• 제목/요약/키워드: Conveyor line

검색결과 66건 처리시간 0.031초

컨베이어 벨트를 이용한 혼합 모델 조립 라인에서의 미완료 작업량을 최소화하기 위한 제품 투입 순서 결정

  • 김시원;정봉주
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2000년도 추계학술대회 및 정기총회
    • /
    • pp.157-160
    • /
    • 2000
  • This study is concerned with how to optimize the Input sequence of product models with sequence -dependent setup time in Mixed-Model Assembly Line (MMAL) using conveyor system. Usually MMAL consists of a number of stations linked by conveyor belt and each station has a work zone limited by upstream and downstream boundaries. To avoid improper interference between operators in the adjacent stations and excess of machine moving range, operators are forced to complete their operations within their predetermined work zone. In this study, our goal is to determine sequence of models for minimizing the total work unfinished within their work zone. A generalized formulation of the product sequencing problem in MMAL is presented and we developed an optimal procedure using Branch & Bound. Also we developed a heuristic procedure using local search.

  • PDF

물류 시스템 적용 유도전동기의 전압강하와 역률 보상 관계 (Voltage Drop and Power Factor Compensation Relation of Induction Motor applied to Logistics System)

  • 김종겸
    • 전기학회논문지P
    • /
    • 제67권3호
    • /
    • pp.155-159
    • /
    • 2018
  • Recently, the expansion or establishment of facilities for the logistics system is increasing. Conveyor facilities play a major role in sorting and transporting logistics. Induction motors are widely used for the operation of these conveyor systems. In the logistics system, a large number of induction motors are used. These motors have a considerable distance from the power source side and have a low power factor. The installation position for the power factor compensation of the induction motor is very important. Since the voltage drop depends on the length of the line, it is an important parameter in capacitor capacity determination for power factor compensation. The capacity of the capacitors installed to compensate the power factor of the inductive load should be designed to the extent that self-excitation does not occur. In this study, we analyze the method of compensating the proper power factor considering the voltage drop and the installation position of the induction motor in the logistics system.

자동차 도장공정의 생산성 향상을 위한 시뮬레이션 분석 (Analysis of the Productivity of Automobile Painting Process Using Computer Simulation)

  • 김원경
    • 한국시뮬레이션학회논문지
    • /
    • 제8권2호
    • /
    • pp.73-85
    • /
    • 1999
  • In this paper, the productivity estimation of the painting line in an automobile plant is studied. To improve the bottleneck and the weak point of the process, computer simulations are performed. In determining the system specification, the status of the conveyor lines and the other physical facilities are considered in order not to intervene with each other and to satisfy the painting facility restrictions. As simulation parameters, production performance ratio, number of hanger and dolley, down time, speed of conveyor and the pitch of a painting body are chosen on the basis of exhaustive field evaluation to study their effects on the capacity of the process. The results of the simulation show that we can improve the capability of they system without additional investment to the plant facility. The best condition for the maximum capacity of the process is selected by comparing the alternative computer simulation results. As a simulation language, Promodel is used which is very useful and easy to use in manufacturing oriented simulation.

  • PDF

카메라를 이용한 타이어 트레드 압출라인 자동화 (Automation of Tire Tread Extruder Line Using Cameras)

  • 표춘선;유준
    • 제어로봇시스템학회논문지
    • /
    • 제19권3호
    • /
    • pp.262-267
    • /
    • 2013
  • This paper describes a vision based automation case study for the tire tread extruder line. To accurately measure the thread widths, two cameras with laser line illumination have been installed near the takeaway conveyer. The overall tread extruder line is then automated by controlling the speeds of take away conveyor and screw motor such that a difference between measured widths and the targeted data is minimized. By doing this, the conventional tread extruder line has been replaced by the developed automated computer system and with only one operator, increasing the production efficiency and reducing safety accidents.

시뮬레이션 기법(技法)을 이용한 물류(物流) 시스템 개선(改善)에 관한 연구(硏究) (Material Handling System Improvement Analysis Applying Simulation Technique)

  • 신현표;박성연;이화기
    • 산업공학
    • /
    • 제5권1호
    • /
    • pp.35-46
    • /
    • 1992
  • This paper deals with analysis of material handling system efficiency of a heat-exchanger manufacturing line. This line is a typical flow shop type assembly line which consists of 10 steps of assembly stations. Each station have one or two workers who assemble and move components for the job, and no special transporters for component's movement. Therfore, all the workers are involoved in unnecessary moving activities which decrease overall production efficiencies of the line. To improve productivities, production outputs and worker's job performances for this assembly line, the several alternatives are considered such as installing new conveyor lines and automatic guided vehicle(AGV) system. Analyzing economic feasibilities and responses of the system alternatives, an experimental simulation model is built suing SIMAN Ver. 3. 5 simulation language with CINEMA package for animation of the process flow. Through this animation process a vivid picturial analysis could performed on the process flow.

