• Title/Summary/Keyword: Continuous Sampling Plans

Search Result 12, Processing Time 0.027 seconds

Revised KS Standards for Acceptance Sampling By Attribute Based On Continuous Sampling Plan (CSP를 응용한 연속생산형 계수이산 샘플링 검사)

  • Choi, Sung-Oon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.161-165
    • /
    • 2008
  • This paper introduces three continuous sampling plans by attribute. Revised KS standards for acceptance samplings such as KSA ISO 2859-3, 4 : 2001 and 21247 : 2007 are presented. These plans are based on skip-lot, DQL(Declared Quality Level) and VL (Verification Level).

  • PDF

Continuous Sampling Plans with Prior Distribution (불량율(不良率)의 사전분포(事前分布)를 고려(考慮)한 연속생산형(連續生産型) 샘플링검사(檢査))

  • Yun, Wan-Cheol;Bae, Do-Seon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.5 no.1
    • /
    • pp.53-57
    • /
    • 1979
  • The concept of AOQL in designing Dodge's continuous sampling plans is modified to include probabilistic consideration reflecting the prior knowledge about the process average fraction defectives, and a new design criterion called AOQL, which eliminates some of the drawbacks of the AOQL criterion is proposed. AOQL, approach provides more economical sampling plans in many cases, and can be used even when only limited amount of prior information is available.

  • PDF

Modified Two-Level Skip-Lot Sampling Plans (수정된 2단계 스킾-로트 샘플링 검사계획)

  • 최병철;천영민
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.1
    • /
    • pp.113-127
    • /
    • 2001
  • Skip-lot sampling plans for lot-by-lot inspection are more desirable than the continuous sampling plans for units in modern mass production system under the condition of the submitted product is good. Perry(1973a, 1973b) extended the Dodge(1955)′s skip-lot sampling plans to single and two-level skip-lot sampling plans and Parker & Kessler (1981) modified Perry(1973a)′s plans so that a sample of size one is taken from every lot skipped during the skipping mode. In this paper, Perry(1973b)′s two-level skip-lot sampling plans are modified by applying Parker & Kessler′s plan, designated as MTSkSP1, MTSkSP2, MTSkSP3. Operating characteristic(OC) functions, average sample numbers(ASN) and average outgoing qualities(AOQ) for the proposed plans are derived using Markov chain properties and compared each other and Perry′s plans. The proposed plans not only reduce the ASN but also avoid the danger skipping lots entirely when the lots are produced during sudden "out-of-control".

  • PDF

Continuous Sampling Plans Based on AFI Curve (연속생산형(連續生産型)샘플링검사방식(檢査方式)의 선정(選定)에 관하여)

  • Bae, Do-Seon;Jang, Jung-Sun;Eom, Ju-Tae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.8 no.2
    • /
    • pp.23-31
    • /
    • 1982
  • A method of selecting parameters of Dodge-type continuous camping plans is proposed ; a sampling plan is designed so that its AFI curve passes through two designated points. AOQL contour lines are also drawn which can be used as a reference in choosing these points.

  • PDF

Practical Limitations of Theoretical Acceptance Sampling (이론 샘플링 검사의 실무적 한계)

  • Choe, Seong-Un
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.205-211
    • /
    • 2011
  • The papaer reviews four theoretical acceptance sampling plans as OC(Operating Characteristics) curve based inspection, rectifying inspection, switching inspection, and continuous inspection. In addition, the study presents practical limitations of theoretical acceptance sampling by attribute and by variable. Finally, following research also recommends the sampling inspection based on production technology. However, the inspection method requires quality expertise with various experience and implicit knowledge of the field.

  • PDF

An Approach to select the lowest cost CSP-1 sampling plan(i, f) (최소비용(最小費用) 연속생산형(連續生産型) 샘플링검사(檢査)의 탐색(探索))

  • Jang, Gyeong;Sin, Hyeon-Jae
    • Journal of Korean Society for Quality Management
    • /
    • v.11 no.1
    • /
    • pp.18-23
    • /
    • 1983
  • Continuous sampling plans CSP-1(i,f)'s with which AOQL is guaranteed, can be applied to the cases in need of effective sampling without stopping the process or dividing batches during production. But the plans that can guarantee the same AOQL value are too many. Therefore we have to select one plan among them. There may be a lot of ways to choose it. This paper connects with various sampling costs, the concept to try to detect the shift of process average under fractional inspection in CSP-1,to find a minimum cost sampling plan among several CSP-1 sampling plan alternatives (i, f)'s with the same AOQL value.

