• Title/Summary/Keyword: Construction productivity

Search Result 1,120, Processing Time 0.024 seconds

Process Analysis & Evaluation for Steel Frame Fabrication Automation (철골조립공사 자동화를 위한 프로세스 분석 및 평가)

  • Kim, Baek-Joong;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.155-158
    • /
    • 2007
  • The construction industry kept lower level of the technology and productivity improvement than any other kinds of industry. But in most analysis of previous construction work which promoted the productivity of construction, the analysis process has only developed by the economical efficiency or the time studies through work sampling in construction field, So We suggest motion analysis as a tool to solve these problems. Spacially, this study find out productivity improvement method of steel frame fabrication works with using motion analysis. If the result of this study were to be applied to the actual construction field, it will be of great help for Building Construction Automation.

  • PDF

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

A Study on Management Responsibility about Factors that Influence the Productivity on Site - based on the Goneralcontractor's Questionnaire - (생산성을 저해하는 요소들에 대한 관리 책임에 관한 연구 - 원도급자 설문을 중심으로 -)

  • Chung Hee-Suk;Lee Tae-Sik;Park Jong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.350-354
    • /
    • 2002
  • The industrial society today becomes competitive industry of high-development and advance. The notion of the productivity improvement in most of the industries becomes much more important in this situation. Furthermore, improvement in the productivity is the main pursuit of all industries, in order to overcome the recent economical crisis in korea and to strengthen our competitiveness in international industry. Therefore, the improvement of productivity becomes more crucial especially for the recent difficulties of domestic construction industry. From such a perspective, this study has three main objectives Identify positive and negative factors which affect construction productivity based on the analysis of questionnaires distributed to subcontractors.

  • PDF

Development of Productivity Analysis Simulation Model for Formwork Based on 3D Printing Technology Using ARENA (ARENA를 활용한 3D 프린팅 기술 기반 거푸집 공사의 생산성 분석 시뮬레이션 모델 개발)

  • Ahn, Heejae;Lee, Changsu;Kim, Harim;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.188-189
    • /
    • 2021
  • The technology of manufacturing freeform molds with S-LOM based 3D printer has advantages in the production period and the curvature range. However, there is no any support tool about productivity analysis of S-LOM technology because S-LOM technology is early-stage technology. There can be problems about increase of construction time and cost without any decision support tool like productivity analysis models etc. Therefore, in this study, the productivity analysis simulation model for freeform formwork based on S-LOM technology was developed using ARENA software. The process and logic of manufacturing freeform molds can be easily visualized in this model. Futhermore, the resource like labor, equipment and material can be easily optimized with this model. As a result, it can contribute to preventing the increase of construction time and cost in formwork with further productivity analysis.

  • PDF

College Students' Workload and Productivity for Different Types of Tasks before and during COVID-19 Pandemic in the U.S.

  • Tian, Chi;Wu, Hongyue;Chen, Yunfeng
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.500-507
    • /
    • 2022
  • COVID-19 pandemic forces college education to be rapidly switched from face-to-face education into remote education. Two inconsistent findings exist in previous study about remote learning. First, studies before COVID-19 pandemic found remote learning is an effective method, which provided students with higher achievement and improved their work-life balance. However, studies showed remote learning during COVID-19 pandemic is not as effective as expected because of technical issues, lack of motivations and even mental health issues. Second, findings from studies about remote learning impacts on workload and productivity during COVID-19 are also inconsistent. Therefore, this study aims to quantitatively measure college students' workload and productivity during COVID-19 of different types of tasks to provide a comprehensive and latest evaluation on remote learning. The findings of this study show remote learning slightly increases college students' total listening and speaking tasks workload, total reading and writing tasks workload. Furthermore, phone call, in-person meeting, online meeting and email workload increase significantly in remote learning. However, productivity for both listening and speaking, reading and writing tasks decreases after remote learning but no significant changes of productivity are found.

  • PDF

Structural Analysis of Earthwork Productivity Influence Factors Using Fuzzy DEMATEL Method (Fuzzy DEMATEL 방법을 활용한 토공사 생산성 영향요인 구조분석)

  • Lee, Chanwoo;Kim, Hyeonmin;Kim, Hyungjun;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.751-760
    • /
    • 2023
  • Enhancing productivity in earthwork projects is crucial, significantly affecting both time and cost efficiencies. However, existing research in this domain predominantly relies on qualitative data and methodologies, which may not suffice given its critical significance. This study employed the fuzzy DEMATEL method to conduct a structural analysis of variables affecting productivity in construction projects. The findings reveal that plan changes possess the most substantial overall influence on earthwork productivity, with a comprehensive strength rating of 4.58. Additionally, it was observed that precipitation data exerted the most pronounced positive impact, with a rating of 0.48. These insights are anticipated to aid in identifying and prioritizing areas for productivity enhancement in construction projects.

Productivity and Economic Analysis of Sandwich Panel Construction Work by Shop Fabrication (공장가공에 따른 샌드위치 패널공사의 생산성 및 경제성 분석)

  • Cho, Dong-Ryul;Son, Jae-Ho;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.113-122
    • /
    • 2009
  • The domestic construction market started to expand steadily since 1970s. The building market which utilizes a sandwich panel with advantages of economical construction expenses and convenient construction has grown rapidly in recent years. However, the companies which specialize in constructing sandwich panels are relatively small or medium size, compared with other construction companies. As a result, studies on the improvement of productivity have not been conducted sufficiently. In this study, the construction sites of sandwich panel are investigated, and the work processes by each team are analyzed. Additionally, the productivity and the construction cost of each work group are analyzed by constructing a model using the Web-Cyclone. It analyzed sensitivities about change of productivity and work costs following in processing place of the panel which is one of the productivity effect factors, so it assayed the optimized productivity by each work group and work costs. Analysis showed that 30% of productivity has improved compared with the factory processing work group, and analysis of work costs showed that about 15% of work costs was increased. Also sensitivity analysis of opening ratio showed that the work costs optimization will be accomplished when about 20% of opening was processed from the factory.

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site

  • Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.45-50
    • /
    • 2014
  • Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.