• Title/Summary/Keyword: Construction portal

Search Result 148, Processing Time 0.025 seconds

Statistical Analysis about Characteristics of Tunnel Portal Slopes on the National Highway in Korea (국내 일반국도 터널 갱구사면 특성 통계 분석)

  • Kwon, O-Il;Baek, Yong;Koo, Ho-Bon;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.745-750
    • /
    • 2005
  • The demand of tunnels has been increased for the linear improvement of general national highway, and road construction and/or enlargement in Korea. Also, the collapses of tunnel portal slope have been increased in recent due to heavy rain caused by global warming. Therefore, it has been risen the requirement of system for the stability of tunnel portal slope in Korea as well as all over the world. The objective of this research is to develop an effective maintenance system for supervising the tunnel portal slope. This paper is a basic proposal to execute a survey on the current status and state of the tunnel portal slopes that were already installed along general national highways.

  • PDF

A Study on the Marine Science Education Comprehensive Portal Site Construction for Elementary, Middle and High School Students (초중고생을 대상으로 한 포괄적 해양교육 포털사이트 구축을 위한 기반연구)

  • Park, Jong-Un
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.19 no.2
    • /
    • pp.229-238
    • /
    • 2007
  • The Purpose of this study is to examine the present marine science education programs in Korea and understand how they are organized and how well they are being used. Eventually, being a foothold research prior to the construction of an inclusive marine science education portal site for elementary, middle, and high school students is the objective of this study. Through this study, we can expect three positive effects. First, through classification of marine science education programs, it can be used when dividing the contents and writing textbooks for elementary school students. Second, through the construction of portal site, we can expect to correct the recognition and understanding of marine and it will contribute to the future industry development. Third, we can offer the correct materials for teaching and learning and through learning, understanding on marine will get better.

WEB-BASED CONSTRUCTION KNOWLEDGE MANAGEMENT PORTAL

  • Youjin Jang;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.487-492
    • /
    • 2011
  • As a knowledge-based economy is emerging, knowledge management (KM) is being rapidly disseminated in both academic circles and the business world. Accordingly, how to effectively manage knowledge is vital to the survival and advance of a company, particularly in project-based industries such as construction. For these reasons, construction companies have adopted IT-based Knowledge management systems (KMS), which is the technology platform and infrastructure that an organization employs to support knowledge management. However, many construction companies have spent resources on developing a KMS that only focus on codification. Furthermore, small and medium-sized companies have limited resources to afford extensive investments. This research addresses the problems found in the current KMS and develops a web-based construction knowledge management portal (CKMP). To achieve these objectives, a case study is conducted and requirements for implementing KM are identified. Based on the identified requirements, this paper builds CKMP using Expert Index (EI), blog, ontology based knowledge retrieval, and wikiblog. The most important functionality of CKMP is their fundamentals to synchronize and support KM process. In order to validate the CKMP, a pilot test with actual users is conducted, and the usability of the system is compared with the current systems. This study is relevant to both the construction industry and academia, as it provides a means of enhancing the performance of KM.

  • PDF

Development of a Portal System for Information Integration of Construction Business Processes (건설사업 프로세스의 통합 정보화를 위한 포털시스템 개발)

  • Jang, Seok-Woo;Yoon, Hoi-Su;Kim, Jin-Uk;Huh, Moon-Haeng
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.8
    • /
    • pp.33-41
    • /
    • 2009
  • In this paper, we develop a construction business information portal system. Our portal system consists of two major parts including a institution portal and a public portal. The institution portal is for the people working at governmental agencies and the public one is for general users. This paper adopted Method/1 as the development methodology of the portal system and made the portal using Java-based web application framework. After the development of the portal. we tested it step by step to improve its quality and run Help-desk for the stable operation and maintenance. In the future, we will develop some additional contents required by users.

