• Title/Summary/Keyword: Construction planning

Search Result 2,712, Processing Time 0.032 seconds

THE PSANNING, CONSTRUCTION AND ADMINISTRATION OF AUTOMOBILES PARKING LOTS IN SHANGHAI (상해기동차사회정차장(고)적 규화, 건설여관리)

  • GE MING MING
    • Proceedings of the KOR-KST Conference
    • /
    • 1995.05a
    • /
    • pp.239-250
    • /
    • 1995
  • With speeding up the process of being international municipality, the gravity of lacking parking lots in Shanghai urban area, which directly blocks the traffic in the city, has been revealed. This thesis analyses present automobiles parking capability and forecasts the future's needs for the city. To solve the problem, the concept could be to expand parking areas in city center recently to relax the tention and to do thoughtful planning in the near future on the foundation of fully consideration the trend. The municipal government has to set up policy properly, amplify regulations, strenthern the administration and open up a path to raise founds. Berween road system administration which is dynamic and parking lot system administration which is static, there are a knot on macroscopic meaning and an interference as well. The coordination of these two systems would be reflested on the effects of whole municipal traffic adminisration. Basically, public parking lots are city's foundal facilities, just like roads, bridges, etc. The main problems now in Shanghai are large parking space demands, insufficient facilities, cheap parking expenses comparing with the cost of parking lots construcion and poor administration. According to the forecast on social economy development, there will be 580 thousand automobiles in Shanghai by the year 2000, and the amount of private cars will increase greatly. The frequency of automobiles going out will be 1.45 million per day. Public parking lots being able to afford 105 thousand units are needed. To satisfy the demands, the recent aim of planning should be speed up the parking lots construction, the planning objective in next period should be developing reasonably and exceed the demands properly. In order to realize the planning objective, the government has to formulate correct policy and amplify administration regulations. The government has to adopt both administration and economy means, including charging parking people reasonably, collect necessary taxes, bringing the parking lots planning into general municipality planning, opening up an effective path to raise founds, such as set up founds for parking lots construction, issue bonds and stocks, get loans at home and abroad, etc.

  • PDF

The flow of Temporary Facility Planning Information in High-rise Building Construction (고층건축공사에서의 가설계획 정보흐름)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.91-96
    • /
    • 2002
  • The purpose of this study is to present a systemized flow of temporary facility(TF) planning information. The current TF planning tends to be established by subjective decision making of field workers. Therefore TF planning needs more systemized information flow to provide a reliable schedule. The study was implemented through interview with experts for reliable TF planning. The main contents of the study are as follows; 1) TF planning process model(IDEF0) are established. 2) Various information flow diagrams proposed to support TF planning decision-making. The study recommends that, as a future research, the computer system be developed for application of the information flow.

Structure-From-Motion Approach to the Reconstruction of Surfaces for Earthwork Planning

  • Nassar, Khaled;Jung, Young-Han
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.1-7
    • /
    • 2012
  • The reconstruction of surfaces from unorganized point clouds can provide very useful information for construction managers. Although point clouds are generally created using 3D scanners, they can also be generated via the structure-from-motion technique using a sequence of images. Here we report a novel surface reconstruction technique for modeling and quantifying earthworks that can be used for preliminary planning, project updates and estimating of earthwork quantities, as well as embedded planning systems in construction equipment. The application of structure-from-motion techniques in earth works is examined and its advantages and limitations identified. Data from 23 earthwork excavation construction sites were collected and analyzed. 3D surface reconstructions during the construction phase were compared to the original land form. Similar experiments were conducted with piles of earth and the results analyzed to determine appropriate ranges of use for structure-from-motion surface reconstructions in earthwork applications. The technique was found to be most suited to pile of materials with volumes less than 2000 m3. Piles up to 10 m in height and with base areas up to $300m^2$ were also successfully reconstructed. These results should be of interest to contractors seeking to utilize new technology to optimize operational efficiency.

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

A Study on the Measures for Work Interference Reduction in Apartment Construction (공동주택 공사의 작업간 간섭 감소 방안에 관한 연구)

  • An Sung-Hoon;Kim Joon-Ho;Kang Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

AN APPROXIMATE COST ESTIMATING MODEL FOR CONSTRUCTION PROJECTS

  • Daehee Lim;Seung-hoon Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1242-1247
    • /
    • 2009
  • The sudden changes in the construction market and the progressively intensifying price wars have amplified the importance of the construction cost estimation in the initial and planning phases of construction projects. However the methodologies and process of estimating construction cost in the planning and design phase are not standardized in the domestic market, in contrast to the markets of more developed countries. Therefore this paper proposes a new approximate estimation model to be used from the initial stages of construction projects. This methodology that extracts, modifies and synthesizes comparable elements of previous cases. This will introduce the foundation for the implementation of systems with improved usability and applicability.

  • PDF

Construction performance assessment framework by means of construction simulation for earthwork operations

  • Kim, Yujin;Noh, Jaeyun;Ko, Yongho;Lee, Jaewoo;Han, Seungwoo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1194-1201
    • /
    • 2022
  • The existing literature has witnessed the importance of productivity assessment and deducing factors affecting it. However, yet many models have shown limitations in practical applications in actual construction sites for process planning due to uncertainty and lack of data. This research presents a productivity assessment and database generation framework using simulation and compares the results with RSMeans to derive appropriate equipment combinations alternatives for earthwork operations. Data of 15 different conditions was collected from 5 different construction sites. Prediction accuracy above 90% were achieved for the simulation models with average error rate of 7.4%. The construction productivity assessment framework presented in this study is expected to be highly applicable to operation planning for earthwork operations.

  • PDF

An Empirical Study on the Applicability of Growth-share Matrix in the Construction Industry

  • Lee, Seulbi;Park, Moonseo;Lee, Hyun-Soo;Jang, Youjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.210-212
    • /
    • 2015
  • The growth-share matrix is a portfolio planning tool developed by the Boston Consulting Group (BCG) to assist competitive positioning in the international market including those in the construction industry. This matrix is helpful in balancing the firm's cash-flow, and it can suggest strategic directions for each business unit. However, its effectiveness and applicability have long been debated in the academic field due to the complex and unique industrial context of construction. To solve the dispute, this research clarifies the applicability of theories underlying the growth-share matrix to the construction industry. Empirical research based on actual financial data of Korean construction firms is adopted for the statistical analysis including one-way analysis of variance and correlation analysis. The results of this research show that empirical findings on the relationship between performance variables. In this context, this research can provide important insights on the concept of portfolio management in the construction industry.

  • PDF

DESIGN AND USE OF BUILDING INFORMATION MODELS FOR PREPLANNING COMMERCIAL BUILDING CONSTRUCTION ACTIVITIES

  • Thomas M. Korman
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.274-278
    • /
    • 2013
  • Over the past several years, the building codes that govern commercial building construction have become increasingly prescriptive in nature, specifying detailed information related to the design and installation of the systems, while offering no reasoning behind their prescriptive measures. For example, metal stud framing is commonly used in commercial building construction to create bearing walls and non-bearing partition walls. BIM provides a powerful platform for developing and implementing "pre-planning" tools and methods to facilitate both engineering and administrative controls during construction. This paper discusses the use of BIM to enhance constructability for commercial building construction activities, specifically metal stud framing. Using specific real-world examples this paper demonstrates ways that BIM can be used to foresee potential construction issues and motivates and informs future uses of BIM technologies

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF