• Title/Summary/Keyword: Continuous Power Supply

Search Result 175, Processing Time 0.027 seconds

A 9 mW Highly-Digitized 802.15.4 Receiver Using Bandpass ∑Δ ADC and IF Level Detection

  • Kwon, Yong-Il;Park, Ta-Joon;Lee, Hai-Young
    • Journal of electromagnetic engineering and science
    • /
    • v.8 no.2
    • /
    • pp.76-83
    • /
    • 2008
  • A low power(9 mW) highly-digitized 2.4 GHz receiver for sensor network applications(IEEE 802.15.4 LR-WPAN) is realized by a $0.18{\mu}m$ CMOS process. We adopted a novel receiver architecture adding an intermediate frequency (IF) level detection scheme to a low-power complex fifth-order continuous-time(CT) bandpass L:tl modulator in order to digitalize the receiver. By the continuous-time bandpass architecture, the proposed $\Sigma\Delta$ modulator requires no additional anti-aliasing filter in front of the modulator. Using the IF detector, the achieved dynamic range(DR) of the over-all system is 95 dB at a sampling rate of 64 MHz. This modulator has a bandwidth of 2 MHz centered at 2 MHz. The power consumption of this receiver is 9.0 mW with a 1.8 V power supply.

Development of the method for optimal water supply pump operation considering disinfection performance (소독능을 고려한 송수펌프 최적운영기법 개발)

  • Hyung, Jinseok;Kim, Kibum;Seo, Jeewon;Kim, Taehyeon;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.32 no.5
    • /
    • pp.421-434
    • /
    • 2018
  • Water supply/intake pumps operation use 70~80% of power costs in water treatment plants. In the water treatment plant, seasonal and hourly differential electricity rates are applied, so proper pump scheduling can yield power cost savings. Accordingly, the purpose of this study was to develop an optimal water supply pump scheduling scheme. An optimal operation method of water supply pumps by using genetic algorithm was developed. Also, a method to minimize power cost for water supply pump operation based on pump performance derived from the thermodynamic pump efficiency measurement method was proposed. Water level constraints to provide sufficient disinfection performance in a clearwell and reservoirs were calibrated. In addition, continuous operation time constraints were calibrated to prevent frequent pump switching. As a result of optimization, savings ratios during 7 days in winter and summer were 4.5% and 5.1%, respectively. In this study, the method for optimal water pump operation was developed to secure disinfection performance in the clearwell and to save power cost. It is expected that it will be used as a more advanced optimal water pump operation method through further studies such as water demand forecasting and efficiency according to pump combination.

Crankshaft Bearing Design Adapting Continuous Oil Supply System (연속오일공급 형태의 크랭크샤프트 베어링 설계)

  • Yun Jeong-Eui
    • Tribology and Lubricants
    • /
    • v.20 no.2
    • /
    • pp.84-90
    • /
    • 2004
  • It is very important to improve the durability and reliability of crankshaft because of conflicting demands for lower fuel consumption and higher power output. In this study, for the crankshaft bearing design, analyses were conducted to determine the lubrication characteristics such as oil flow rate, minimum oil film thickness, friction force and increase of oil temperature at main bearing and connecting rod bearing. Additionally, supplied oil pressure and temperature effects on the bearings were simulated to figure out lubrication characteristics on the bearings. Finally the effects of increasing the bearing width and clearance were introduced on the lubrication characteristics.

Direct Single-stage Power Converter with Power Factor Improvement for Switched Mode Power Supply

  • Kalpana, R.;Singh, Bhim;Bhuvaneswari, G.
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.3
    • /
    • pp.468-476
    • /
    • 2010
  • This paper presents a direct single-stage power converter using single-phase isolated full-bridge converter modules, with inherent power factor correction (PFC) for a 12 kW switched mode power supply (SMPS). The advantages of the proposed converter are its simple control strategy, reduction in number of conversion stage, low input line current harmonics, and improvement in power factor. Analysis of the single-stage converter is carried out in continuous conduction mode of operation. Steady-state analysis of the proposed converter is conducted to obtain converter parameters. A systematic design procedure is also presented for a 12k W converter with a design example. The effect of load variation on SMPS is also studied in order to demonstrate the effectiveness of the proposed converter for the complete range of load conditions. A set of power quality indices on input ac mains for an SMPS fed from a single-stage converter is also presented for easy comparison of their performance.

Detection and Diagnosis of Power Distribution Supply Facilities Using Thermal Images (열화상 이미지를 이용한 배전 설비 검출 및 진단)

  • Kim, Joo-Sik;Choi, Kyu-Nam;Lee, Hyung-Geun;Kang, Sung-Woo
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.1
    • /
    • pp.1-8
    • /
    • 2020
  • Maintenance of power distribution facilities is a significant subject in the power supplies. Fault caused by deterioration in power distribution facilities may damage the entire power distribution system. However, current methods of diagnosing power distribution facilities have been manually diagnosed by the human inspector, resulting in continuous pole accidents. In order to improve the existing diagnostic methods, a thermal image analysis model is proposed in this work. Using a thermal image technique in diagnosis field is emerging in the various engineering field due to its non-contact, safe, and highly reliable energy detection technology. Deep learning object detection algorithms are trained with thermal images of a power distribution facility in order to automatically analyze its irregular energy status, hereby efficiently preventing fault of the system. The detected object is diagnosed through a thermal intensity area analysis. The proposed model in this work resulted 82% of accuracy of detecting an actual distribution system by analyzing more than 16,000 images of its thermal images.

