• Title/Summary/Keyword: Cost Improvement

Search Result 3,108, Processing Time 0.03 seconds

The Improved Device of Seoul Subway Fare System (서울 지하철의 운임제도 개선방안)

  • Lee, Tai-Sik;Jun, Young-Joon;Kwon, Ou-Chul;Chung, Jong-Ky;Lee, Dong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.200-205
    • /
    • 2006
  • Subway widely used as a major mean of public transportation both at home and abroad contributes to ease chronic traffic congestion in cities. However, subway operating expense is expected to increase continuously because subway requires vast amount of money at the construction stage, huge sum of maintenance cost is spent during operation, and passenger needs for more convenient facilities is increasing. on the contrary to enormous operating expenses, fare that is occupying most of operating income doesn't come up to its prime cost causing chronic operating deficit. It is urgent to prepare fare system improvement measures to increase operating income in order to resolve financial difficulty of a subway operating organization. Therefore, the current study analyzed present condition and problems of subway fare system, and suggested improvement measures such as improvement of fare adjustment procedure, improvement of free-ride system, diversification of ticket, etc.

The Impact of Information Lead Time Improvement on the Distributed Supply Chain System (분산형 공급체인에서 단계별 정보지연 개선이 주는 효과)

  • 김철수;최근영
    • The Journal of Information Systems
    • /
    • v.10 no.2
    • /
    • pp.129-150
    • /
    • 2001
  • In this study, we model a decentralized supply chain system which is managed by four types of centers, sequentially located: Retailer, Wholesaler, Distributor, and Factory Each center contributes to enhancing the performance of the supply chain system individually with its own local inventory information. Through experiments which are performed with a programmed simulation (like the MIT beer game), we investigate how the information lead time improvement in each center affects the whole system. And we show that the impact of the lead time improvement in the downstream, like retailers, affects more to the system than the one in the upstream, like factories, in a cost-effective way. Moreover, by using information lead time for each center, we analyze how much the extent of the improvement affects the whole system, especially for the total cost and the order level.

  • PDF

A-GNSS Performance Test in Various Urban Environments by Using a Commercial Low Cost GNSS Receiver and Service

  • Han, Kahee;Lee, Jung-Hoon;Im, Ji-Ung;Won, Jong-Hoon
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.7 no.4
    • /
    • pp.205-215
    • /
    • 2018
  • The recent emergence of new Global Navigation Satellite Systems (GNSS) has resulted in a gradual improvement in the performance of positioning services. This paper verifies the degree of improvement in positioning performance of Assisted-GNSS (A-GNSS) receivers using assistance information compared to standalone-GNSS receivers that do not use assistance information in various urban environments in Korea. For this purpose, field tests are performed in various urban and indoor environments in Korea. The assistance information is provided by u-blox's AssistNow Online and low-cost commercial receivers are used for mobile station receivers. Through experiments, the Time to First Fix (TTFF), acquisition sensitivity, and position accuracy performance improvement are analyzed. The results of the experiments show that using assistance data improved the performance in all experiment locations, and, in particular, a significant performance improvement in terms of TTFF.

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.

Flood damage cost projection in Korea using 26 GCM outputs (26 GCM 결과를 이용한 미래 홍수피해액 예측)

  • Kim, Myojeong;Kim, Gwangseob
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.spc
    • /
    • pp.1149-1159
    • /
    • 2018
  • This study aims to predict the future flood damage cost of 113 middle range watersheds using 26 GCM outputs, hourly maximum rainfall, 10-min maximum rainfall, number of days of 80 mm/day, daily rainfall maximum, annual rainfall amount, DEM, urbanization ratio, population density, asset density, road improvement ratio, river improvement ratio, drainage system improvement ratio, pumping capacity, detention basin capacity and previous flood damage costs. A constrained multiple linear regression model was used to construct the relationships between the flood damage cost and other variables. Future flood damage costs were estimated for different RCP scenarios such as 4.5 and 8.5. Results demonstrated that rainfall related factors such as annual rainfall amount, rainfall extremes etc. widely increase. It causes nationwide future flood damage cost increase. Especially the flood damage cost for Eastern part watersheds of Kangwondo and Namgang dam area may mainly increase.

Method and Procedure for Economic Evaluation of Improvement Activities

  • Kono, Hirokazu;Ichikizaki, Osamu
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.2
    • /
    • pp.122-128
    • /
    • 2015
  • The purpose of this paper is to propose an appropriate evaluation scheme for improvement activities, based on a simple model comprising cash inflow by sales as well as variable and fixed cost expenditures. The paper distinguishes capacity surplus and capacity shortage situations, and examines economic benefits gained by yield increase improvement and capacity increase. The paper then proposes a basic rule of thumb for economic evaluation of improvement activities. The logic is simple but useful in practice, being conducive towards improvement activities under current economic conditions with uncertainties.

