Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase (대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델)

  • Choi, Onekyu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.43-53
    • /
    • 2018
  • Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.

ON TECHNICAL POSSIBILITY AND PRACTICAL EXPERIENCE OF ULTRASONIC SCALE PREVENTING DEVICES USE ON BOILERS AND HEAT-EXCHANGERS IN RUSSIA

  • Semenov, A.G.
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • 1994.06a
    • /
    • pp.728-733
    • /
    • 1994
  • Scientific foundation for ultrasonic scale preventing devices construction was given in 40S-50S of this century but their production in former USSR was organized later in 70th. Several different principles of scale preventing is overviewed together with physical principles of ultrasonic method. Practical experience received in USSR in 80S is discussed. Technical decisions and inventions used for construction of the first device UZU-1 produced in Cheboksary plant are enumerated and principles of UZU-2 device are briefly sketched.

  • PDF

Numerical Evaluation of Tidal Characteristic Changes after Saemangeum Sea-dike Closing (수치모형(數値模形)을 이용(利用)한 새만금 방조제(防潮堤) 축조후(築造後)의 조석(潮汐) 운동(運動) 예측(豫測))

  • Park, Chang-Kyu;Lee, Nam-Ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.1 s.13
    • /
    • pp.61-76
    • /
    • 2001
  • During the performance of large scale tidal land reclamation project along the coast line, the construction of large scale structures such as sea-dikes, closing estuaries will induce big changes of near-shore hydraulic behavior. In this paper, its is aimed to verify the change of tide and currents after the construction of sea-dike of the Saemangeum project along the coast line. Numerical scale model "TRISULA" which development by Delft Hydraulics in the Netherlands was used. "TRISULA" is adopting the finite difference numerical scheme, and mostly using for hydro-dynamic solution along the sea and estuaries. Model boundary is covering $100{\times}170$ Km and constructed with $133{\times}337$ grids. Outer side boundary is divided 48 sections, and input 37 tidal components are gained from another big scale numerical "Yellow Sea" model. Model calibrations & verifications were performed th field tide & current datas which were measured along sea-dike alignment during Aug. $1997{\sim}Apr$. 1999. And then, numerical simulation with the tide condition dated 17 Apr. 1999 was performed with & without sea-dike construction condition for the comparison. Evaluated boundary is 20 km out-side from sea-dike alignment. Four cross lanes were set up, each of lane contains 3 points, for the comparison of sea-dike construction effects. Results showing the tidal amplitude is reducing approximately 20 cm after the construction of sea-dike during spring tide condition, amplitude 6.9m. Currents after construction of sea-dikes along the alignment, the northern part shows 50%(inner), 90%(outer) and the southern part shows 10%(inner) 50%(outer) of the currents before construction.

  • PDF

Development and Fabrication of Heating and Water Sparging Remediation System (HWSRS) for DNAPL-contaminated Groundwater Treatment

  • Lee, Ju-Won;Park, Won-Seok;Gong, Hyo-Young;Lee, Ae-Ri;Kim, Da-Eun;Baek, Seung-Chon;Lee, Jong-Yeol
    • Journal of Soil and Groundwater Environment
    • /
    • v.18 no.6
    • /
    • pp.32-37
    • /
    • 2013
  • The scope of this study was to develop, design, and build an ex-situ remediation system of using the heating and water sparging treatment for the highly volatile DNAPL (Dense Non-Aqueous Phase Liquid) contaminated groundwater, and to conduct pilot testing at the site contaminated with DNAPL. The TCE (Trichloroethylene) removal was at the highest rate of 94.6% with the water sparging at $70^{\circ}C$ in the lab-scale test. The pilot-scale remediation system was developed, designed, and fabricated based on the results of the lab-scale test conducted. During the pilot-scale testing, DNAPL-contaminated groundwater was detained at heat exchanger for the certain period of time for pre-heating through the heat exchanger using the thermal energy supplied from the heater. The heating system supplies thermal energy to the preheated DNAPL-contaminated groundwater directly and its highly volatile TCE, $CCl_4$ (Carbontetrachloride), Chloroform are vaporized, and its vaporized and treated water is return edback to the heat exchanger. In the pilot testing the optimum condition of the HWSRS was when the water temperature at the $40^{\circ}C$ and operated with water sparging concurrently, and its TCE removal rate was 90%. The efficiency of the optimized HWSRS has been confirmed through the long-term performance evaluation process.

