• Title/Summary/Keyword: Construction step

Search Result 1,150, Processing Time 0.03 seconds

A Study on the methodology of applying and activating the Construction Drawing Information Exchange Standard(STEP) by CALS/EC (CALS/EC 체계에 따른 건설도면 정보교환 표준(STEP)의 적용 및 활성화 방안에 관한 연구)

  • 김인한;최중식
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.39-53
    • /
    • 2002
  • In the Korean domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To remedy the aforementioned inefficiency effectively, it is necessary to apply the STEP standard which is known as an international standard for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to activate the STEP based construction drawing information exchange standard to the current construction drawing information exchanging and sharing practice. In this paper, the domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In addition, a methodology of applying and activating the STEP standard has been suggested. Finally, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

Test method for step-by-step construction of Autonomous station control system (자율분산 역 제어시스템 단계적 구축에 따른 테스트 방법)

  • Kim, Young-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1239-1243
    • /
    • 2007
  • Autonomous Station Control System is automatic route control system of large-scale station. The system has flexibility of system step-by-step construction and expandability. A method of step-by-step construction for Autonomous Station Control System has system expansion and subsystem software expansion. The system has autonomous controllability and autonomous coordinability for system step by step construction. With property for a basis, each of subsystem communicates data field. Also, Each subsystem has its own management system, Autonomous Data Manager to manage itself and coordinate with the others. This paper make clear test method for Autonomous Station Control System expansion and software expansion. The first test method of system increasing construction is single station construction test. The second of method is connecting test the neighbor's Autonomous Station Control System. The third of method is connecting test the Autonomous Line Management System. Also, the test method of software expansion take the case of route control subsystem.

  • PDF

A Study on the Usage of STEP data on the Construction CALS/EC Environment - Focusing on linking the Drawing Information and Material Information - (건설 CALS/EC 환경에서의 STEP 데이터 활용방안에 관한 연구 - 도면정보와 자재정보 연계 중심으로 -)

  • 서종철;김인한
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.1
    • /
    • pp.121-139
    • /
    • 2003
  • Currently, it is not popular to use the STEP based product information in the construction drawing files, in spite of the importance and possibility of using various product data in drawing files on the CALS/EC environment. This paper aims to demonstrate a construction drawing information management system based on ISO 10303/STEP. To achieve this aim, the authors have analyzed the current construction drawing information classification hierarchy widely used for domestic and international, and examined the material data connection mechanism within CAD drawing data, and finally investigated the management systems for construction documentations and drawings in a public companies. Therefore, the expected benefit of the proposed system is that STEP drawing information management will be done standardization and the information of STEP construction drawing can be managed, shared and supported design business through materials data connection.

  • PDF

A Study on the methodology of applying the CALS/EC Construction Drawing Information Exchange Standard(STEP) in Design Fields (CALS/EC 건설도면 정보교환 표준(STEP)의 설계분야 적용 방안에 관한 연구)

  • Kim In-han;Choi Jung-sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.163-168
    • /
    • 2001
  • In the domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To solve the problems effectively, it is necessary to apply STEP standard that is international standard and standard technology for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to solve problems which occur to the current construction drawing information exchanging and sharing practice. The domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In result, a methodology of applying the STEP standard has been suggested. In addition, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

A Stduy on the Development of XML Schemata and STEP Model for Sharing Construction Drawings Information (건설도면정보 공유를 위한 XML 스키마 개발 및 STEP 연계기술에 관한 연구)

  • Kim, In-Han;Choi, Jung-Sik;Jo, Chan-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.9 no.3
    • /
    • pp.57-77
    • /
    • 2004
  • The main purpose of this study is to develop XML schemata and related STEP model for sharing construction drawings information. To achieve this purpose, the authors have developed a drawing information model based on STEP/AP202, the data searching mechanism based on STEP, and XML schemata for sharing and exchanging information between vector data and non-shape attribute information. Finally, the authors have suggested the way of sharing drawing information through linked STEP data and a XML schema using test cases of construction material information and code checking. The study shows a way of optimized managing and sharing construction information through the drawing information and external data for the whole building life-cycle, from early design stage to the construction stage.

  • PDF

Behavior Due to Construction Step in Steel Deck Bridge by Large Block Construction Method (대블록시공법에 따른 강상판교의 시공단계별 거동)

  • Lee, Seong-Haeng;Kim, Kyoung-Nam;Hahm, Hyung-Gil;Jung, Kyoung-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.97-105
    • /
    • 2010
  • The displacements of steel deck bridge due to construction step are measured, and three dimensional analysis with full modeling is carried out to compare with the measured results. Three dimensional structural analyses considering construction step by large block construction method are accomplished with verified model. The conclusions are as follows. 1. Comparing the data of grid analysis with the result of 3D full modeling in steel deck bridge, the design method using grid analysis has a limit for describing the displacements of curved bridge. The analysis of 3D full modeling has been proved as more accurate method. The differentiation of results in two methods is about 10%~20%. 2. It is verified that the maximum displacement of during construction is 1.7 times larger than the displacement of final construction. 3. The bridge behavior considering the construction step is somewhat different from that of final stage in whole structure and the displacement and stress during construction is larger than that of final construction. Therefore, it needs the reasonable structural design considering the construction step to get economical efficiency and a high competitive construction.

A Development of 2D CAD Information Model based on STEP in Construction (STEP 기반의 건설분야 도면 정보 모델링에 관한 연구)

  • Kim, Seong-Sig;Jeong, Seong-Yun;Na, Hei-Sook;Lim, Kyoung-Il
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2000.10a
    • /
    • pp.227-230
    • /
    • 2000
  • 건설 도면정보의 공유 및 교환은 건설 CALS/EC(Continuous Acquisition & Lifecycle Support /Electronic commerce) 환경의 필수적인 요소이다. 그러나 CAD 시스템의 버전변화와 별도의 한글처리로 인하여 도면정보의 관리 렌 활용에 많은 문제점이 발생하고, 상이한 CAD 시스템간의 파일 교환이 제대로 이루어지지 못하는 등 도면정보 교환을 위한 정보모델의 구축이 절실히 요구되고 있다. 이러한 환경에서 STEP(Standard for the Exchange of Product model data)은 건설 도면정보의 교환 및 공유를 위한 정보모델을 구축함에 있어서 그 활용 가능성이 높다. 본 연구에서는 STEP을 이용하여 건설분야에서 활용 가능한 2차원 도면정보 모델을 개발하고자 한다. 이를 위하여 STEP내의 AP 202를 기반으로, AP 214와 독일의 2차원 도면정보 표준화 프로젝트인 STEP-CDS를 참조하도록 한다. 그리고 실제 개발된 도면정보모델이 기존 CAD 도면 데이터를 제대로 표현할 수 있는지 검증하기 위하여 상용 CAD시스템인 AutoCAD Rl4의 DXF 데이터를 개발된 정보모델로 변환하여 그 결과를 검토하고자 한다. 세부적으로는 DXF 데이터의 도면정보모델로의 변환을 위하여 DXF 구조의 STEP 스키마를 정의한다. 이때 이 스키마와 도면정보모델의 스키마간의 매핑을 위하여 STEP내의 EXPRESS-X를 이용하기로 한다. 또한 도면정보 모델의 데이터의 뷰잉과 브라우징을 위하여 도면정보 뷰어를 개발한다.

  • PDF

The Buckling Characteristics of Single-Layer Lamella Domes according to the Joint Flexibility under Construction (단층라멜라 돔의 시공 중 접합부 강성에 따른 좌굴특성)

  • Suk, Chang-Mok;Kim, Cheol-Hwan;Jung, Hwan-Mok
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.111-118
    • /
    • 2011
  • Single-layer latticed domes with rigid-joint have an advantage in the construction cost and the aesthetic. But, in single-layer latticed domes, the joints are hard to discriminate between pin-joint and rigid-joint, and consisted of semi-rigid joint in practical. And the erection of large roof structures requires special techniques. As one of these special techniques is the Step-Up erection method. This paper verified buckling characteristics of single-Layer lamella domes according to the Joint flexibility under construction by Step-up method. The results are follows: As erection steps increase, the buckling strength decreases. It is occurred the joint buckling by snap through on the top of dome when the joint flexibility close the rigid. And large tensile stress distribution appeared in circumferential member of bottom boundary when the step of construction is low. As the step of construction increase, large compressive stress distribution showed in the top of dome.

Development of Wave Breaking Construction Method for Shore Protection using New Type of Precast Preforated Concrete Block (프리캐스트 유공식 호안블록을 이용한 소파감쇄 신공법개발)

  • 이주호;박광순;박경래;염종윤;배한욱
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.743-748
    • /
    • 1997
  • In this paper, a new type of precast perforated concrete block is presented to be used in the construction of a step seawall. The overtopping rate of the perforated step seawall is lower than that of the traditional non-perforated step seawall. In construction stage, the cost of total construction of the perforated block is cheaper than that of traditional block. The new type of perforated block may be used as an alternative for shore protection facility.

  • PDF

A Study on the methodology for Web-based Maintenance System Development of Light Rail Transit (웹기반의 경량전철 유지보수 정보화시스템 개발방법론에 대한 연구)

  • Lee, Ho-Yong;Han, Seok-Yoon;Cho, Hong-Shik;Cho, Bong-Kwan
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.722-729
    • /
    • 2007
  • The methodology for maintenance system development should overall be considered with all of task characteristic, schedule, and the technical condition of investment sources. This research applies Waterfall model to methodology for the development and construction of maintenance system through customizing the CD (Custom Development) procedure of "HSDM (Hyundai System Development Methodology)" based on information engineering. The waterfall model called as classic life cycle paradigm is defined for the sequent development procedure, which make progress a next step after that a previous step is admitted with thorough review. This model which is popular and the oldest paradigm is used for system development by four steps; demands analysis, design, construction, and maintenance. This methodology advances higher abstract step from higher lower step using top-down approach from concept definition to construction, which notices the end of a step whenever a step is over. Therefore, each step is exactly divided, and consequently the output is clearly yielded.

  • PDF