• Title/Summary/Keyword: Conventional project

Search Result 457, Processing Time 0.022 seconds

Efficient Resource Allocation Schemes for Relay-based Cooperative Networks in 3GPP LTE-Advanced Systems (3GPP LTE-Advanced 시스템에서 릴레이 기반의 협력 네트워크를 위한 효율적인 자원할당 기법)

  • Kim, San-Hae;Yang, Mo-Chan;Lee, Je-Yeon;Shin, Yo-An
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.6A
    • /
    • pp.555-567
    • /
    • 2010
  • Unlike single-hop systems, multi-hop systems that use relay nodes assign a part of the overall resources to relay communications. If efficient resource allocation schemes are not adopted, this leads to a loss of resources. Moreover, because we may not be able to guarantee high-link performance due to the adjacent-cell interference in relay-based cellular systems, resource efficiency can be severely decreased. In this paper, we propose efficient resource allocation schemes for downlink relay-based networks in 3GPP (3rd Generation Partnership Project) LTE (Long Term Evolution)-Advanced systems. Unlike conventional schemes that have static resource regions for each data link, the proposed schemes dynamically allocate the resources of each link to resource blocks, by considering the channel state and the capacity of each link. We also propose resource overlapping schemes in which two different links overlap at the same resource region, so as to improve cell or user throughput performance. The proposed resource overlapping schemes do not require additional processes such as interference cancellation in users, thank to considering additional interference from resource overlapping in advance.

Development of a Real-time OS Based Control System for Laparoscopic Surgery Robot (복강경 수술로봇을 위한 실시간 운영체제 기반 제어 시스템의 개발)

  • Song, Seung-Joon;Park, Jun-Woo;Shin, Jung-Wook;Kim, Yun-Ho;Lee, Duk-Hee;Jo, Yung-Ho;Choi, Jae-Seoon;Sun, Kyung
    • Journal of Biomedical Engineering Research
    • /
    • v.29 no.1
    • /
    • pp.32-39
    • /
    • 2008
  • This paper reports on a realtime OS based master-slave configuration robot control system for laparoscopic surgery robot which enables telesurgery and overcomes shortcomings with conventional laparoscopic surgery. Surgery robot system requires control system that can process large volume information such as medical image data and video signal from endoscope in real-time manner, as well as precisely control the robot with high reliability. To meet the complex requirements, the use of high-level real-time OS (Operating System) in surgery robot controller is a must, which is as common as in many of modem robot controllers that adopt real-time OS as a base system software on which specific functional modules are implemened for more reliable and stable system. The control system consists of joint controllers, host controllers, and user interface units. The robot features a compact slave robot with 5 DOF (Degree-Of-Freedom) expanding the workspace of each tool and increasing the number of tools operating simultaneously. Each master, slave and Gill (Graphical User Interface) host runs a dedicated RTOS (Real-time OS), RTLinux-Pro (FSMLabs Inc., U.S.A.) on which functional modules such as motion control, communication, video signal integration and etc, are implemented, and all the hosts are in a gigabit Ethernet network for inter-host communication. Each master and slave controller set has a dedicated CAN (Controller Area Network) channel for control and monitoring signal communication with the joint controllers. Total 4 pairs of the master/slave manipulators as current are controlled by one host controller. The system showed satisfactory performance in both position control precision and master-slave motion synchronization in both bench test and animal experiment, and is now under further development for better safety and control fidelity for clinically applicable prototype.

Design and Performance Analysis of Hybrid Receiver based on System Level Simulation in Backhaul System (백홀 시스템에서 시스템 레벨 시뮬레이션 기반 하이브리드 수신기 설계 및 성능 분석)

  • Moon, Sangmi;Chu, Myeonghun;Kim, Hanjong;Kim, Daejin;Hwang, Intae
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.11
    • /
    • pp.3-11
    • /
    • 2015
  • An advanced receiver which can manage inter-cell interference is required to cope with the explosively increasing mobile data traffic. 3rd Generation Partnership Project (3GPP) has discussed network assisted interference cancellation and suppression (NAICS) to improve signal-to-noise-plus-interference ratio (SINR) and receiver performance by suppression or cancellation of interference signal from inter-cells. In this paper, we propose the advanced receiver based on soft decision to reduce the interference from neighbor cell in LTE-Advanced downlink system. The proposed receiver can suppress and cancel the interference by calculating the unbiased estimation value of interference signal using minimum mean square error (MMSE) or interference rejection combing (IRC) receiver. The interference signal is updated using soft information expressed by log-likelihood ratio (LLR). We perform the system level simulation based on 20MHz bandwidth of 3GPP LTE-Advanced downlink system. Simulation results show that the proposed receiver can improve SINR, throughput, and spectral efficiency of conventional system.

