Browse > Article
http://dx.doi.org/10.13088/jiis.2021.27.1.177

A Machine Learning-based Total Production Time Prediction Method for Customized-Manufacturing Companies  

Park, Do-Myung (Department of MIS, Dong-A University)
Choi, HyungRim (Department of MIS, Dong-A University)
Park, Byung-Kwon (Department of MIS, Dong-A University)
Publication Information
Journal of Intelligence and Information Systems / v.27, no.1, 2021 , pp. 177-190 More about this Journal
Abstract
Due to the development of the fourth industrial revolution technology, efforts are being made to improve areas that humans cannot handle by utilizing artificial intelligence techniques such as machine learning. Although on-demand production companies also want to reduce corporate risks such as delays in delivery by predicting total production time for orders, they are having difficulty predicting this because the total production time is all different for each order. The Theory of Constraints (TOC) theory was developed to find the least efficient areas to increase order throughput and reduce order total cost, but failed to provide a forecast of total production time. Order production varies from order to order due to various customer needs, so the total production time of individual orders can be measured postmortem, but it is difficult to predict in advance. The total measured production time of existing orders is also different, which has limitations that cannot be used as standard time. As a result, experienced managers rely on persimmons rather than on the use of the system, while inexperienced managers use simple management indicators (e.g., 60 days total production time for raw materials, 90 days total production time for steel plates, etc.). Too fast work instructions based on imperfections or indicators cause congestion, which leads to productivity degradation, and too late leads to increased production costs or failure to meet delivery dates due to emergency processing. Failure to meet the deadline will result in compensation for delayed compensation or adversely affect business and collection sectors. In this study, to address these problems, an entity that operates an order production system seeks to find a machine learning model that estimates the total production time of new orders. It uses orders, production, and process performance for materials used for machine learning. We compared and analyzed OLS, GLM Gamma, Extra Trees, and Random Forest algorithms as the best algorithms for estimating total production time and present the results.
Keywords
Order production; Total production time; Machine learning;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Navver, j., S. Slater, "The Effect of a Market Orientation on Business Profitability," Journal of Marketing, Vol54(1990), 20-35   DOI
2 Park, H. S., Hands-On Machine Learning with Scikit-Learn & TensorFlow, Hanbit Media Inc, (2018)
3 Park, J. M., "A Study on the Perception of Corporate Members on the Factors of Productivity Improvement", Korea Productivity Association, Vol10(1995), 178-181
4 Park, S. H., S. W. Choi, "Establishment of Standard Times Using STD Technique in Multi-product and One-unit Production System", Korean Association of Industrial Business Administration, Vol10(1987), 28-30
5 Perter, M., N. John, Generalized Linear Models, Second Edition, Chapman and Hall/CRC, (1989)
6 Ryu, H. K., "OLAP and Decision Tree Analysis of Productivity Affected by Construction Duration Impact Factors", Journal of the Korea Institute of Building Construction, Vol11 (2011), 106
7 Scikit-learn developers, User Guide, 2007-2020, https://scikit-learn.org/stable/modules/linear_model.html
8 Scikit-learn developers, User Guide, 2007-2020, https://scikit-learn.org/stable/modules/ensemble.html
9 Taylor., F. W, The Principles of Scientific Management, ModiBooks, (2016)
10 Wikipedia, (2020), https://en.wikipedia.org/wiki/Time_and_motion_study
11 Woo. M. S., J. W. Yoo. "Impact of relative investment in SFA technology on new product success through market information acquisition process and perceived intelligence quality: Moderation Effect of Market Uncertainty and Technical Turbulence", Korea Productivity Association, Vol32(2018), 174-176
12 Dwight, D. E., "A speech to the National Defense Executive Reserve Conference in Washington, DC", (1957)
13 Cho, H. J., J. I. Park, "A Method for Construction Productivity index for Increasing Productivity", Korean Institute Of Industrial Engineers, (2010), 832
14 Choi, J. H., H. J. Kwon and J. Y. Woo and P. Park, "A case study of work improvement adapting standard time and line balancing on a manufacturing process", Journal of the Korea Institute of Plat Engineering, Vol3(1998), 172
15 Davis, F. D., "Perceived Usefulness, Perceived Ease of Use, and User Acceptance of Information Technology", MIS Quarterly, Vol.13(1989), 319-342   DOI
16 Goldratt, E., The Goal second revised edition., Dongyangbooks, (2002)
17 Epstein, M. J., M. J. Roy, "Improving sustainability performance: Specifying, implementing and measuring key principles", Journal of General Management, Vol.29(2003), 15-31   DOI
18 Kim, D. W., J. Y. Lee and K. H. Cho, "Algorithms for establishing production schedule plans for custom production plants and systems for establishing production schedule plans using them", Korea Intellectual Property Office, (2012)
19 Friedman, M., The social responsibility of business is to increase its profits, The New York Times Magazine, September 13 (1970)
20 Harris, D., Improving Regressors using Boosting Techniques, (1997)
21 Kim, G. H., "A Study on the Evaluation of MBO Operation and Effectiveness", The Korea Association for Policy Studies, Vol13(2004), 52-54
22 Lee, D. H., S. Y. Cho and H. W. Kim, "A Study on the Increase of Satisfaction and Productivity of Smart Work", Korea Society of Management Information Systems, (2013), 298-299
23 Kim, S. M., J. K. Ahn, "Verification of ERP Standard Time Using TOC Technique and Improvement of MES Routing Point", Journal of Society of Korea Industrial and System Engineering, Vo141(2018), 30-31
24 Kim, S. Y., H. Y. Soon and S. W. Choi, "Intelligent Digital Factory for Productivity Innovation: Remodeling of A Tractor Factory", Korea Productivity Association, Vol23(2009), 6-7
25 Kim, Y. Y., "Manufacturing Innovation and HPC(High Performance Computing) Utilization", Korea Technology Innovation Society, Vol19 (2016), 250
26 Lee, J., H. S. Kang, Environmental management theory, Hyungseol publishing house, 2003
27 Aleksei, G., "Histogram-Based Algorithm for Building Gradient Boosting Ensembles of Piecewise Linear Decision Trees", International Conference on Analysis of Images, Social Networks and Texts, (2019), 38-50
28 Alexey, N., K. Alois, "Gradient boosting machines, a tutorial", US National Library of Medicine National Institutes of Health, (2013)
29 Lee, S. K., Y. H. Lee, "Production Scheduling employing ERP in the make-to-order manufacturing system", IE Interfaces, Vol12(1999), 427-429
30 Lee, K. J., "Establishment of Standard Time for Stranding Process of a Cable Company in Small Quantity Batch Production System", Journal of the Society of Korea Industrial and System Engineering, Vol35(2012), 100-101
31 Maltz, E., A. K. Kohla, "Market Intelligence Dissemination Across Functional Boundaries", Journal of Marketing Research, Vol33(1996), 47-61   DOI
32 Mishra, G. J., D, P, Sehgal, "Quantitative Structure Activity Relationship study of the AntiHepatitis Peptides employing Random Forests and Extra-trees regressors", Bioinforamtion, Vol13(2017),