• 제목/요약/키워드: Contingency plan

검색결과 67건 처리시간 0.024초

무인 경량전철 운영을 위한 비상대응 계획 수립에 관한 연구 (A Study on Emergency Response Plan for Manless Light Rail Transit(LRT))

  • 박민규;신종현;김연웅
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.915-923
    • /
    • 2011
  • Our country is promoting the introduction of new means of transportation due to insufficient supply according to the existing demand of road traffic. Among them, manless light railroad transit is settled down as the most definite alternative. However, new traffic systems such as manless light railroad have certain difference between characteristics of hardware and software and subway system. Therefore, there will be many differences compared to the existing contingency system when accidents occur. Railway management organization has to establish railway contingency plan and acquire permission from the minister of the Ministry of Land, Transport, and Maritime Affairs. However, as commercial transportation is available, a new traffic system also should establish contingency plan. Therefore, the establishment of systematic contingency plan is suggested in order to analyze characteristics of manless light railroad in the beginning of introduction and to make contingency response available.

  • PDF

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

상정사고를 고려한 배전용 변전소 신,증설 계획 수립 (Planning for Construction and Expanding of Distribution Substation Considering Contingency)

  • 최상봉;김대경;정성환
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권7호
    • /
    • pp.303-308
    • /
    • 2001
  • This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of substation bank system. In this paper, firstly, proper sphere of supply area by each district which could be standardized with respect to its supply capacity is established under assumption of long term load forecasting. Secondly, goal of utilization ratio based on configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents. Finally, it is set up for optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio. To verify proposed algorithm, at first, after adopting a part of Kangnam area in Seoul as area for testing, it is divided into several regions for this area according to power branches of power utility. Secondly, by deriving correlation factor between load demand and economic indicators in these region respectively, the regional load forecasting was performed with economic growth and city plan scenario. Finally, based on the predicted load demand by region and land use data which is identified from air-photographic, the load demand by district was predicted. Also, planning for substation considering contingency is formulated to expand taking into account computing utilization factor which is based on configuration of substation bank respectively.

  • PDF

재건축연한 증가에 따른 공동주택 관리방법 개선에 관한 연구 (장기수선계획 및 장기수선충당금 실태조사를 중심으로) (A Study of Improving Apartment Estate Management Method in Relation to Expanding of Reconstruction Period by Law)

  • 박병규;조태제
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.141-148
    • /
    • 2005
  • This study as a demand of reconstruction allows the longevity of the multi complex, analyze the problems and solutions for a long term maintenance planning scheme, and how to save contingency fund to utilize. The major role of the multi complex housing market reflects Positively on our valuable society, provides a better life of environment on top of longevity and for the superior living duality. For a achievement and improvement existing long term maintenance Plan and contingency fund system should be considered as follows. First, shall be expanded more units of house as smaller group. Second, advice from expert shall be reconsidered, eliminated, and protected reorganizing an informal reconstruction planning comparatively legal procedure must be renegotiated and pursued. Third, the fund which saved for the contingency has to clarified as tax free item by government. It's not only mistreated as a limitation of personal asset but also treated as national source Despite of rather compulsive and constructive method must be noticed by whoever owns for, more positive follows, promotion and directing must be able to guide its understanding and adherence of importance and inevitability.

  • PDF

해양오염 방제체제의 선진화 방안 (Strategies for Advancement of response management system on marine pollution)

  • 김대원
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제3권1호
    • /
    • pp.3-24
    • /
    • 2000
  • 한국연안도 해상교통량 증가, 선원자질저하 및 노후선박증가로 수만톤을 초과하는 기름유출사고의 위험이 상존하고 있다. 이러한 대형 오염사고 발생에 효과적으로 대응하기 위한 선진 방제체제의 구축방안은 다음과 같다. 1. 범국가적 차원의 국가긴급계획을 효율적으로 실행하기 위한 과학적인 지역긴급계획의 수립 2. 2만톤의 축가방제능력 조기 확보 3. 해양오염방제 전문교육ㆍ훈련의 강화 4. NOWPAP사업 추진등 인접국가간 방제협력체제의 구축 21세기 방제정책은 선진 방제체제를 조기에 구축하여 방제작업의 과학적ㆍ전문화ㆍ국제화를 동한 실행적 방제능력 향상에 주력하여야 할 것이다.

  • PDF

기존 지하 Box 근접 굴착공사 현장의 계측결과를 이용한 역해석 및 보강방안의 적용 사례 (A Case Study on the Feed-Back Analysis and the Reinforcement Plan using the Measurement Data of Excavation Site close to the Existing Underground Box)

  • 이정희;노원석;정순익;김완종
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.445-456
    • /
    • 2010
  • Massive underground excavation can be carried out recently due to the technical development of the excavation for retaining wall. Feed-back analysis using field measurement results is recommended to secure the stability of the construction because calculated values at stages of the design and the construction are uncertain. Reinforcement plan should be established based on the result of it. This study deals with the underground excavation site, which is under construction and is close to structure(subway) at downtown area. The result of feed-back analysis on the measurement data of displacement at multi-soil layers was reflected to make a plan for safe construction. This case study can be useful information for contingency plan on abnormal displacement which can be occurred at similar underground excavation.

  • PDF

배전계토에서의 안전도 평가를 위한 전문가 시스 (An Expert System for Security Assessment in Distribution System)

  • Park, Byoung-youn;Kim, Se-Ho;Moon, Young-Hyun
    • 대한전기학회논문지
    • /
    • 제43권2호
    • /
    • pp.179-188
    • /
    • 1994
  • This paper deals with implementation of an expert system to obtain an optimal plan of load transfer for fault restoration with the capability of security monitoring and assessment in distribution systems. Based on the technique of load transfer tree analysis, the proposed expert system can afford to assist system operators in proposing an optimal plan of load transfer for fault restoration, In paticular, an application of the proposed ES to practical distribution systems yields an optimal load transfer plan which ensures system security by considering security assessment for contingency of feeders and main transformers in the knowledge based sense.

유류오염 포텐셜 해석을 통한 방제대책 수립방법에 관한 연구 -부산항을 중심으로- (A Study on the Contingency Planning Methods under the Analysis of Oil Spill Potential -Application to the Port of Busan-)

  • 전용호;류청로;황창수
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2003년도 추계학술대회 논문집
    • /
    • pp.297-302
    • /
    • 2003
  • This study was carried out to check the contingency planning methods under the analysis of oil spill potential and make a guide line to apply the results to the port of Busan. The expected spilled oil drift patterns are considered with the most probable scenarios under the base of the oil spill potential. The results obtained from this study are as follows: (1) Analysis method of oil spill potent was proposed and the applicability was proved by the application example to the port of Busan to make the contingency plan. (2) Responsible oil spill contingency planning methods / flow are suggested considered environmental factors and the oil spill potential. (3) The coastal waters of Busan was consist of rocky flat, man-made solid shore and beach shore. Marine traffic have high density of oil tanker and cargo ship. Also, oil tanker ship are examined in the small ships to be less than 3000t to supply oil to the ship moored / anchored as well as the large amount of oil tank / basin are located along the coast of Busan port. These systems are introduced to make in put data to the analysis of oil spill potential. (4) According to the analysis of historical records of oil spill accident in Busan, the frequency of accidents by cargo ship rank highest and 45% of accidents is caused by carelessness. about 65% of total accidents shows a small spill accident of less than $10k{\ell}$.

  • PDF