• Title/Summary/Keyword: Control Blasting

Search Result 159, Processing Time 0.023 seconds

Case Study of Blasting Vibration and Noise in Public Resentment Area (민원발생시 발파진동.소음의 처리사례에 관한 연구)

  • 안명석;최영천;박종남;목연수
    • Explosives and Blasting
    • /
    • v.17 no.3
    • /
    • pp.13-22
    • /
    • 1999
  • It Is indispensible to cause vibration, noise and dust to blasting and breaker operations. Since the control of these factors is supposed to be extremely difficult, the claim of compensation for material and mental damages are getting increased. Economically feasible blasting operation with controlling vibration and noise can be achieved by establishment of science-based plan, accurate operation and responsible inspection, and the application of efficient management system. It must also be remarked that the relevant applied without prejudice by the operator, and the law and regulation should be applied without prejudice by the authority concerned. In addition, the public claim against operators should be investigated in detail and the prosecution should be made under the careful onside-ration of scientific and reasonable conception. Finally, it is strongly suggested that the operations, public and authorities should make great efforts to develop higher technology in order to expand our construction market, to overseas.

  • PDF

An Analytic Hierarchy Process on the Cause of Gun Powder Blasting Accicdent (화약류 발파사고원인의 AHP기법에 의한 분석)

  • 서승록;이정훈
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.3
    • /
    • pp.120-125
    • /
    • 2003
  • This research analyzes blasting accident cause that is happening construction and engineering works spot taking advantage of AHP (Analytic Hierarchy Process) techniques as metrical. Result that apply AHP with blasting accident that is happened the South Korea and Japan, appeared by thing which relative importance by human cause is highest. Specially, it is observance of safety rule that dominate the highest ratio among of human cause, and if observe a little, causes that prevention is possible are much. By result of this research, necessity of safety education is important first of all for prevention of blasting accident. Also, thorough safety control plan of during work and enough on-the-slut probe before work should be established. Because explosives uses gunpowder and explosive high energy, work by qualified person is essential. Ant it may become help to minimize dissipation of important life and property preventing beforehand explosion accident of gunpowder.

Case study on the Distributed Multi-stage Blasting using Stemming-Help Plastic Sheet and Programmable Sequential Blasting Machine (전색보호판과 다단발파기를 이용한 다단식분산발파의 현장 적용 사례)

  • Kim, Se-Won;Lim, Ick-Hwan;Kim, Jae-Sung
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.14-24
    • /
    • 2013
  • The most effective way of the rock removing works in the downtown area is to removing rocks by splitting the rock by blasting with small amount of explosives in the hole. However environmental factors not only limit the applications but also increase the forbidden area. As this is a distributed multi-stage blasting method and to reduce vibration by applying the optimized precisioncontrol-blasting method, it is applicable in all situations. The process is to fix the stemming-help plastic sheet to the hole entrance when stemming explosives and insert detonator and explosive primer with same delay time, two or three sets. This method is more efficient in the downtown area where claims and dispute from vibration are expected. This method is easily usable by designing blast pattern even in the area where delay time blasting is difficult after multi-stage explosive stemming due to short length of blast hole (1.2~3.0m) and there is no detonator wire shortage or dead-pressure.

Review of Applicability of the Standard Blasting Patterns of MLTM to Various Rock Types (국토해양부 표준발파패턴의 셰일암반 적용성에 관한 사례 연구)

  • Kim, Se-Hyun
    • Explosives and Blasting
    • /
    • v.27 no.1
    • /
    • pp.47-52
    • /
    • 2009
  • Blasting is necessary for excavation processes since more than 70% of korean land is consist of mountains. The vibration and noise accompanied by blasting processes usually bring about public complaints. Blasting patterns are chosen by economical efficiency, stability and construction conveniency. However, there are many alternatives without control to settle the popular complaint. To prevent those alternatives, standard blasting method for design and construction were suggested by MLTM (Ministry of Land, Transport and Maritime Affairs) in 2006. However, standard blasting pattern of MLTM was designed in a lump irrespective of types of rocks. Economical loss may occur by ignoring the characteristics of rocks for the applications to the rocks with low intensity, such as shale, or containing many joint. We deduced some economical progresses by performing test blasting with adjusted drilling spacing and length of burden considering the characteristics of local rock. This paper suggests the start of case studies for different applications. Economic improvement can be expected by applying those results deduced from case studies to design and construction.

