분석을 통한 자산관리 차원의 최적LCC에 관한 연구)

  • Kim, Tae-Hee;Park, Mi-Yun;Moon, Jae-Woo
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1350-1358
    • /
    • 2008
  • Recently the study related to life cycle cost analysis of railway structure consisted of a complex is proceeded covering several range, which is considering the methodology of efficiency and rationalization for maintenance and analysing long-time behavior of the structure of looking at standpoint from asset management and safety. But LCCA(life cycle cost analysis) of railway structure was almost impossible as there were not anything datum for maintenance plan, such as maintenance periods related to each of components(painting and corrosion of steel, and cracking of elements, etc)and maintenance proportion, despite of its 100-year history. According, for collecting data related to railway truss bridge, bridge record cards and testing safety papers, and researching question, etc are surveyed and classified for LCC Analysis. Especially, LCC assessment on the side of assets-maintenance considering about initial cost, maintenance cost, and indirect cost is constructed. Maintenance period and complementary measure rate are very important in maintenance. To decide maintenance period, Baysian updating method is applied.

  • PDF

A Study on Work Development Direction of Cost Analysis through Cost Analysis of Micro Satellite (초소형위성 비용분석 사례연구를 통한 비용분석 업무발전 방향에 대한 고찰)

  • Lee, Tae Hwa
    • Journal of Korean Society for Quality Management
    • /
    • 제51권3호
    • /
    • pp.461-479
    • /
    • 2023
  • Purpose: It emphasizes the importance of cost analysis for weapons systems that require enormous develop- ment costs, analyzes the problems of cost analysis steps from a practical point of view, and presents the direction of business development in terms of cost analysis reliability, timeliness, and efficiency. Methods: It analyzes the R&D cost of Micro satellites with a complex cost structure and large scale according to engineering estimation procedures, derives major analysis step-by-step problems, and presents business development directions. Results: Problems with standards and assumptions, data collection, cost division structure, and cost estimation methods were derived through the micro satellite cost analysis process, and business development directions such as expanding common standards, standardizing basic data, standardizing cost division structures and cost items, and data asset were presented. Conclusion: In order to develop work in terms of cost analysis reliability, timeliness, and efficiency, it is important to prepare and standardize standards and rules for detailed tasks at each analysis stage, and through this, it is expected that high utilization value and systematic cost data will be assetized in the future.

An Empirical Study of Cost Structure in Telecommunication Industry (국내 전기통신산업의 비용구조에 관한 실증연구)

  • 이덕주;오형석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • 제22권2호
    • /
    • pp.169-180
    • /
    • 1997
  • In this study, we estimate the multi-service cost function of Korea Telecom in order to characterize the cost structure of the telecommunication industry in Korea. By examining the cost function of Korea Telecom, we show that telecommunication costs of Korea Telecom are subadditive. Therefore, we conclude that a natural monopoly exists in the telecommunication industry in Korea.

  • PDF

Design and Structural Analysis on the Open and Close Hinge for Complex Machine (복합기 커버 개폐용 힌지의 설계와 구조 해석)

  • Yun, Yeo-Kwon;Yang, Kwang-Mo;Kim, Do-Seok
    • Journal of the Korea Safety Management & Science
    • /
    • 제14권2호
    • /
    • pp.49-54
    • /
    • 2012
  • As all kind of industry has developed, metal structure and machine instrument use bolt, pin, rivet and welding for assembly and combination. For pin and hinge, dimension accuracy is crucial to keep the operation and safety of the structure and machine instrument. In case of complex machine, the hinge for cover open-loop system is one of the significant design elements. Most of the hinges are being imported and assembled sine they give high technology development cost for its unit cost position. The reason is that the localization of hinge is inadequate. As the demand increase and the necessity of localization grow, it is now more important than ever to develop low cost structure. By the low cost structure, a new technology could be obtained for electronic product and structural hinge since it would enable for complex machine hinge to be guaranteed, technologically. Open-loop hinge is the link type and designed for the structure to keep constant open-loop. And, the hinge is examined in design stability by finite element analysis method. In this paper, the operation result is presented when the hinge for complex machine open-loop is designed for link type structure.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF