• Title/Summary/Keyword: Cost Effective Analysis

Search Result 1,778, Processing Time 0.033 seconds

An Evaluation of Effects on Hypertension and Diabetes Mellitus Management of a Community-Based Nursing Care Center Using Cost-Benefit Analysis (비용편익분석을 이용한 일 재가노인간호센터의 고혈압 및 당뇨관리 효과평가)

  • Lim, Ji-Young;Im, Jung-Nam;Kim, In-A;Ko, Su-Kyoung
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.16 no.3
    • /
    • pp.295-305
    • /
    • 2010
  • Purpose: This study was conducted to evaluate the economic efficiency of a community-based nursing care center to help policy makers determine whether or not to invest in similar facilities. Methods: The subjects were 101 elderly people over 65 years who participated in a health management program from February 1 to July 31, 2007. Direct cost was estimated with center operations cost, medical cost for out-patients and pharmacy cost. Indirect cost was measured by transportation cost. Direct benefit was calculated by saved medical cost for out-patients, saved pharmacy cost, saved transportation cost, and reducing hospital charges. Indirect benefit was estimated with prevention of severe complications. Economic efficiency was evaluated by cost-benefit ratio and net benefit. Results: Operating a community-based nursing care center was found to be cost-effective. Specifically, the cost of operating the center evaluated here was estimated at 135 million won while the benefit was estimated at 187 million won. Benefit-cost ratio was 1.38. Conclusion: The Community-based nursing care center that was described here could be a useful health care delivery system for reducing medical expenditures.

Constructability and Cost Analysis of the Clip-Type Binding Implement Substituting 135° End-Hooked Transverse Reinforcement in Reinforced Concrete Columns (철근콘크리트 기둥의 띠철근에서 135° 갈고리 대체 클립형 연결장치의 시공성 및 비용 분석)

  • Park, Koung-Yeun;Yun, Hyun-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.459-469
    • /
    • 2020
  • The purpose of this study is to secure the same or more structural performance and constructability for the detail off hooks cross-constructed at 135° used as external-ties standard detail in reinforced concrete columns, therefore, to the purpose of improving constructability, The clip-type binding implement was suggested. the experiment on the constructability evaluation and cost analysis of the clip-type binding implement by 90° end-hooked transverse reinforcement in reinforced conrete columns was carried out. The results of the analysis confirmed that standard detail column took about an one hour regardless of the diameter of tie. When using the clip-type binding implement, It was reduced to about 50% of the standard detail column. and regardless of the building size, it was most effective for the cost down when using the clip-type binding implement 1ea, it was about 32% fo labor cost reduction effect in comparison with using standard detail. as a result, Using the clip-type binding implement is shown be very effective in the working time and construction cost reduction.

A study of the effect of S-city's air pollution cleaning cost. (S시의 대기환경관련 투자 효과에 관한 연구)

  • Choi, Young-Tei;Cho, Jai-Rip
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.11a
    • /
    • pp.283-286
    • /
    • 2006
  • The study of The cost of cleaning S-city's air pollution is effective. The cost is calculated by ABC distribution system and analysed the air pollution and cost's correlation. Because the whole air pollution's analysis is so heavy, We did about vehicle's pollution.

  • PDF

Development of Construction Cost Analysis Process Based on Structural Building Information Modeling (구조BIM기반 공사비 상세분석 프로세스 구축)

  • Lee, Seung-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

Economic Evaluation of Investigation Method Using Cost-Benefit Analysis (비용편익분석을 이용한 사면조사기법의 경제성 평가)

  • Kim, Yong-Soo;Jung, Soo-Jung;Ahn, Sang-Ro
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1076-1085
    • /
    • 2009
  • Recent heavy rains and typhoons broke down road slopes, which caused a hazard to safety. As a result, interests in the effective investment for disaster prevention is increasing. Measures of investigation method for slope have been taken, but the financial costs have never been analysed. This study applied the cost-benefit analysis theory used in public economics to the evaluation of the financial reasonability of management for slope. By applying cost-benefit analysis to road slope investigation method, the reduction of safety costs and resulting financial benefits can be seen and it also clarifies the reasonability and investment effects of slope management.

  • PDF

Cost-effectiveness Analysis of Bojungikgitang and Banhabaekchulchonmatang in Chronic Tinnitus Patients (이명증에 대한 보중익기탕과 반하백출천마탕의 비용효과 분석 연구)

  • Kim, Nam-Kwen;Oh, Yong-Leol;Seo, Eun-Sung;Lee, Dong-Hyo
    • The Journal of Korean Medicine Ophthalmology and Otolaryngology and Dermatology
    • /
    • v.23 no.1
    • /
    • pp.260-269
    • /
    • 2010
  • Background : Bojungikgitang(BJT) and Banhabaekchulchonmatang(BBT) are known to treat the tinnitus patients, which were registered Korean National Health Insurance coverage lists. Objective : Few studies have evaluated economic benefits of both herbal medicines. This research is to investigate the cost-effectiveness of Bojungikgitang(BJT) and Banhabaekchulchonmatang(BBT) in chronic tinnitus patients over nineteen years old. Method : We built the decision tree model of chronic tinnitus and executed the deterministic analysis and threshold sensitivity analysis based on randomized clinical trial. Effectiveness was measured in quality-adjusted life-years(QALYs), and costs were in 2009 KRW(South Korean Currency). The perspective is societal, time horizon is 10 weeks, and Korean willingness to pay threshold is assumed to 20,000,000KRW. Results : In the base case analysis, BJT treatment resulted is better outcomes as low cost, so BJT is dominant medicine and BBT is dominated. But both cost per QALYs (BJT is 3,120,339KWN per QALY, BBT is 3,505,780KWN per QALY) are lower than the threshold, that could be covered by Korean National Health Insurance(KNHI). Conclusion : This study results showed that BJT was more cost-effective than BBT treating tinnitus patients for 10 weeks, and the cost per QALYs of both alternatives were lower than Korean national threshold.

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

Economic Value of Platelet Glycoprotein IIb/IIIA Receptor Blocker (Abciximab) for Percutaneous Coronary Intervention (PCI시술시 혈소판 당단백 GP IIb/IIIA 억제제(Abciximab) 투여의 경제적 가치)

  • Kim, Jin-hyun;Shin, Sang-Jin;Kim, Eun-Ju;Lee, Young-Hee
    • YAKHAK HOEJI
    • /
    • v.51 no.3
    • /
    • pp.186-193
    • /
    • 2007
  • This study was performed to analyse the economic value of abciximab which is used in PCI to prevent high-risk patients with ischemic complications. The effectiveness of abciximab was extracted from published clinical trials by search-ing CCIS, and the direct medical costs relevant to using abciximab were estimated from the NHI claims database. The results in terms of cost per life-year gained (LYG) and cost per QALY gained showed that abciximab was cost-effective enough to deserve its cost. Social net benefit resulting from abciximab in PCI was estimated to be 60-70 billion Won per year.

Development of Data Warehouse Systems to Support Cost Analysis in the Ship Production (조선산업의 비용분석 데이터 웨어하우스 시스템 개발)

  • Hwang, Sung-Ryong;Kim, Jae-Gyun;Jang, Gil-Sang
    • IE interfaces
    • /
    • v.15 no.2
    • /
    • pp.159-171
    • /
    • 2002
  • Data Warehouses integrate data from multiple heterogeneous information sources and transform them into a multidimensional representation for decision support applications. Data warehousing has emerged as one of the most powerful tools in delivering information to users. Most previous researches have focused on marketing, customer service, financing, and insurance industry. Further, relatively less research has been done on data warehouse systems in the complex manufacturing industry such as ship production, which is characterized complex product structures and production processes. In the ship production, data warehouse systems is a requisite for effective cost analysis because collecting and analysis of diverse and large of cost-related(material/production cost, productivity) data in its operational systems, was becoming increasingly cumbersome and time consuming. This paper proposes architecture of the data warehouse systems to support cost analysis in the ship production. Also, in order to illustrate the usefulness of the proposed architecture, the prototype system is designed and implemented with the object of the enterprise of producing a large-scale ship.

Development of a Numerical Analysis Method for the Outage Cost Assessment at Load Points (부하지점별 공급지장비추정을 위한 수치해석적 방법의 개발)

  • Choi, Jae-Seok;Kim, Hong-Sik;Moon, Seung-Pil;Kang, Jin-Jong;Kim, Ho-Yong;Park, Dong-Wook
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.549-557
    • /
    • 2000
  • This study proposes a new numerical analysis method for assessing the outage cost of the composite power system with considering transmission system at load points. The proposed method comes from combination of the expected energy not served curve(EENSC) with the marginal outage cost function obtained at load points. Uncertainty of the outages of the generation and transmission systems was also included in this study. This study can be categorized into three processing parts as like as follows. Firstly, EENSC at load points was developed newly from the composite power system effective load duration curve which has been proposed by the authors. Secondly, this study proposes a new technical method for determining the coefficients of the marginal outage cost functions at load points in the composite power system(Generation and Transmission systems). It is a main key point that the mathematical expression for the marginal outage cost function at a load point is formulated and evaluated using relations between the GNP (or GDP) and the electrical energy demand at the load pint. Finally, the outage cost was calculated in this paper by combining the proposed EENSC with the marginal outage cost function evaluated at each load point. It is another important feature that the average costs for future at load points can be forescasted using the proposed approach. The effectiveness of the proposed new approach is demonstrated by the case studies with the IEEE-RTS.

  • PDF