The Influence of New Countryside Construction on Rural Landscape

  • Gaoqi, Ouyang
    • Proceedings of the Korean Institute of Landscape Architecture Conference
    • /
    • 2007.10b
    • /
    • pp.180-185
    • /
    • 2007
  • Although the large-scale new socialist countryside construction has brought a opportunity for the rural landscape construction, it also impacted seriously the style of rural landscape. On the base of analyzing the advantages and disadvantages of new countryside construction, the paper proposed how to construct rural landscape in the construction tide.

  • PDF

A Study on the composition of PFV(project financing vehicle) used in large-scale development project (대규모 개발사업에서의 PFV 구성에 관한 연구)

  • Kim, Eun-sung;Kim, Jae-jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.159-163
    • /
    • 2008
  • The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.

  • PDF

The Case Study of the Effective Management of the Site Using Measurement Result During the Excavation Construction (굴착공사 중 계측결과 활용을 통한 효과적인 현장관리 사례 분석)

  • NamGung, Han;Jung, Kyoung-Sik;Koh, Hyung-Seon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.428-444
    • /
    • 2010
  • After underground excavation being introduced in dometic, many technologies have been storing up. One of them, measurement, has been recognized as an important item under excavation construction. But, unlike a large-scale construction, it was not been treated importantly at the general small-scale structures with poor ordering and original design was unchanged under construction was normal if the problem didn't occur on monitoring. In this paper, the site which safe and economical management as well as shortening construction period was made effectively using measurement result was introduced. Also, the site which was completed safely with analyzing measurement and reinforcement when unusual symptom happened was introduced. Using measurement result effectively will be able to obtain the safety and prevent unnecessary economical loss.

  • PDF

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

A Study on the Calculation of Organization Scale in Construction Management -Focusing on Building Construction- (건설사업관리(CM) 관리인력 규모산정을 위한 사례연구 - 공공공사 건축공사 사례를 중심으로 -)

  • Ahn, Sang-Hyun;Kim, Jin-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.65-72
    • /
    • 2013
  • While growth of domestic CM market has slowed down due to economic recession, it recently shows sign of scale as some public agencies are relocating their headquarters. Since the introduction of CM system, a number of client organizations have acquired construction project management capabilities, however, sufficient efforts are not made to estimate the size of construction project management organization. This study drew a method for estimating the size of the organization managing construction project by utilizing statics analysis and project costs per member based on 10 public construction projects and tried to review applicability through case studies. With this study, we would like to make a contribution to achieving smoother work performance and success of the construction project by estimating and allocating proper scale of management workforce.

A Study on the fluctuation Factors Influenced on the Computation of interior Cost (인테리어 공사비 산정에 영향을 주는 변동요인에 관한 연구)

  • 정재은;권영성
    • Korean Institute of Interior Design Journal
    • /
    • no.16
    • /
    • pp.75-81
    • /
    • 1998
  • With the rise of the economic level and the improvement of the standard of living the size of the interior work is becoming large and specialized, With the recent opening of the domestic interior decoration market the order of the large-scale interior decoration work is actively received and its efficient construction is vigorously made. Accordingly reliability is required in keeping with all the accuracy of computing interior construction expenses systematically is importantly emerging. The estimation sheet written in a kind of process mode and in an area made as the construction expense breakdown mode were statistically treated and analyzed as well as quantity computation breakdown data. In determing the major factors that expert an influence on the factors of changes in construction expenses as well as the compositional ratio of construction work that becomes basic material for developing the cost model of interior decoration work the following conclusion could be made: Improvement should be made to suit the present situation by synthesizing and arranging the data practically used in current interior construction expenses. Required construction expenses for the kind of work common to each construction field are showing a given proportion and the required construction expenses of rather small scale interior construction work tend to be irregular. It is necessary to compute optimal construction expenses by calculating the optimal period of work and working personnel in consideration of the influential factor in each work.