• Title/Summary/Keyword: Contingency Level

Search Result 88, Processing Time 0.023 seconds

Analysis of the Load Transfer Capacity and Study of Conductor Sizes for Contingency Levels in Distribution Systems (상정사고별 배전측 부하분담 능력 분석과 도체 규격 검토)

  • 조남훈;전영재;한용희;한병성
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.7
    • /
    • pp.363-370
    • /
    • 2003
  • This paper presents the analysis of the load transfer capacity and study of conductor size for variable contingencies in distribution systems. The operation capacity of feeders was changed to improve operation efficiency in KEPCO, considerations for contingencies are still based on the previous capacity. In order to cope with the changes such as operation capacity, it is necessary to study whether the present "contingency support criteria" is reasonable or not, also to confirm the whether the present criteria should be improved or not. We analyze the load transfer capacity and conductor size on a distribution system for contingency levels such as the substation-level, bank-level, feeder-level, and zone-level.one-level.

Probabilistic Precontract Pricing for Power System Security (전력계통 안정성확보를 위한 확률적 예약요금제)

  • 임성황;최준영;박종근
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.2
    • /
    • pp.197-205
    • /
    • 1994
  • Security of a power system refers to its robustness relative to a set of imminent disturbances (contingencies) during operation. The socially optimal solution for the actuall level of generation/consumption has been well-known spot pricing at shot-run marginal cost. The main disadvantage of this approach arises because serious contingencies occur quite infrequently. Thus by establishing contractual obligations for contingency offering before an actual operation time through decision feedback we can obtain socially optimal level of system security. Under probabilistic precontract pricing the operating point is established at equal incremental cost of the expected short-run and collapse cost of each participant. Rates for power generation/consumption and for an offer to use during a contingency, as well as information on the probability distribution of contingency need for each participant, are derived so that individual optimization will lead to the socially optimal solution in which system security is optimized and the aggregate benefit is maxmized.

  • PDF

A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.4
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

The Size of the Cochran-Armitage Trend Test in 2 X C Contingency Tables: Two Multinomial Distribution Case

  • Kang, Seung-Ho;Ahn, Sun-Young
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.3
    • /
    • pp.403-409
    • /
    • 2008
  • In this paper we show that the peak of the type I error rate of the Oochran-Armitage trend test could be greater than the nominal level when $2\;{\times}\;C$ contingency tables obtained from two multinomial distributions are extremely unbalanced. This result justifies the use of the exact Cochran-Armitage trend test in extremely unbalanced $2\;{\times}\;C$ contingency tables.

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

A Study on the on-line fast Automatic Contingency Selection (온라인 고속 상정사고 선택에 관한 연구)

  • 송길영;김영한;노대석
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.5
    • /
    • pp.309-318
    • /
    • 1987
  • In the on-line security analysis of power system, Automatic Contingency Selection (ACS) is commonly used to reduce the number of contingency cases which will be evaluated in detail. This paper describes a fast and reliable ACS method which adopts DC load flow in conjunction with compensation theorem to improve execution time, and applies severity performance index, divided on each limit level for considering overload rate, to make reliable contingency ranking. The method has been tested in IEEE 25 bus system and KEPCO 130 bus actual power system. The results of these tests verify its superiority to both the execution time and reliability, and illustrate its effectiveness for the practical use.

  • PDF

A Contingency Fit Between Client IT Capability and Vendor Competence in IS Outsourcing Relationship

  • Seo, Yun-Weon;Han, Hyun-Soo;Lee, Jae-Nam
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.1072-1082
    • /
    • 2005
  • This study develops a contingency fit between client IT capability and vendor competence in IS outsourcing relationship by integrating both the contingency theory in organization and the relationship theory in IS outsourcing. By adopting a fit as a moderation, the relationship intensity of IS outsourcing is hypothesized to be influenced by the fit between client IT capability and vendor competence, thereby leading to the success of outsourcing. The testing data was obtained from 20 IS outsourcing projects from both clients and vendors in Korea. The research model proposed in this study was then tested using the structural equation model (SEM). As expected, the result shows that when there is a fit between client IT capability and vendor competence, higher level of relationship intensity and outsourcing success exhibits. The findings have significant impactions for further research and practice.

  • PDF

Business Strategy, Corporate Governance and Sustainability Reporting: An Analysis of the Fit Contingency Approach

  • HERNAWATI, Erna
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.12
    • /
    • pp.761-771
    • /
    • 2020
  • This study discusses the role of Board Monitoring Effectiveness (BME) on managers' decisions regarding the business strategies that fit the external business environmental conditions by using a contingency analysis approach. Furthermore, this study will examine how fit strategies affect Sustainability Reporting (SR) of listed companies on the Indonesia Stock Exchange (IDX) from 2014 to 2017. This study uses Conditional Mixed Process (CMP) technique. This CMP method is claimed to be more efficient in analyzing the TSL models. This study found that in highly uncertain conditions, BME had a positive influence on the probability of managers to choose prospector and defender strategies rather than analyzers. These results indicate that BME shows positive impact on the contingency fit between business strategies and environmental uncertainty. In addition, the study documents that only prospectors have a positive impact on SR, however this study failed to document that defenders have positive impact on SR. Meanwhile the unexpected result is analyzers have a significantly positive effect on SR. This study is the first study to investigate the role of BME in contingency fit between business strategies and environmental uncertainties and how it produces effects up to the level of SR.