• Title/Summary/Keyword: Construction portal

Search Result 149, Processing Time 0.026 seconds

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

A Study on Non-Facing Services of National Pension in the era of the 4th industrial revolution (4차 산업혁명 시대의 비대면 국민연금서비스에 관한 연구)

  • Min, Ki-chae;Lee, Kyu-sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.4 no.3
    • /
    • pp.139-147
    • /
    • 2018
  • This study starts with the consciousness of what should be the public pension service that meets the 4th Industrial Revolution era. To do this, we review the current status of non-facing services of domestic and foreign public institutions, and draw out implications for revitalizing non-facing services of the National Pension over the medium to long term. First, we reviewed the status of non-face-to-face service and the authentication method of the National Pension Service. Next, we reviewed the status of non-facing services in public pension and private agencies in the United States, the United Kingdom, Canada, and Australia. Based on the results of the analysis, we needs to analyze the impact of the 4th Industrial Revolution on the National Pension Service and extract future strategies, to expand channels of non-facing by business, to introduce PinTech as a non-facing authentication method, and to propose a unified service channel through the construction of an internet integrated portal. In the 4th industrial revolution era, it is possible to secure the connectivity of government portal for civil affairs and intelligence and automation introducing artificial intelligence robots.

A study on the characteristics for aerodynamics at high speed in railway tunnels - focused on the micro pressure wave (고속주행시 철도터널내 공기압 특성에 관한 기초연구 - 미기압(MPW)을 중심으로)

  • Kim, Hyo-Gyu;Choi, Pan-Gyu;Yoo, Ji-Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.249-260
    • /
    • 2014
  • When a train enters the tunnel at high speed, the pressure wave occurs. When this pressure wave reaches at the exit of tunnel, some are either emitted to the outside or reflected in tunnel by the form of expansion wave. The wave emitted to the outside forms the impulsive pressure wave. This wave is called 'Micro Pressure Wave'. The micro pressure wave generates noise and vibration around a exit portal of tunnel. When it becomes worse, it causes anxiety for residents and damage to windows. Thus, it requires a counterplan and prediction about the micro pressure wave for high speed railway construction. In this paper, the effects of train head nose and tunnel portal shape were investigated by model test, measurement for the micro pressure wave at the operating tunnel as well as numerical analysis for the gradient of pressure wave in the tunnel. As results, a method for predicting the intensity of the micro pressure wave is suggested and then the intensity of the micro pressure wave is analyzed by the tunnel length and the cross-sectional area.

Construction of Record Retrieval System based on Topic Map (토픽맵 기반의 기록정보 검색시스템 구축에 관한 연구)

  • Kwon, Chang-Ho
    • The Korean Journal of Archival Studies
    • /
    • no.19
    • /
    • pp.57-102
    • /
    • 2009
  • Recently, distribution of record via web and coefficient of utilization are increase. so, Archival information service using website becomes essential part of record center. The main point of archival information service by website is making record information retrieval easy. It has need of matching user's request and representation of record resources correctly to making archival information retrieval easy. Archivist and record manager have used various information representation tools from taxonomy to recent thesaurus, still, the accuracy of information retrieval has not solved. This study constructed record retrieval system based on Topic Map by modeling record resources which focusing on description metadata of the records to improve this problem. The target user of the system is general web users and its range is limited to the president related sources in the National Archives Portal Service. The procedure is as follows; 1) Design an ontology model for archival information service based on topic map which focusing on description metadata of the records. 2) Buildpractical record retrieval system with topic map that received information source list, which extracted from the National Archives Portal Service, by editor. 3) Check and assess features of record retrieval system based on topic map through user interface. Through the practice, relevance navigation to other record sources by semantic inference of description metadata is confirmed. And also, records could be built up as knowledge with result of scattered archival sources.