  • PDF

Design of Screening Procedures Using a Surrogate Variable with Specified Producer's and Consumer's Risks (대용특성을 활용한 규준형 스크리닝 절차의 설계)

  • Hong, Sung-Hoon;Jung, Min-Young
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2009.10a
    • /
    • pp.3-10
    • /
    • 2009
  • When the measurement method for a performance variable is destructive or expensive, it is profitable to replace the performance variable with a highly correlated surrogate variable. In this paper we propose screening procedures using a surrogate variable with specified producer's and consumer's risks. Blending the basic concepts of acceptance sampling plans and screening procedures, the proposed model can be used effectively by quality professionals. Two models are considered: the normal model with dichotomous performance and continuous surrogate variables, and the bivariate normal model with continuous performance and surrogate variables. It is assumed the surrogate variable given the performance variable is normally distributed in the normal model, and performance and surrogate variables are jointly normally distributed in the bivariate normal model. For the two models, Producer's and consumer's risks are derived, and methods of finding the optimal screening procedures are presented. Numerical examples are also given.

  • PDF

Design of Screening Procedures Using a Surrogate Variable with Specified Producer's and Consumer's Risks (대용특성을 활용한 규준형 스크리닝 절차의 설계)

  • Hong, Sung-Hoon;Jung, Min-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.37 no.4
    • /
    • pp.23-30
    • /
    • 2009
  • When the measurement method for a performance variable is destructive or expensive, it is profitable to replace the performance variable with a highly correlated surrogate variable. In this paper we propose screening procedures using a surrogate variable with specified producer's and consumer's risks. Blending the basic concepts of acceptance sampling plans and screening procedures, the proposed model can be used effectively by quality professionals. Two models are considered: the normal model with dichotomous performance and continuous surrogate variables, and the bivariate normal model with continuous performance and surrogate variables. It is assumed the surrogate variable given the performance variable is normally distributed in the normal model, and performance and surrogate variables are jointly normally distributed in the bivariate normal model. For the two models, producer's and consumer's risks are derived, and methods of finding the optimal screening procedures are presented. Numerical examples are also given.

Application of Multi-Dimensional Precipitation Models to the Sampling Error Problem (관측오차문제에 대한 다차원 강우모형의 적용)

  • Yu, Cheol-Sang
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.5
    • /
    • pp.441-447
    • /
    • 1997
  • Rainfall observation using rain gage network or satellites includes the sampling error depending on the observation methods or plans. For example, the sampling using rain gages is continuous in time but discontinuous in space, which is nothing but the source of the sampling error. The sampling using satellites is the reverse case that continuous in space and discontinuous in time. The sampling error may be quantified by use of the temporal-spatial characteristics of rainfall and the sampling design. One of recent works on this problem was done by North and Nakamoto (1989), who derived a formulation for estimating the sampling error based on the temporal-spatial rainfall spectrum and the design scheme. The formula enables us to design an optimal rain gage network or a satellite operation plan providing the statistical characteristics of rainfall. In this paper the formula is reviewed and applied for the sampling error problems using several multi-dimensional precipitation models. The results show the limitation of the formulation, which cannot distinguish the model difference in case the model parameters can reproduce similar second order statistics of rainfall. The limitation can be improved by developing a new way to consider the higher order statistics, and eventually the probability density function (PDF) of rainfall.

  • PDF

The Average Outgoing Quality of CSP's for Markov-Dependent Production Processes in Short Production Runs (마코프종속(從屬)인 생산공정의 운영기간(運營期間)에 따른 연속생산형(連續生産型) 샘플링 검사방식의 평균출검품질(平均出檢品質))

  • Park, Heung-Seon;Kim, Seong-In
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.15 no.1
    • /
    • pp.89-103
    • /
    • 1989
  • In this paper the approximate average outgoing quality and properties of a class of continuous sampling plans in a short production run are investigated when the quality of successive units follows a two-state time-homogeneous Markov chain. The results of previous studies can be obtained as special cases. It is observed that the long-run average outgoing quality limit values under the statistical control differ significantly as compared to the case of short production runs in a Markov-dependent production process.

  • PDF