Analysis of Interleaved Boost Power Factor Corrector (Interleaved 승압형 역률보상 컨버터의 해석)

  • Heo, Tae-Won;Park, Jee-Ho;Roh, Tae-Kyun;Chung, Jae-Lyoun;Kim, Dong-Wan;Woo, Jung-In
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.51 no.4
    • /
    • pp.186-192
    • /
    • 2002
  • In this paper, interleaved boost power factor corrector(IBPFC) is applied as a pre-regulator in switch mode power supply. IBPFC can reduce input current ripple and effectively increase the switching frequency without increasing the switching losses, because input current is divided each 50% by two switching devices. IBPFC can be classified as three cases by duty ratio condition in continuous current mode and be carried out state space average modeling. According to the modeling, steady and transient state analysis is performed by steady elements and perturbation element. Control transfer function is derived for design of control system.

The Design and Implementation of Inverter Power Supply with FGS for Sulfur Lamp (FGS를 이용한 황전등 전원장치의 설계 및 구현)

  • Jeong, Won-Geun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.3
    • /
    • pp.10-16
    • /
    • 2005
  • This paper suggested the sulfur lamp power supply using Fuzzy Gain Scheduling(FGS), which was designed and confirmed the performance through manufacturing. it was based on Series Resonant Half Bridge Inverter(SRHBI), so that was applied Pulse Frequency Modulation(PFM), Zero Voltage Switching(ZVS), soft switching and soft start for input power variation and output power compensation. In order to get the lengthened life time of magnetron and stabilized output or power, power ratter and efficiency were improved by fuzzy gain algorism. It also made it possible to get not the existing foxed output power but continuous variable output power$(900\~1250[W])$. The manufactured power supply showed good results in input power $220[V]{\pm}15[\%]$ with stabilized output of power, luminous efficiency 97[1m/W] and power factor $96[\%]$.

Design and Evaluation of the Internet-Of-Small-Things Prototype Powered by a Solar Panel Integrated with a Supercapacitor

  • Park, Sangsoo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.11
    • /
    • pp.11-19
    • /
    • 2021
  • In this paper, we propose a prototype platform combined with the power management system using, as an auxiliary power storage device, a supercapacitor that can be fast charged and discharged with high power efficiency as well as semi-permanent charge and discharge cycle life. For the proposed platform, we designed a technique which is capable of detecting the state of power cutoff or resumption of power supplied from the solar panel in accordance with physical environment changes through an interrupt attached to the micro-controller was developed. To prevent data loss in a computing environment in which continuous power supply is not guaranteed, we implemented a low-level system software in the micro-controller to transfer program context and data in volatile memory to nonvolatile memory when power supply is cut off. Experimental results shows that supercapacitors effectively supply temporary power as auxiliary power storage devices. Various benchmarks also confirm that power state detection and transfer of program context and data from volatile memory to nonvolatile memory have low overhead.

The policy study on the power grid operation strategy of new and renewable energy combined generation system (도서지역의 신재생에너지복합발전 전력계통 운영방안에 관한 정책연구)

  • Kim, Eui Hwan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.109.1-109.1
    • /
    • 2011
  • KEPCO was operating power plants with diesel generators in 49 islands including Baekryeong-Do, and the generation capacity was about 66 MW in 2008. The cost of fuel is increasing by the international oil price inflation and continuous rise of oil price is predicted. For the stabilizing of electric power supply to the separate islands, renewable energy and fuel cell systems were considered. Hydrogen is made using renewable energy such as wind power and solar energy, and then a fuel cell system generates electricity with the stored hydrogen. Though the system efficiency is low, it is treated as the only way to secure the stable electric supply using renewable energy at this present. The analytic hierarchy process was used to select suitable candidate island for the system installation and 5 islands including Ulleung-Do were selected. Economic evaluation for the system composed of a kerosene generator, a wind power, an electrolysis, and a fuel cell system was conducted with levelized generation cost based on present value methode. As the result, the necessity of renewable energy combined generation system and micro grid composition in the candidated islands was confirmed. Henceforth, the development of an integration technology which connects micro grid to the total power grid will be needed.

  • PDF

Research on Line Overload Emergency Control Strategy Based on the Source-Load Synergy Coefficient

  • Ma, Jing;Kang, Wenbo;Thorp, James S.
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1079-1088
    • /
    • 2018
  • A line overload emergency control strategy based on the source-load synergy coefficient is proposed in this paper. First, the definition of the source-load synergy coefficient is introduced. When line overload is detected, the source-load branch synergy coefficient and source-load distribution synergy coefficient are calculated according to the real-time operation mode of the system. Second, the generator tripping and load shedding control node set is determined according to the source-load branch synergy coefficient. And then, according to the line overload condition, the control quantity of each control node is determined using the Double Fitness Particle Swarm Optimization (DFPSO), with minimum system economic loss as the objective function. Thus load shedding for the overloaded line could be realized. On this basis, in order to guarantee continuous and reliable power supply, on the condition that no new line overload is caused, some of the untripped generators are selected according to the source-load distribution synergy coefficient to increase power output. Thus power supply could be restored to some of the shedded loads, and the economic loss caused by emergency control could be minimized. Simulation tests on the IEEE 10-machine 39-bus system verify the effectiveness and feasibility of the proposed strategy.