Delelopment of Cloud-Based ERP (Cloud 기반의 ERP 개발)

  • Jang, Dai-Hyun;Shin, Seong-Yoon;Lee, Hyun-Chang
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2019.05a
    • /
    • pp.147-148
    • /
    • 2019
  • In this paper, we propose cloud-based site-oriented ERP development for a construction company. The ERP development was aimed at the development of web-based user service portal and management portal, middleware development based on WCF (Windows Communication Foundation), and client SW development based on WPF (Windows Presentation Foundation). Major developments of ERP are the process refinement of the use process of the small and medium construction, user-oriented UI design, process slimming and automation.

  • PDF

Integrated Knowledge Management System based on Construction Portal (건설포탈 기반통합형 지식관리시스템)

  • Park, Moon-Seo;Jang, You-Jin;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.12-21
    • /
    • 2010
  • Construction companies recently have been highly interested in developing information system as following the advanced of IT technology. Especially, with advent of knowledge-based paradigm, Knowledge Management System(KMS) has been actively built. However, current KMS is not optimized and not satisfied because KMS is not integrated with existing information system and has problems of method of knowledge management. The objectives of this research is to develop integrated KMS, which synthesizes knowledge and functions of scattered information system. This research investigates current KMS and analyzes the requirements of KMS. Based on the requirements, the utilization of construction portal is suggested. And integrated knowledge management method, which has connections with applications in construction portal, is suggested and the system is developed.

The e-Science collaborative research environment using the Cactus and the GridSphere (Cactus와 GridSphere를 이용한 e-Science 협업 연구 환경)

  • Na Jeoung-Su;Cho Kum Won;Song Young Duck;Kim Young Gyun;Ko Soon-Heum
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.35-40
    • /
    • 2005
  • Up to recently, with the improvement of a computer power and high speed of network technology, advanced countries have researched a construction of the e-Science environment. As a major application part, a construction for environment of CFD, also, have studied together. During the research, people realize that not sharing hardware but also appropriate software development is really important to realize the environment. This paper describes about a construction of a collaborative research environment in the KISTI: Clients can connect to the computing resources through the web portal, run the Cactus simulation.: According to the computing resources, the simulation can migrate to some site to find better computing power.: Result of the calculation visualize at the web portal directly so that researchers of remote site can be share and analyze the result collaborative ways.

  • PDF

Study on Statistical Method for Objective Evaluation of Tunnel Portal Slopes (객관적인 터널 갱구사면 평가를 위한 통계기법 연구)

  • Kwon, O-Il;Baek, Yong;Na, Jong-Hwa;Seo, Yong-Seok;Kim, Gyo-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.634-643
    • /
    • 2006
  • This study was intended to develop a high reliable technique by statistically processing on-site data with a general linear model, providing the basic data for construction, analysis of stability and establishment of maintenance measures for tunnel portal slopes in the future. This study evaluated the stability of a tunnel portal slope using a quantified technique, which is based on a general linear model. The important scores of each independent variable were allocated by using the ranges of the quantified values, based on the predicted coefficient of regression and the scores for categories of each independent variable were allocated so that those are equally spaced. The quantification model obtained from the results of evaluating the total data used for the quantification process provided precise results. In addition, it is expected that a more detail subdivision of response variables and sufficient data would produce a better stability evaluation standard.

  • PDF

Serviceability design of a cold-formed steel portal frame having semi-rigid joints

  • Lim, J.B.P.;Nethercot, D.A.
    • Steel and Composite Structures
    • /
    • v.3 no.6
    • /
    • pp.451-474
    • /
    • 2003
  • Details are given of a cold-formed steel portal framing system that uses simple bolted moment-connections for both the eaves and apex joints. However, such joints function as semi-rigid and, as a result, the design of the proposed system will be dominated by serviceability requirements. While serviceability is a mandatory design requirement, actual deflection limits for portal frames are not prescribed in many of the national standards. In this paper, a review of the design constraints that have an effect on deflection limits is discussed, and rational values appropriate for use with cold-formed steel portal frames are recommended. Adopting these deflection limits, it is shown through a design example how a cold-formed steel portal frame having semi-rigid eaves and apex joints can be a feasible alternative to rigid-jointed frames in appropriate circumstances.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.