Kim, San-Hae;Yang, Mo-Chan;Lee, Je-Yeon;Shin, Yo-An
The Journal of Korean Institute of Communications and Information Sciences
/
v.35
no.6A
/
pp.555-567
/
2010
Unlike single-hop systems, multi-hop systems that use relay nodes assign a part of the overall resources to relay communications. If efficient resource allocation schemes are not adopted, this leads to a loss of resources. Moreover, because we may not be able to guarantee high-link performance due to the adjacent-cell interference in relay-based cellular systems, resource efficiency can be severely decreased. In this paper, we propose efficient resource allocation schemes for downlink relay-based networks in 3GPP (3rd Generation Partnership Project) LTE (Long Term Evolution)-Advanced systems. Unlike conventional schemes that have static resource regions for each data link, the proposed schemes dynamically allocate the resources of each link to resource blocks, by considering the channel state and the capacity of each link. We also propose resource overlapping schemes in which two different links overlap at the same resource region, so as to improve cell or user throughput performance. The proposed resource overlapping schemes do not require additional processes such as interference cancellation in users, thank to considering additional interference from resource overlapping in advance.
This paper reports on a realtime OS based master-slave configuration robot control system for laparoscopic surgery robot which enables telesurgery and overcomes shortcomings with conventional laparoscopic surgery. Surgery robot system requires control system that can process large volume information such as medical image data and video signal from endoscope in real-time manner, as well as precisely control the robot with high reliability. To meet the complex requirements, the use of high-level real-time OS (Operating System) in surgery robot controller is a must, which is as common as in many of modem robot controllers that adopt real-time OS as a base system software on which specific functional modules are implemened for more reliable and stable system. The control system consists of joint controllers, host controllers, and user interface units. The robot features a compact slave robot with 5 DOF (Degree-Of-Freedom) expanding the workspace of each tool and increasing the number of tools operating simultaneously. Each master, slave and Gill (Graphical User Interface) host runs a dedicated RTOS (Real-time OS), RTLinux-Pro (FSMLabs Inc., U.S.A.) on which functional modules such as motion control, communication, video signal integration and etc, are implemented, and all the hosts are in a gigabit Ethernet network for inter-host communication. Each master and slave controller set has a dedicated CAN (Controller Area Network) channel for control and monitoring signal communication with the joint controllers. Total 4 pairs of the master/slave manipulators as current are controlled by one host controller. The system showed satisfactory performance in both position control precision and master-slave motion synchronization in both bench test and animal experiment, and is now under further development for better safety and control fidelity for clinically applicable prototype.
Journal of the Institute of Electronics and Information Engineers
/
v.52
no.11
/
pp.3-11
/
2015
An advanced receiver which can manage inter-cell interference is required to cope with the explosively increasing mobile data traffic. 3rd Generation Partnership Project (3GPP) has discussed network assisted interference cancellation and suppression (NAICS) to improve signal-to-noise-plus-interference ratio (SINR) and receiver performance by suppression or cancellation of interference signal from inter-cells. In this paper, we propose the advanced receiver based on soft decision to reduce the interference from neighbor cell in LTE-Advanced downlink system. The proposed receiver can suppress and cancel the interference by calculating the unbiased estimation value of interference signal using minimum mean square error (MMSE) or interference rejection combing (IRC) receiver. The interference signal is updated using soft information expressed by log-likelihood ratio (LLR). We perform the system level simulation based on 20MHz bandwidth of 3GPP LTE-Advanced downlink system. Simulation results show that the proposed receiver can improve SINR, throughput, and spectral efficiency of conventional system.
Journal of the Microelectronics and Packaging Society
/
v.10
no.2
/
pp.1-5
/
2003
In this project, the efficiency of localized heating for micro systems packaging is developed by using a forced potential scheme microheater. Less than 0.2 Mpa contact pressure was used for bonding with a 200 mA current input for $50{\mu}m$ width, $2{\mu}m$ height and $8mm{\times}8mm$, $5mm{\times}5mm$, $3mm{\times}3mm$ sized phosphorus-doped poly-silicon microheater. The temperature can be raised at the bonding region to $800^{\circ}C$, and it was enough to achieve a strong and reliable bonding in 3 minutes. The IR camera test results show improved uniformity in heat distribution compared with conventional microheaters. For performing the gross leak check, IPA (Isopropanol Alcohol) was used. Since IPA has better wetability than water, it can easily penetrate small openings, and is more suitable for conducting a gross leak check. The pass ratio of bonded dies was 67%, for conventional localized heating, and 85% for our newly developed FP scheme. The bonding strength was more than 25Mpa for FP scheme packaging, which shows that FP scheme can be a good candidate for micro-scale hermetic packaging.
Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.29
no.6
/
pp.569-576
/
2011
Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.
The Journal of Korean Institute of Communications and Information Sciences
/
v.34
no.5C
/
pp.527-539
/
2009
In this paper, we propose an asynchonous ICI (Inter-Cell Interference) mitigation techniques for 3GPP LTE MIMO-OFDMA down-link receiver. An increasing in symbol timing misalignments may occur relative to sychronous network as the result of BS (Base Station) timing differences. Such symbol synchronization errors that exceed the guard interval or the cyclic prefix duration may result in MAI (Multiple Access Interference) for other carriers. In particular, at the cell boundary, this MAI becomes a critical factor, leading to degraded channel throughput and severe asynchronous ICI. Hence, many researchers have investigated the interference mitigation method in the presence of asynchronous ICI and it appears that the knowledge of the SCM (Spatial Covariance Matrix) of the asynchronous ICI plus background noise is an important issue. Generally, it is assumed that the SCM estimated by using training symbols. However, it is difficult to measure the interference statistics for a long time and training symbol is also not appropriate for MIMO-OFDMA system such as LTE. Therefore, a noise reduction method is required to improve the estimation accuracy. Although the conventional time-domain low-pass type weighting method can be effective for noise reduction, it causes significant estimation error due to the spectral leakage in practical OFDM system. Therefore, we propose a time-domain sinc type weighing method which can not only reduce the noise effectively minimizing estimation error caused by the spectral leakage but also implement frequency-domain moving average filter easily. By using computer simulation, we show that the proposed method can provide up to 3dB SIR gain compared with the conventional method.
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.6
/
pp.1073-1090
/
2018
Since the domestic utility tunnels were built mainly in the development project of the new city, they are all in the form of cut-and-cover box tunnel. But, in the case of overseas construction of utility tunnels for existing urban areas, the bored tunnel types are mainly adopted. It is reasonable to install bored tunnels in a downtown area because it is difficult to block the roads or install bypass roads due to heavy traffic and civil complaints. In order to activate the utility tunnels in bored type, it is necessary to secure optimized cross-sectional design technology considering the optimal supplying capacity and mutual influencing factors (Thermal Interference, electrolytic corrosion, efficiency of the maintenance, etc.) of utilities (power cables, telecommunication cables, water pipes, etc.). The optimal cross-section design method for bored utility tunnels is ultimately to derive the optimal arrangement technique for the utilities. In order to develop the design methods, firstly, the cases of tunnel cross-section (Shield TBM, Conventional Tunneling) in overseas shall be investigated to analyze the characteristics of the installation of utilities in the section and installation of auxiliary facilities, It is necessary to sort out and analyze the criteria related to the inner cross-section design (arrangement) presented in the standards and guidelines.
Professor Dowon (道原) Lew, Seung-Kook (柳承國: 1923~2011) was a master of Eastern philosophy in Korea, in the 20th century. 'Confucianism' was the root of his discipline. Nevertheless he studied extensively throughout Eastern philosophy. He was also a pioneer of 'Korean Philosophy', who devoted himself to 'establishing the original form (原型) of Korean thought'. Professor Lew showed a unique view on how Confucian thought was formed. He has done many years of precise comparative analysis of the results of archaeological studies before 1970, particularly the study of bone-and-shell inions, and what was said in previous literature. As a result, he concluded that "we cannot discuss the origins of Confucian thought by separating the relationship with the Dongyi tribe". Confucianism was formed in relation to Dongyi. The purpose of his attention to the Dongyi tribe - RenFang tribe (人方族) was not to examine Dongyi tribe and its culture. His purpose was to examine how Confucian thought was formed and to examine the relevance of Dongyi tribe in this process. This was in conjunction with the task of exploring 'the original form of Korean thought', whether he pretended or not. Professor Lew, Seung-Kook's theory differed not only from the conventional view of the academic world in his time but also from the conventional view up to now. It is a pity that it was not yet discussed it in the academic world. I consider that it is necessary to seriously review Professor Lew and Seung-Kook's theory at this point when China has outlined the Northeast project (東北工程).
Don Mah;Juan D. Manrique;Haitao Yu;Mohamed Al-Hussein;Reza Nasseri
International conference on construction engineering and project management
/
2009.05a
/
pp.525-536
/
2009
The current residential process adheres to a traditional method of construction involving wood framing on-site on poured concrete foundations which has been widely applied in North America. A conventional residential construction process can include seventeen distinct stages ranging from stake-out to pre-occupancy inspection. The current practice possesses short comings including high construction material wastes, long scheduling timelines, adverse weather conditions, poor quality, low efficiencies and negative environmental impacts from transportation and equipment use. Over CAN $5 billion dollars was spent in the construction sector during 2007 in Canada. Previous findings in CO2 emissions during the construction process of a conventional dwelling emphasize more than 45 tonnes of CO2 emissions. Hence, in Alberta alone during 2007, almost 50,000 residential units would release more than two million tonnes of CO2. These numbers demonstrate the economical and environmental impact in building construction and its relationship with CO2 emissions. The aim of this paper is to quantify the CO2 emissions from the current residential construction process in order to establish the baseline for CO2 emission reduction opportunities. The quantification collection methodology will be approached by identifying the seventeen various stages of construction and quantifying the contributions of CO2 from specific activities and their impacts of work for each stage. The approach of separating these into separate stages for collection will allow for independent opportunities for analysis from various independent contractors from the entire scope of work. The use of BIM will be implemented to efficiently quantify CO2 emissions. Based on the CO2 quantification baseline, emission reduction opportunities such as an industrialized construction process will be introduced that allows homebuilders to reduce the environmental and economical impact of home construction while enabling them to produce higher quality, more energy efficient homes in a safer and shorter period of time.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.5D
/
pp.783-796
/
2006
Rut-resistance pavement is adopted to prevent pavement from plastic deformation since 1998. The objective of this paper is to investigate performance and economic efficiency between rut-resistance pavement and conventional hot-mix asphalt(HMA) on national highway. The pavement deterioration models incorporated in HDM-4 have been calibrated and adapted to local road conditions based on observed pavement rut-depth data. Based on calibration result of HDM-4, the economic evaluation including road agency cost and user cost is performed for 34 road pavement sections. Furthermore, we presented optimal timing for maintenance and performance levels subject to different budget. We found that rut-resistance pavement is performing better than conventional hot-mix asphalt in most road sections. Furthermore, we confirmed that the application of HDM-4 is useful for pavement project planning and evaluation. More investigation is needed to enlarge the scope of the pavement data and to explore more deeply socio-environmental cost and delay cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.