Comparative Analysis on the Characteristics of High Cost Medical Users between the Health Insurance and Medical Assistance Program (고액진료비 환자의 특성 비교분석 - 의료보험과 의료보호환자를 중심으로 -)

  • Kang, Sunny;Moon, Ok-Ryun
    • Quality Improvement in Health Care
    • /
    • v.2 no.2
    • /
    • pp.112-129
    • /
    • 1996
  • Background : A small number of high cost patients usually spend a larger proportion of scarce health resources. Aged, long-term care and readmitted patients usually belong to these high cost patient group. Among others, long length of stay and readmission can be reduced by checking its cause, and these are the areas needed most of quality improvement activity. Characteristics of high cost medical users between health insurance program and medical assistance program were reviewed. Methods : The inpatient claims of health insurance and medical assistance program were analyzed. Patients were divided by 6 groups; long-term, mid-term, short-term, readmitted, cancer and aged. We defined high cost patients as those who had spent one and half million won and over per 6 months. Characteristics of high cost patients for each group were reviewed. Results : medical assistance patients used much more resources than the insured members in the average hospital cost per case but less in daily hospital cost. The former had a longer length of stay and had much heavier diseases. Major diseases of both group were cancer, diseases of circulatory system and chronic degenerative diseases. Gallstone and schizophrenia were more in the insured program. However, pulmonary tuberculosis, asthma were more common among the medical assistance patients. Early readmission before 2 weeks were 28-30% of the total readmission. Readmission rate in the malignat neoplasm and renal failure were 80% and more. Q.A program should be installed to prevent unnecessary readmissions. Conclusion : Almost 30% of early readmissions and admissions due to complications and long length of stay should be reviewed carefully to keep cost down and to enhance the quality of hospital care.

  • PDF

A Quantitative Analysis of Effects on Enhancing Bus Shelter Infrastructure: Focusing on Contingent Valuation Method by an User's Satisfaction Survey (버스정류장 시설 개선의 정량적 효과 분석: 이용자 만족도 조사 기반 CVM을 중심으로)

  • Kyuhyuk Kim;Myounggyu Kim;Nayeon Kim;Heesoo Kim;Tai-jin Song
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.2
    • /
    • pp.89-105
    • /
    • 2024
  • Bus stop improvement conveys users their usability. It is essential that transportation jurisdictions should identify quantitative effects of a bus stop improvement to invest effectively and expand consistently. Nevertheless, there is currently no research to estimate the quantitative effect on bus stops improvement. In this study, the willingness to pay and the benefit-cost ratio for the bus stops improvement were estimated through a contingent valuation method based on user satisfaction. It was found that the bus stop improvement located in urban areas can achieve high-cost benefits, and it in suburban areas has a great impact on improving the quality of life of local residents. The results of this study will be used as a basis for expanding the bus stop facility improvement project.

Suggestions for Cost Improvement of High concentration Linked Treatment in Municipal Wastewater Treatment Plant (하수처리장에서의 연계처리수 요금 개선에 따른 경제성 분석)

  • Lee, Jiwon;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.22 no.2
    • /
    • pp.139-144
    • /
    • 2020
  • Recently, high-concentration linked wastewater has been introduced into a nearby municipal wastewater treatment plants(MWTPs), but it is difficult to MWTP in local governments due to an unreasonable linked treatment charge system, and there is insufficient evidence or data to prove this. However, the MWTP, which is a national essential infrastructure, is generally exempt from the preliminary feasibility study, so there have been no cases where economic evaluation was conducted. Therefore, we proposed an improvement plan that can compensate for the disadvantages of the existing linked processing charges through previous studies. In this study, a comparative evaluation of how much economic feasibility can be improved compared to the existing ones when applying the improvement plan by conducting an economic analysis. For this, reference was made to the preliminary feasibility assessment data of the existing environmental facilities and the cost factors and benefit factors established during the modernization of the old sewage treatment facilities. As a result of the study, the B/C(Benefit/cost) value was quite low in the past, but when the improvement proposal proposed by the researchers was applied, it was confirmed that the B/C value increased close to 1. Therefore, it is considered to be very reasonable to calculate the linkage processing charge according to the linked wastewater load proposed by the researchers.

Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant (철골 공장가공의 생산성 및 공장간접비율 실태분석)

  • Kim, Kyoung-Won;Ahn, Bang-Ryul;Tae, Yong-Ho;Huh, Young-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF