• Title/Summary/Keyword: Cost Estimating Model

Search Result 337, Processing Time 0.03 seconds

Estimation on Optimum Fishing Effort of Walleye Pollock Fishery in the East Coast of Korea : Based on the Economic Analysis between Danish Seine Fishery and Trawl Fishery for Walleye Pollock (한국 동해 명태 어업의 적정어획노력량 추정 -동해구기선저인망어업과 동해구트롤어업의 경제성분석을 근거로-)

  • 이장욱
    • The Journal of Fisheries Business Administration
    • /
    • v.22 no.2
    • /
    • pp.75-99
    • /
    • 1991
  • A quantitative analysis was carried out to monitor the commercial yield level of walleye pollock Theragra chalcogramma in the east coast of Korea, based on available data on catch and fishing effort, catch per unit of effort including fish prices from 1911 to 1988, using a traditional yield model. The results from the quantitative assessment were based to estimate maximum economic yield (MEY) and optimal fishing effort (E-opt) at MEY. On the other hand, interaction aspects between danish seine fishery and trawl fishery mainly targeting walleye pollock in the east coast of Korea were studied to predict optimal situation in fishing effort level from economic point of view which gives the most benefits to the two fisheries. Total production of walleye pollock in 1911 when its catch record was begun for the first time was about 12, 000 metric tons(M/T), and then the catch trend maintained nearly at the level of 50, 000 M/T per annum, showing a decreasing trend until 1930. The highest production from historical data base on walleye pollock fishery statistics was from the years in 1939 and 1940, about 270, 000 M/T and 26, 000 M/T, respectively. No production of the fish species was recorded during the years from 1943 to 1947, and from 1949 to 1951. From 1952 onwards annual production was only available from the southern part of 38$^{\circ}$N in the east coast. During two decades from 1952 to 1970, the production had sustained about less than 30, 000 M/T every year. Annual production showed an increasing trend from 1971, reaching a maximum level of approximately 162, 000 M/T in 1981. Afterwards, it has deceased sharply year after year and amounted to 180, 000 M/T in 1988. The catch composition of walleye pollock for different fishery segments during 1970~1988 showed that more than 70% of the total catch was from danish seine fishery until 1977 but from 1978 onwards, the catch proportion did not differ from one another, accounting for the nearly same proportion. Catch per unit of effort (CPUE) for both danish seine fishery and trawl fishery maintained a decline tendency after 1977 when the values of CPUE were at level of 800 kg/haul for the former fishery and 1, 300 kg/haul for the latter fishery, respectively. CPUEs of gillnet fishery during 1980~1983 increased to about 3.5 times as high value as in the years, 1970~1979 and during 1987~1988 it decreased again to the level of the years, 1970~1978. The bottom longline fishery's CPUE wa at a very low level (20 kg/basket) through the whole study years, with exception of the value (60 kg/basket) in 1980. Fishing grounds of walleye pollock in the east coast of Korea showed a very limited distribution range. Danish seine fishery concentrated fishing around the coastal areas of Sokcho and Jumunjin during January~February and October~December. Distributions of fishing grounds of trawl fishery were the areas along the coastal regions in the central part of the east coast. Gillnet and bottom longline fisheries fished walleye pollock mainly in the areas of around Sokcho and Jumunjin during January~February and December. Relationship between CPUEs' values from danish seine fishery and trawl fishery was used to standardize fishing effort to apply to surplus production model for estimating maximum sustainable yield (MSY) and optimum fish effort (F-opt) at MSY. The results suggested a MSY of 114, 000 M/T with an estimated F-opt of 173, 000 hauls per year. Based on the estimates of MSY and F-opt, MEY was estimated to be about 94, 000 M/T with a range of 81, 000 to 103, 000 M/T and E-opt 100, 000 hauls per year with a range of 80, 000 to 120, 000 hauls. The estimated values of MEY and E-opt corresponded to 82% of MSY and 58% of F-opt, respectively. An optimal situation in the fishing effort level, which can envisage either simultaneously maximum yield or maximum benefit for both danish seine fishery and trawl fishery, was determined from relationship between revenue and cost of running the fleet : the optimal fishing effort of danish seine fishery was about 52, 000 hauls per year, corresponding to 50 danish seiners and 27, 000 hauls per year which is equal nearly to 36 trawlers, respectively. It was anticipated that the net income from sustainable yield estimated from the respective optimal fishing effort of the two fisheries will be about 3, 800 million won for danish seine fishery and 1, 000 million won for trawl fishery.

  • PDF

Real Option Analysis to Value Government Risk Share Liability in BTO-a Projects (손익공유형 민간투자사업의 투자위험분담 가치 산정)

  • KU, Sukmo;LEE, Sunghoon;LEE, Seungjae
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.4
    • /
    • pp.360-373
    • /
    • 2017
  • The BTO-a projects is the types, which has a demand risk among the type of PPP projects in Korea. When demand risk is realized, private investor encounters financial difficulties due to lower revenue than its expectation and the government may also have a problem in stable infrastructure operation. In this regards, the government has applied various risk sharing policies in response to demand risk. However, the amount of government's risk sharing is the government's contingent liabilities as a result of demand uncertainty, and it fails to be quantified by the conventional NPV method of expressing in the text of the concession agreement. The purpose of this study is to estimate the value of investment risk sharing by the government considering the demand risk in the profit sharing system (BTO-a) introduced in 2015 as one of the demand risk sharing policy. The investment risk sharing will take the form of options in finance. Private investors have the right to claim subsidies from the government when their revenue declines, while the government has the obligation to pay subsidies under certain conditions. In this study, we have established a methodology for estimating the value of investment risk sharing by using the Black - Scholes option pricing model and examined the appropriateness of the results through case studies. As a result of the analysis, the value of investment risk sharing is estimated to be 12 billion won, which is about 4% of the investment cost of the private investment. In other words, it can be seen that the government will invest 12 billion won in financial support by sharing the investment risk. The option value when assuming the traffic volume risk as a random variable from the case studies is derived as an average of 12.2 billion won and a standard deviation of 3.67 billion won. As a result of the cumulative distribution, the option value of the 90% probability interval will be determined within the range of 6.9 to 18.8 billion won. The method proposed in this study is expected to help government and private investors understand the better risk analysis and economic value of better for investment risk sharing under the uncertainty of future demand.

Development of Greenhouse Cooling and Heating Load Calculation Program Based on Mobile (모바일 기반 온실 냉난방 부하 산정 프로그램 개발)

  • Moon, Jong Pil;Bang, Ji Woong;Hwang, Jeongsu;Jang, Jae Kyung;Yun, Sung Wook
    • Journal of Bio-Environment Control
    • /
    • v.30 no.4
    • /
    • pp.419-428
    • /
    • 2021
  • In order to develope a mobile-based greenhouse energy calculation program, firstly, the overall thermal transmittance of 10 types of major covers and 16 types of insulation materials were measured. In addition, to estimate the overall thermal transmittance when the cover and insulation materials were installed in double or triple layers, 24 combinations of double installations and 59 combinations of triple installations were measured using the hotbox. Also, the overall thermal transmittance value for a single material and the thermal resistance value were used to calculate the overall thermal transmittance value at the time of multi-layer installation of covering and insulating materials, and the linear regression equation was derived to correct the error with the measured values. As a result of developing the model for estimating thermal transmittance when installing multiple layers of coverings and insulating materials based on the value of overall thermal transmittance of a single-material, the model evaluation index was 0.90 (good when it is 0.5 or more), indicating that the estimated value was very close to the actual value. In addition, as a result of the on-site test, it was evaluated that the estimated heat saving rate was smaller than the actual value with a relative error of 2%. Based on these results, a mobile-based greenhouse energy calculation program was developed that was implemented as an HTML5 standard web-based mobile web application and was designed to work with various mobile device and PC browsers with N-Screen support. It had functions to provides the overall thermal transmittance(heating load coefficient) for each combination of greenhouse coverings and thermal insulation materials and to evaluate the energy consumption during a specific period of the target greenhouse. It was estimated that an energy-saving greenhouse design would be possible with the optimal selection of coverings and insulation materials according to the region and shape of the greenhouse.

A Study on Web-based Technology Valuation System (웹기반 지능형 기술가치평가 시스템에 관한 연구)

  • Sung, Tae-Eung;Jun, Seung-Pyo;Kim, Sang-Gook;Park, Hyun-Woo
    • Journal of Intelligence and Information Systems
    • /
    • v.23 no.1
    • /
    • pp.23-46
    • /
    • 2017
  • Although there have been cases of evaluating the value of specific companies or projects which have centralized on developed countries in North America and Europe from the early 2000s, the system and methodology for estimating the economic value of individual technologies or patents has been activated on and on. Of course, there exist several online systems that qualitatively evaluate the technology's grade or the patent rating of the technology to be evaluated, as in 'KTRS' of the KIBO and 'SMART 3.1' of the Korea Invention Promotion Association. However, a web-based technology valuation system, referred to as 'STAR-Value system' that calculates the quantitative values of the subject technology for various purposes such as business feasibility analysis, investment attraction, tax/litigation, etc., has been officially opened and recently spreading. In this study, we introduce the type of methodology and evaluation model, reference information supporting these theories, and how database associated are utilized, focusing various modules and frameworks embedded in STAR-Value system. In particular, there are six valuation methods, including the discounted cash flow method (DCF), which is a representative one based on the income approach that anticipates future economic income to be valued at present, and the relief-from-royalty method, which calculates the present value of royalties' where we consider the contribution of the subject technology towards the business value created as the royalty rate. We look at how models and related support information (technology life, corporate (business) financial information, discount rate, industrial technology factors, etc.) can be used and linked in a intelligent manner. Based on the classification of information such as International Patent Classification (IPC) or Korea Standard Industry Classification (KSIC) for technology to be evaluated, the STAR-Value system automatically returns meta data such as technology cycle time (TCT), sales growth rate and profitability data of similar company or industry sector, weighted average cost of capital (WACC), indices of industrial technology factors, etc., and apply adjustment factors to them, so that the result of technology value calculation has high reliability and objectivity. Furthermore, if the information on the potential market size of the target technology and the market share of the commercialization subject refers to data-driven information, or if the estimated value range of similar technologies by industry sector is provided from the evaluation cases which are already completed and accumulated in database, the STAR-Value is anticipated that it will enable to present highly accurate value range in real time by intelligently linking various support modules. Including the explanation of the various valuation models and relevant primary variables as presented in this paper, the STAR-Value system intends to utilize more systematically and in a data-driven way by supporting the optimal model selection guideline module, intelligent technology value range reasoning module, and similar company selection based market share prediction module, etc. In addition, the research on the development and intelligence of the web-based STAR-Value system is significant in that it widely spread the web-based system that can be used in the validation and application to practices of the theoretical feasibility of the technology valuation field, and it is expected that it could be utilized in various fields of technology commercialization.

Private Income Transfers and Old-Age Income Security (사적소득이전과 노후소득보장)

