This study analyzed the load and the consumed power characteristics of a potato harvesting operation in a dry field. The potato harvesting operation was performed using an underground crop harvester mounted on an agricultural tractor with a rated engine power of 23.7 kW. The rotational speeds and the torque of the engine output shaft, rear axle, and power take-off (PTO) shaft were measured under various working conditions. The load spectrum and the consumed power were analyzed using the measured data. The results show that the consumed power of the rear axle increased as the working speed increased, while that of the PTO shaft decreased. The consumed power of the engine output shaft showed a similar trend with that of the PTO shaft, but the torque deviation was larger in the load spectrum. The results of previous studies were used to compare herein the consumed power and the load characteristics of the harvesting, rotary, and plow operations in a dry field. PTO and tractive power were highly consumed in the plow and rotary operations, respectively. The consumed power of the PTO shaft and the rear axle in the harvesting operation were 29-41% and 18-23% of the engine power, respectively. Compared to those in the rotary and plow operations, the engine power was relatively evenly distributed to the PTO shaft and rear axle in the harvesting operation.
Kim, Jeong-Gil;Kim, Young-Joo;Kim, Jung-Hun;Shin, Beom-Soo;Nam, Ju-Seok
Journal of Biosystems Engineering
/
v.43
no.2
/
pp.83-93
/
2018
Purpose: This study derived the consumed power and load characteristics of a tillage operation performed in an upland field located in Seomyeon, Chuncheon, Rep. Korea, where potatoes and cabbages were cultivated in two crops. Methods: A plow and rotavator were mounted on a tractor with 23.7 kW of rated power to perform the tillage operation. The work conditions were determined, considering the actual working speed of the tillage operation performed by the local farmers. The power consumption of the rear axle, engine, and power take-off (PTO), PTO torque, and tractive force were measured under each work condition. The consumed power and load characteristics were analyzed using their average values. Results: The rotary-tillage operation consumed more engine power than the plow operation for the same tractor-transmission gear condition. The PTO in the rotary-tillage operation and the rear axle in the plow operation consumed the most power. The power consumption of the engine and the PTO for the rotary-tillage operation tended to increase as the transmission gears of the tractor and the PTO became higher. In contrast, the rear-axle power consumption was insignificant. In addition, the PTO torque tended to rise as the tilling pitch increased. For the plow operation, the drawbar power and the rear axle power accounted for 68-90% of the engine power. The engine and rear axle power, drawbar power, and tractive force tended to rise as the working speed increased. Conclusions: The power consumption and load characteristics differed for the plow and rotary-tillage operations. They may also differ depending on the soil conditions. Therefore, the power consumption and load characteristics in various work environments and regions should be analyzed, and reflected in the design of tractors and working implements. The results derived from this study can be used as a reference for such designs.
Kim, Jeong-Gil;Park, Jin-Sun;Cho, Seung-Je;Lee, Dong-Keun;Park, Young-Jun;Moon, Sang-Gon
Journal of the Korean Society of Manufacturing Process Engineers
/
v.20
no.8
/
pp.67-73
/
2021
In this study, we installed forward and reverse rotation rotavators on a tractor to measure the load in the field and analyze the power consumed. The rotavator is attached to the rear of the tractor and transmits the power applied from the power take off (PTO) of the tractor to the rotating shaft of the rotavator, and it plows or reverses the soil according to the rotational direction of the rotating shaft. Depending on the rotational direction of the rotavator, the power consumed in the tractor engine and the power transmitted to the tractor axle and rotavator also vary, thus, research of load and power is an essential factor in designing the system. As a field test results, 84.1-93.5% power was consumed by the forward rotation rotavator, and 37.8-57.5% power was consumed by the reverse rotation rotavator. In addition, depending on the rotation direction of the rotavator, the power consumed by the tractor was in the order of PTO and axle. Based on the research results, development of reliable rotavator systems would be possible in the future research.
Journal of Advanced Marine Engineering and Technology
/
v.11
no.4
/
pp.33-40
/
1987
Arc power is consumed energy per unit time between welding electrodes. The relations between consumed energy and electrode distance, current, voltage are nonlinear characteristics. Therefore commercial A.C. wattmeter cannot be used for measurement of the arc power. Most of arc energy measuring systems are developed for relay contact arc measurement. Relaly arc requires integrated instantaneous power because relay arc finishes in a short instant. But most of welding powers are continually consumed powers, therefore instantaneous power must be continually indicated in the form of averagy value. The author propose a new measurement method of power in which the current and voltage of welding electrode is multiplied and the resultant signal is passed to low pass filter in order to remove higher order frequency components. After integrating, the signal is devided by the integral interval and the results are stored in a computer memory.
In DC 1500V electric traction substations, diode rectifiers are commonly used to supply stable DC power with electric train sets. However, it operates in the first quadrant of the voltage-current plane and thus needs regenerative inverters which transfer the surplus regenerative power caused by regenerative braking of electric train sets into the grid. In order to select the proper capacity and installation position of regenerative inverter, it needs to investigate the consumed and regenerative energy of the electric traction substations in advance. This paper presents an analysis of regenerative energy in two substations operating in Seoul line 2 and Kwangju line 1. DC line voltage and feeder currents are measured for a day to calculate consumed and regenerative power for four feeders. We calculated an amount of regenerative energy consumed in other feeders and estimated the cost reduction in energy consumption due to the reuse of regenerative energy.
The paper is related to smart maximum power system based on program logic. Especially, this system compares the total demand power with the target power by using the signal from the digital kilo watt meter. Based on the power information by the maximum power control equipment the consumed future power is anticipated. In addition, through consumed future power the controllable target power is set, and it applies on the maximum power control equipment. User or manager would control the load efficiently through the simple programming which could control load based on the control sequence and relay. So this system could control load more efficient and stable. Also the conventional load control circuit is not needed. Therefore, it is possible to improve the simple system configuration, which is resulted in cost effective and time saving. So this system is anticipated on time and coast.
Journal of the Korea Institute of Information and Communication Engineering
/
v.10
no.8
/
pp.1422-1427
/
2006
In order to estimate the power consumed by an embedded microprocessor during an execution of software, we measure and utilize the current consumed by the processor during the execution of each instruction. In this paper, we measure and analyse the current consumed by the microprocessor adc16s310 during the execution of arithmetic and logic instructions, and propose a power estimation model which estimates the current for all instruction executions precisely by using a small numbers of current measurements. The proposed model can estimate the current with an average 0.34% error by using only 5.84% of total current measurements for arithmetic and logic instructions of the processor.
The Transactions of the Korean Institute of Electrical Engineers C
/
v.51
no.10
/
pp.506-510
/
2002
In this paper, we study on the mutual characteristics between transmitting efficiency of pulse energy and wall plug consumed power of non-thermal Plasma for removing environmental pollutive gas of coal plant. To obtain high pulse energy of our system, we used MPC(magnetic pulse compressor) of power switch and tested their characteristics by adjusting electrode length of reactor and charging voltage in capacitor. As a result, we obtained consumed power of wall plug and a compressed pulse of voltage 110kV, rising time 500ns. Impedance of load on increasing electrode length was decreased, but electrical efficiency was increased. These results indicate we can control critical voltage of pulse corona and electrical efficiency of economic cost in power plant.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.2
/
pp.92-99
/
2014
The paper is related to smart maximum power system based on program logic. Especially, this system compares the total demand power with the target power by using the signal from the digital kilo watt meter. Based on the power information by the maximum power control equipment the consumed future power is anticipated. In addition, through consumed future power the controllable target power is set, and it applies on the maximum power control equipment. User or manager would control the load efficiently through the simple programming which could control load based on the control sequence and relay. To begin with the conventional maximum power control algorithm is surveyed, and the smart maximum power control system based on program logic is used, and the new algorithm from full load to proportion shut down is proposed by using PLC program. the validity of the proposed control scheme is investigated by both simulation results.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.10
no.2
/
pp.444-461
/
2016
A power-saving mechanism for smartphone devices is developed by analyzing the features of data that are received from Internet of Things (IoT) sensors devices to optimize the data processing policies. In the proposed GreenIoT architecture for power-saving in IoT, the power saving and feedback mechanism are implemented in the IoT middleware. When the GreenIoT application in the power-saving IoT architecture is launched, IoT devices collect the sensor data and send them to the middleware. After the scanning module in the IoT middleware has received the data, the data are analyzed by a feature evaluation module and a threshold analysis module. Based on the analytical results, the policy decision module processes the data in the device or in the cloud computing environment. The feedback mechanism then records the power consumed and, based on the history of these records, dynamically adjusts the threshold value to increase accuracy. Two smart living applications, a biomedical application and a smart building application, are proposed. Comparisons of data processed in the cloud computing environment show that the power-saving mechanism with IoT architecture reduces the power consumed by these applications by 24% and 9.2%.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.