Experimental Study of Fracture Control Blasting Using the Split Tube (Split tube를 이용한 균열 제어발파 현장 실험)

  • 백승규;류창하;선우춘;최병희;김재동
    • Explosives and Blasting
    • /
    • v.19 no.4
    • /
    • pp.5-10
    • /
    • 2001
  • 발파시 공벽 주변에서 방사상으로 발생하는 무수한 균열들을 제어하고 일정한 방향으로 절단면을 형성하기 위해서 split tube를 이용한 발파 방법에 대한 현장 실험을 실시하였다. 현장 실험결과 절단면을 발달시키고자 하는 방향으로 제어할 수 있었다. 계산에 의한 발파압력과 제어된 균열면의 길이를 비교하였다. 현장 벤치 벽면에서 에멀젼 계열 폭약의 발파 압력이 700㎫이상일 경우 균열을 원하는 방향으루 제어할 수 있었을 뿐만 아니라, 공경의 30배까지 균열이 전파되었다.

  • PDF

A Case Study of Tunnel Electronic Blasting to Control Vibration in the Proximity of the Safety Facilities (근접 보안물건의 진동제어를 위한 터널 전자발파 시공사례)

  • Seo, Yun-Sik;Woo, Sang-Don;Kwon, Yeong-Bok;Kim, Jong-Su;Choi, Hyeong-Bin;Kim, Seon-Hong;Kim, Gab-Soo;Kim, Jae-Hoon;Kim, Hee-Do;Lee, Jun-Won
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.37-51
    • /
    • 2012
  • In this case of "Seongnam~Yeoju double-lanes railroad construction", there were safety facilities which were concerned about damages from vibration and noise. In the project design stage, the rock-splitter method was designed to prevent them. The electronic blasting was considered to improve construction speed and economic value as an alternative tunnelling method, complying with the site's vibration criteria(cowhouse : 0.09cm/sec, residence : 0.2cm/sec). In the environment evaluation report of the eDev, tunnel electronic blasting systems, the blasting pollutions can be managed by the electronic blasting method. The results were successfully conducted with high speed construction without any damages to adjacent facilities.

Establishing a Standard Work Guideline for Safe Blasting (발파작업 표준 안전작업지침에 대한 개선안)

  • Kim, Hee-Do;Lee, Joon-Won
    • Explosives and Blasting
    • /
    • v.32 no.1
    • /
    • pp.23-30
    • /
    • 2014
  • The overall management for explosives in domestic and regulation for blasting is managed by the control Act of guns, sword, explosives etc. On the details for handling and method, delivery, storage, use and management for explosives and work safety for the accident prevention is recommended to the related business site through Standard safety work guideline of blasting which set by safety & health 27 Act handling. In this study, It reviews the standard safety work guideline of blasting notified by Ministry of employment & labor. We propose the new products introduced into domestic explosives market, definition of explosives word when the newest blasting technology is revised, emulsion explosives, bulk explosives and electronic detonators which increased in the latest. Indeed, We propose a typical handling method of non-electric detonator and electronic in order to make the renewed Standard safety work guideline of Blasting on work guideline.

A Study on the Prediction & Transformation of Blasting Noise for Environmental Regulation Standard (발파소음의 예측기법과 환경규제 기준으로의 변환 연구)

  • 김남수;양형식
    • Explosives and Blasting
    • /
    • v.18 no.2
    • /
    • pp.14-22
    • /
    • 2000
  • The estimation of proper prediction method and the alteration of transformation method of environmental regulation standard were carried out by measuring blasting noise in construction field. The correlation of scaled distance with sound pressure level were better than with sound level, but it was proved to be difficult to control blasting noise because the correlation factor was too 1ow. three methods to transform sound pressure levee to sound level were examined. The method is the transformation by correlation equation of sound pressure level and sound level which are measured at the same time, and simplified transformation of A-weighting network corresponding to dominant frequency, and the transformation of sound pressure level by FFT. There were many errors to transform. The best effective method is the transformation using correlation equation of sound pressure level and sound level which are measured at the same time.

  • PDF

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.

Detonating Cord as a Controllable Source for Scaled Model Blasting Test (축소모형실험 폭원으로서 도폭선의 폭력조절)

  • Yang, Hyung-Sik;Kim, Jong-Gwan;Choi, Mi-Jin;Choi, Byung-Hee;Ryu, Chang-Ha
    • Tunnel and Underground Space
    • /
    • v.17 no.4
    • /
    • pp.295-300
    • /
    • 2007
  • A method using detonating cord was suggested to control the blasting source for scaled model test. Blasting of 5 concrete block was carried out to verify the method. It was proved that blasting power can be controlled by suggested method. It seemed to be reasonable to use the reduction ratio based on the explosion heat.