  • PDF

다수 표면실장기계를 포함하는 PCB조립라인의 작업분배 알고리즘 설계 II

  • 김진철;이성한;이범희
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.1237-1240
    • /
    • 1996
  • This paper proposes a heuristic algorithm for performing the line balancing of PCB assembly fine including multiple surface mounters efficiently. We consider a PCB assembly line including the multiple surface mounters arranged serially as a target system. We assume that the number of heads of surface mounters can be changed. Also, the conveyor is assumed to move at a constant speed and have no buffer. Considering the minimum number of machines required for the desired production rate is a discrete nonincreasing function which is inversely proportional to the cycle time, we propose an optimization algorithm for line balancing by using the binary search method. Also we propose an head-changing algorithm. The algorithms are validated through the computer simulation.

  • PDF

Cell 방식 포장공정에서의 Missing Item 검사 및 관리 시스템 개발 (Development of Missing Item Detection and Management System under Cell Type Packaging Processes)

  • 김현우;최현의;안호균;윤태성
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2009년도 정보 및 제어 심포지움 논문집
    • /
    • pp.344-346
    • /
    • 2009
  • Cell type packaging line is more suitable for the products with various models and small quantities like mobile phone or mp3 player than conveyor type packaging line. Cell type packaging line is applicable to package various product models, but it can cause wrong product compositions and missing of items. So, automatic missing item detection system is needed. We designed an missing item detection system with a bar code reader, infrared sensors, and s digital camera. and also developed the programs for sensor data acquisition, image data processing, GUI, and data management.

  • PDF

자동차 조립 라인의 디지털 생산 구축 사례연구 (Digital Manufacturing Strategy & Case study of Automotive General Assembly)

  • 최무웅;한승택;서정훈;우종훈;이춘재;최양렬
    • 한국CDE학회논문집
    • /
    • 제10권3호
    • /
    • pp.199-209
    • /
    • 2005
  • In this paper, a digital simulation model for an automotive assembly line is constructed by adapting a digital manufacturing methodology. Applied methodology is a simulation for a plant level of the assembly production line. The first significance of this methodology is a validation of the production planning based on various scenarios. The second is pre-verification for the new production plan or production method. The third is a visualization of the production process. Several models were implemented and those models were verified. Then, it was possible to find a most efficient production scenario and production method.

시각 장치를 사용한 조선 소조립 라인에서의 용접부재 위치 인식 (Position Estimation of the Welding Panels for Sub-assembly line in Shipbuilding by Vision System)

  • 노영준;고국원;조형석;윤재웅;전자롬
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1997년도 춘계학술대회 논문집
    • /
    • pp.719-723
    • /
    • 1997
  • The welding automation in ship manufacturing process,especially in the sub-assembly line is considered to be a difficult job because the welding part is too huge, various, unstructured for a welding robot to weld fully automatically. The weld orocess at the sub-assembly line for ship manufacturing is to joint the various stiffener on the base panel. In order to realize automatic robot weld in sub-assembly line, robot have to equip with the sensing system to recognize the position of the parts. In this research,we developed a vision system to detect the position of base panle for sub-assembly line is shipbuilding process. The vision system is composed of one CCD camera attached on the base of robot, 2-500W halogen lamps for active illumination. In the image processing algorithm,the base panel is represented by two set of lines located at its two corner through hough transform. However, the various noise line caused by highlight,scratches and stiffener,roller in conveyor, and so on is contained in the captured image, this nosie can be eliminated by region segmentation and threshold in hough transform domain. The matching process to recognize the position of weld panel is executed by finding patterns in the Hough transformed domain. The sets of experiments performed in the sub-assembly line show the effectiveness of the proposed algorithm.

  • PDF

ESD 접지선 단선 모니터링 시스템 설계 및 구현 (Design and implementation of ESD cable Disconnection Monitoring System)

  • 성정모;정영석;박구락
    • 한국융합학회논문지
    • /
    • 제8권8호
    • /
    • pp.77-82
    • /
    • 2017
  • 디스플레이 제조 공정에서는 패널의 이송 목적으로 컨베이어 시스템이 널리 사용된다. 이 컨베이어에는 정전기로 인한 제품 불량을 예방하기 위해 접지선이 다수 사용되는데, 이송 롤러의 회전 운동이나 말림 등의 원인으로 접지선이 단선되어 제품 불량으로 이어지는 경우가 빈번히 발생된다. 이런 문제 해결을 위해 접지선의 단선을 실시간으로 검출 가능한 시스템의 필요성이 커지고 있다. 따라서 본 논문에서는 컨베이어 구동부와 패널의 마찰로 발생되는 ESD(Electro-Static Discharge) 접지선의 단선 모니터링 시스템을 제안한다. 제안 시스템은 ATmega 2560 및 휘트스톤 브릿지(Wheatstone Bridge) 회로를 이용해 접지선의 단선 및 탈조 검출이 가능한 모니터링 시스템으로써, 접지선의 단선을 즉시 검출해 조치할 수 있으므로, 정전기로 인한 제품의 불량률을 줄일 수 있다. 본 논문에서 제안한 시스템은 접지선이 사용되는 산업의 생산 및 시험 장비에 적용 가능할 것으로 기대된다.