  • Kim, Hisam
    • KDI Journal of Economic Policy
    • /
    • v.30 no.1
    • /
    • pp.71-130
    • /
    • 2008
  • Using data from the Korean Labor & Income Panel Study (KLIPS), this study investigates private income transfers in Korea, where adult children have undertaken the most responsibility of supporting their elderly parents without well-established social safety net for the elderly. According to the KLIPS data, three out of five households provided some type of support for their aged parents and two out of five households of the elderly received financial support from their adult children on a regular base. However, the private income transfers in Korea are not enough to alleviate the impact of the fall in the earned income of those who retired and are approaching an age of needing financial assistance from external source. The monthly income of those at least the age of 75, even with the earning of their spouses, is below the staggering amount of 450,000 won, which indicates that the elderly in Korea are at high risk of poverty. In order to analyze microeconomic factors affecting the private income transfers to the elderly parents, the following three samples extracted from the KLIPS data are used: a sample of respondents of age 50 or older with detailed information on their financial status; a five-year household panel sample in which their unobserved family-specific and time-invariant characteristics can be controlled by the fixed-effects model; and a sample of the younger split-off household in which characteristics of both the elderly household and their adult children household can be controlled simultaneously. The results of estimating private income transfer models using these samples can be summarized as follows. First, the dominant motive lies on the children-to-parent altruistic relationship. Additionally, another is based on exchange motive, which is paid to the elderly parents who take care of their grandchildren. Second, the amount of private income transfers has negative correlation with the income of the elderly parents, while being positively correlated with the income of the adult children. However, its income elasticity is not that high. Third, the amount of private income transfers shows a pattern of reaching the highest level when the elderly parents are in the age of 75 years old, following a decreasing pattern thereafter. Fourth, public assistance, such as the National Basic Livelihood Security benefit, appears to crowd out private transfers. Private transfers have fared better than public transfers in alleviating elderly poverty, but the role of public transfers has been increasing rapidly since the welfare expansion after the financial crisis in the late 1990s, so that one of four elderly people depends on public transfers as their main income source in 2003. As of the same year, however, there existed and occupied 12% of the elderly households those who seemed eligible for the National Basic Livelihood benefit but did not receive any public assistance. To remove elderly poverty, government may need to improve welfare delivery system as well as to increase welfare budget for the poor. In the face of persistent elderly poverty and increasing demand for public support for the elderly, which will lead to increasing government debt, welfare policy needs targeting toward the neediest rather than expanding universal benefits that have less effect of income redistribution and heavier cost. Identifying every disadvantaged elderly in dire need for economic support and providing them with the basic livelihood security would be the most important and imminent responsibility that we all should assume to prepare for the growing aged population, and this also should accompany measures to utilize the elderly workforce with enough capability and strong will to work.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

A Machine Learning-based Total Production Time Prediction Method for Customized-Manufacturing Companies (주문생산 기업을 위한 기계학습 기반 총생산시간 예측 기법)

  • Park, Do-Myung;Choi, HyungRim;Park, Byung-Kwon
    • Journal of Intelligence and Information Systems
    • /
    • v.27 no.1
    • /
    • pp.177-190
    • /
    • 2021
  • Due to the development of the fourth industrial revolution technology, efforts are being made to improve areas that humans cannot handle by utilizing artificial intelligence techniques such as machine learning. Although on-demand production companies also want to reduce corporate risks such as delays in delivery by predicting total production time for orders, they are having difficulty predicting this because the total production time is all different for each order. The Theory of Constraints (TOC) theory was developed to find the least efficient areas to increase order throughput and reduce order total cost, but failed to provide a forecast of total production time. Order production varies from order to order due to various customer needs, so the total production time of individual orders can be measured postmortem, but it is difficult to predict in advance. The total measured production time of existing orders is also different, which has limitations that cannot be used as standard time. As a result, experienced managers rely on persimmons rather than on the use of the system, while inexperienced managers use simple management indicators (e.g., 60 days total production time for raw materials, 90 days total production time for steel plates, etc.). Too fast work instructions based on imperfections or indicators cause congestion, which leads to productivity degradation, and too late leads to increased production costs or failure to meet delivery dates due to emergency processing. Failure to meet the deadline will result in compensation for delayed compensation or adversely affect business and collection sectors. In this study, to address these problems, an entity that operates an order production system seeks to find a machine learning model that estimates the total production time of new orders. It uses orders, production, and process performance for materials used for machine learning. We compared and analyzed OLS, GLM Gamma, Extra Trees, and Random Forest algorithms as the best algorithms for estimating total production time and present the results.