Low Temperature Hermetic Packaging by Localized Heating using Forced Potential Scheme Micro Heater (Forced Potential Scheme 미세 가열기를 이용한 부분 가열 저온 Hermetic 패키징)

  • 심영대;신규호;좌성훈;김용준
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.10 no.2
    • /
    • pp.1-5
    • /
    • 2003
  • In this project, the efficiency of localized heating for micro systems packaging is developed by using a forced potential scheme microheater. Less than 0.2 Mpa contact pressure was used for bonding with a 200 mA current input for $50{\mu}m$ width, $2{\mu}m$ height and $8mm{\times}8mm$, $5mm{\times}5mm$, $3mm{\times}3mm$ sized phosphorus-doped poly-silicon microheater. The temperature can be raised at the bonding region to $800^{\circ}C$, and it was enough to achieve a strong and reliable bonding in 3 minutes. The IR camera test results show improved uniformity in heat distribution compared with conventional microheaters. For performing the gross leak check, IPA (Isopropanol Alcohol) was used. Since IPA has better wetability than water, it can easily penetrate small openings, and is more suitable for conducting a gross leak check. The pass ratio of bonded dies was 67%, for conventional localized heating, and 85% for our newly developed FP scheme. The bonding strength was more than 25Mpa for FP scheme packaging, which shows that FP scheme can be a good candidate for micro-scale hermetic packaging.

  • PDF

Case Study of Civil-BIM & 3D Geographical Information (3차원 지형자료와 토목 BIM의 사례적용 연구)

  • Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.6
    • /
    • pp.569-576
    • /
    • 2011
  • Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.

Enhanced Spatial Covariance Matrix Estimation for Asynchronous Inter-Cell Interference Mitigation in MIMO-OFDMA System (3GPP LTE MIMO-OFDMA 시스템의 인접 셀 간섭 완화를 위한 개선된 Spatial Covariance Matrix 추정 기법)

  • Moon, Jong-Gun;Jang, Jun-Hee;Han, Jung-Su;Kim, Sung-Soo;Kim, Yong-Serk;Choi, Hyung-Jin
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.5C
    • /
    • pp.527-539
    • /
    • 2009
  • In this paper, we propose an asynchonous ICI (Inter-Cell Interference) mitigation techniques for 3GPP LTE MIMO-OFDMA down-link receiver. An increasing in symbol timing misalignments may occur relative to sychronous network as the result of BS (Base Station) timing differences. Such symbol synchronization errors that exceed the guard interval or the cyclic prefix duration may result in MAI (Multiple Access Interference) for other carriers. In particular, at the cell boundary, this MAI becomes a critical factor, leading to degraded channel throughput and severe asynchronous ICI. Hence, many researchers have investigated the interference mitigation method in the presence of asynchronous ICI and it appears that the knowledge of the SCM (Spatial Covariance Matrix) of the asynchronous ICI plus background noise is an important issue. Generally, it is assumed that the SCM estimated by using training symbols. However, it is difficult to measure the interference statistics for a long time and training symbol is also not appropriate for MIMO-OFDMA system such as LTE. Therefore, a noise reduction method is required to improve the estimation accuracy. Although the conventional time-domain low-pass type weighting method can be effective for noise reduction, it causes significant estimation error due to the spectral leakage in practical OFDM system. Therefore, we propose a time-domain sinc type weighing method which can not only reduce the noise effectively minimizing estimation error caused by the spectral leakage but also implement frequency-domain moving average filter easily. By using computer simulation, we show that the proposed method can provide up to 3dB SIR gain compared with the conventional method.

Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria (터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석)

  • Park, Kwang-Joon;Yun, Kyoung-Yeol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1073-1090
    • /
    • 2018
  • Since the domestic utility tunnels were built mainly in the development project of the new city, they are all in the form of cut-and-cover box tunnel. But, in the case of overseas construction of utility tunnels for existing urban areas, the bored tunnel types are mainly adopted. It is reasonable to install bored tunnels in a downtown area because it is difficult to block the roads or install bypass roads due to heavy traffic and civil complaints. In order to activate the utility tunnels in bored type, it is necessary to secure optimized cross-sectional design technology considering the optimal supplying capacity and mutual influencing factors (Thermal Interference, electrolytic corrosion, efficiency of the maintenance, etc.) of utilities (power cables, telecommunication cables, water pipes, etc.). The optimal cross-section design method for bored utility tunnels is ultimately to derive the optimal arrangement technique for the utilities. In order to develop the design methods, firstly, the cases of tunnel cross-section (Shield TBM, Conventional Tunneling) in overseas shall be investigated to analyze the characteristics of the installation of utilities in the section and installation of auxiliary facilities, It is necessary to sort out and analyze the criteria related to the inner cross-section design (arrangement) presented in the standards and guidelines.

The Origin of Korean Confucianism and Dongyi Culture - Discussion on the Theory of Professor Lew, Seung-Kook (한국유교의 기원과 동이문화(東夷文化) - 류승국 교수의 설을 논함 -)

  • Choi, Young Sung
    • The Journal of Korean Philosophical History
    • /
    • no.57
    • /
    • pp.31-55
    • /
    • 2018
  • Professor Dowon (道原) Lew, Seung-Kook (柳承國: 1923~2011) was a master of Eastern philosophy in Korea, in the 20th century. 'Confucianism' was the root of his discipline. Nevertheless he studied extensively throughout Eastern philosophy. He was also a pioneer of 'Korean Philosophy', who devoted himself to 'establishing the original form (原型) of Korean thought'. Professor Lew showed a unique view on how Confucian thought was formed. He has done many years of precise comparative analysis of the results of archaeological studies before 1970, particularly the study of bone-and-shell inions, and what was said in previous literature. As a result, he concluded that "we cannot discuss the origins of Confucian thought by separating the relationship with the Dongyi tribe". Confucianism was formed in relation to Dongyi. The purpose of his attention to the Dongyi tribe - RenFang tribe (人方族) was not to examine Dongyi tribe and its culture. His purpose was to examine how Confucian thought was formed and to examine the relevance of Dongyi tribe in this process. This was in conjunction with the task of exploring 'the original form of Korean thought', whether he pretended or not. Professor Lew, Seung-Kook's theory differed not only from the conventional view of the academic world in his time but also from the conventional view up to now. It is a pity that it was not yet discussed it in the academic world. I consider that it is necessary to seriously review Professor Lew and Seung-Kook's theory at this point when China has outlined the Northeast project (東北工程).

Quantification of the CO2 Footprint in Residential Construction

  • Don Mah;Juan D. Manrique;Haitao Yu;Mohamed Al-Hussein;Reza Nasseri
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.525-536
    • /
    • 2009
  • The current residential process adheres to a traditional method of construction involving wood framing on-site on poured concrete foundations which has been widely applied in North America. A conventional residential construction process can include seventeen distinct stages ranging from stake-out to pre-occupancy inspection. The current practice possesses short comings including high construction material wastes, long scheduling timelines, adverse weather conditions, poor quality, low efficiencies and negative environmental impacts from transportation and equipment use. Over CAN $5 billion dollars was spent in the construction sector during 2007 in Canada. Previous findings in CO2 emissions during the construction process of a conventional dwelling emphasize more than 45 tonnes of CO2 emissions. Hence, in Alberta alone during 2007, almost 50,000 residential units would release more than two million tonnes of CO2. These numbers demonstrate the economical and environmental impact in building construction and its relationship with CO2 emissions. The aim of this paper is to quantify the CO2 emissions from the current residential construction process in order to establish the baseline for CO2 emission reduction opportunities. The quantification collection methodology will be approached by identifying the seventeen various stages of construction and quantifying the contributions of CO2 from specific activities and their impacts of work for each stage. The approach of separating these into separate stages for collection will allow for independent opportunities for analysis from various independent contractors from the entire scope of work. The use of BIM will be implemented to efficiently quantify CO2 emissions. Based on the CO2 quantification baseline, emission reduction opportunities such as an industrialized construction process will be introduced that allows homebuilders to reduce the environmental and economical impact of home construction while enabling them to produce higher quality, more energy efficient homes in a safer and shorter period of time.

  • PDF

Performance and Economic Analysis for Rut-resistance Pavement Considering Life Cycle Cost (LCC를 고려한 내유동포장의 공용성 및 경제성 분석에 관한 연구)

  • Do, Myungsik;Han, Daeseok;Yoo, Inkyoon;Lee, Soohyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.783-796
    • /
    • 2006
  • Rut-resistance pavement is adopted to prevent pavement from plastic deformation since 1998. The objective of this paper is to investigate performance and economic efficiency between rut-resistance pavement and conventional hot-mix asphalt(HMA) on national highway. The pavement deterioration models incorporated in HDM-4 have been calibrated and adapted to local road conditions based on observed pavement rut-depth data. Based on calibration result of HDM-4, the economic evaluation including road agency cost and user cost is performed for 34 road pavement sections. Furthermore, we presented optimal timing for maintenance and performance levels subject to different budget. We found that rut-resistance pavement is performing better than conventional hot-mix asphalt in most road sections. Furthermore, we confirmed that the application of HDM-4 is useful for pavement project planning and evaluation. More investigation is needed to enlarge the scope of the pavement data and to explore more deeply socio-environmental cost and delay cost.