Design of Sedimentary Rock Slopes in River Diversion Works (가배수로 터널공사의 퇴적암 사면 안정화 설계)

  • Jee, Wang-Ruel
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.17-32
    • /
    • 1998
  • The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia, The power station will consist of a 210m height concrete faced rockfill dam. During the construction of the dam and the power facilities the Balui river has to be diverted by three diversion tunnels with a length of some 1,400m each. The inner diameter of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet and outlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four. defined Rock Mass Types (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each 'global' slope without any rock support and shotcrete system. In the second stage, it is calculated for each 'local'slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

Development of the Program Management System for Mega Project in Urban Regeneration (도시재생사업의 메가프로젝트 건설관리시스템 개발)

  • Hyun, Chang-Teak;Kim, Ju-Hyung;Park, Il-Soo;Yu, Jung-Ho;Son, Bo-Sik;Hong, Tae-Hoon;Seo, Yong-Chil;Lee, Sang-Bum;Kim, Hyoung-Kwan;Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.176-183
    • /
    • 2008
  • Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.

  • PDF

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

The Case of Measurement for Shallow Soil Tunnel with Pre-Supported Nail Method (저토피 토사터널에 적용된 선지보 네일공법의 시공 및 계측사례)

  • Seo, Dong-Hyun;Lee, Seung-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.11
    • /
    • pp.69-79
    • /
    • 2012
  • This pre-supported nail method is able to decrease ground displacements more than NATM because this method reinforces ground with grouted steels before tunnel excavation. Therefore this method has advantage of being able to increase the stability and workability. This study presents applicability of pre-supported nail method with case of site measurement for shallow tunnel composed with high groundwater level and unconsolidated soil, performs this research the mechanism of new supporting system is compared with the conventional existing supporting system in terms of soil reinforcement. NATM has characteristics that construction stage displacement of the apparent height difference is observed in the step of divided excavation processing. Otherwise it is analyzed that pre-supported nail method is not sensitive in the displacement problem of excavation processing in comparison to NATM. It is found that this method is very applicable in shallow depth tunnel such as portal area, tunnel in soil and weak zone without arching effect.

Precision Analysis of Geotechnical Information for the 3D Integrated Underground Space Map (3차원 지하공간통합지도 구축을 위한 지반정보 정밀도 분석)

  • Lee, Boyoung;Hwang, Bumsik;Cho, Wanjei
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.4
    • /
    • pp.5-12
    • /
    • 2017
  • Since 2000, the national geotechnical information DB has been constructed by Transport and Maritime Affairs (present Ministry of Land) and recently, it provides more than 210 thousands borehole informations through the geotechnical information DB portal systems. The initial project of underground space information computerization was begun in 2007, focusing on collecting the informations after then additional studies had been conducted to verify the precision and accuracy of collected informations in 2013~2014. In accordance with the recent initiation of the 3D integrated underground space mapping project, it is necessary to construct 3D image of the geotechnical information and evaluate the accuracy and precision of the information. Therefore, in this research, the basic information regarding the precision of the geotechnical DB is provided by kriging method and analysis of RMSE for the systematic 3D construction of geotechnical information. In addition, the elevation data errors of boring information are verified by analysis of elevation data such as boring information data and DEM data.

e-AIRS: Construction of an Aerodynamic Integrated Research System on the e-Science Infrastructure (e-AITS: e-Science 인프라 기반의 항공우주 공력통합연구 환경구축)

  • Kim, Jin-Ho;Yi, Jun-Sok;Ko, Soon-Heum;Ahn, Jae-Wan;Kim, Chong-Am;Kim, Yoon-Hee;Cho, Kum-Won
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.36 no.5
    • /
    • pp.428-437
    • /
    • 2008
  • e-AIRS, an abbreviation of ‘e-Aerospace Integrated Research System’, is a virtual organization designed to support the aerospace engineering processes in the e-Science environment. As the first step toward a virtual aerospace engineering organization, the e-AIRS intends to give a full support to aerodynamic research processes. Currently, the e-AIRS can handle both the computational and experimental aerodynamic researches on the e-Science infrastructure. In detail, users can conduct the full CFD(Computational Fluid Dynamics) research processes, request wind tunnel experiments, perform the comparative analysis between computational and experimental resultants and finally collaborate with other researchers using the web portal. The current paper will describe those functions and the internal architecture of the e-AIRS system.