USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

대공간 지붕 철골공사의 시공계획 중점관리항목 도출 (Deriving of Critical Factors for Construction Planning in Large Span Roof Construction)

  • 이명도
    • 한국공간구조학회논문집
    • /
    • 제18권1호
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰 (A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage)

  • 조성민;조성희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.1-12
    • /
    • 2014
  • Construction management has been suffering from many problems, which need to be solved or better understood. Most of construction projects have not achieved efficiency as expected. In this context, waste was also considered as a problem of efficiency decrease, and poor production planning was considered as a cause for waste. This study was conducted on the basis of waste concepts and production planning processes based on the philosophies of Lean Construction. A survey to find out the relationship between them was carried out through questionnaire, which was answered by experienced people in construction projects. The results have shown that frequency of wastes occurrence is quite high, and production planning processes are superficially performed in construction phase. There is a significant negative relationship between production planning and waste occurrence (r = -0.262). Weekly Work Plan (WWP) is the most dominant plan for waste control with seventeen in total of nineteen waste factors, and phase plan is the most dominant plan for two remaining waste factors. A case study was adopted to validate the relationship between production planning and waste occurrence. The results showed that the better the project was planned, the fewer the waste would occur on construction sites.

BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

도로 공사의 시공계획을 위한 GIS의 적용 (GIS Application for Planning Roadway Construction)

  • 강상혁;서종원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.565-568
    • /
    • 2003
  • 도로 공사의 시공계획을 위해서는 설계, 공법, 물량, 단가, 생산성 등에 대한 다양한 형태의 많은 정보가 필요하다. GIS와 같은 통합된 환경의 매개체를 이용하면 공간 및 비-공간 정보의 효율적인 통합 관리가 가능할 수 있다. 이에 본 논문에서는 시공계획 시 설계 단계에서 생성된 정보의 활용을 극대화 하고자 GIS를 적용하였다. 특히 GIS가 제공하는 설계된 도로 및 주변 환경에 대한 공간 분석(Spatial Analysis)과 시각화(Visualization)의 기능을 이용하면, 도로 공사 시공계획 시 계획자의 판단에 큰 도움을 줄 수 있다. 본 논문에서 제안하는 도로 공사 시공계획 시스템의 두 가지 중요한 특징은 설계와 시공 정보에 대한 통합기능과 GIS상에서 도로 시설물에 대한 설계 데이터의 실시간 모듈화 기능에 근거한 계획자와의 상호 작용식 계획 기능으로, 도로 사업을 구성하는 도로, 교량, 터널 시설물 중 도로부의 시공에 대해 적용해 보았다.

  • PDF

DEVELOPING U-CITY MARKET SCENARIOS THROUGH A SCENARIO PLANNING APPROACH

  • Yong-Ho Kwon;Jae-Jun Kim;Suk-Hee Han;Jin-Sik Kim;Yoon-Sun Lee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.459-468
    • /
    • 2007
  • The u-City construction project has become a hot topic in the construction market because it seems economic value-added field for construction firms. However, construction firms don't willingly participate in the u-City construction market because environments of the future business for the u-City are very uncertain. Scenario planning is a very powerful method in managing this uncertain planning situation and is based on scenarios that help each enterprise appropriately adapt itself to its own business environments. Therefore it is based on the main principles of systems thinking and multiple futures. For the purpose of dealing with such uncertainties, this paper attempts to develop the possible market scenarios of the u-City construction market in S.Korea through a scenario planning approach. From this perspective, we considered various aspects of the u-City construction such as market demands, technology development, policy level and management environment. After considering the relevant issues, we identified the main trends and key uncertainties. Finally, we developed three coherent u-City construction market scenarios. Construction firms can use these scenarios as a basic reference for market analysis and business strategy. Therefore, this paper is able to enhance the participation of construction firms in the u-City construction market.

  • PDF

Critical Barriers to the Practice of Effective Cost Planning in the Ghanaian Construction Industry

  • Kissi, Ernest;Adjei-Kumi, Theophilus;Badu, Edward
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.8-15
    • /
    • 2016
  • Cost planning practices in the construction industry worldwide has gained much popularity in recent times due to economic recession and stringent measures that various procurement laws prescribe in most developed and developing countries. Nevertheless, these practices in developing countries such as Ghana are constrained with the existence of critical barriers that render them non-effective and hence, accounting for the numerous abandonment of both private and public projects. Consequently, this study was enunciated with the aim to examine the critical barriers to the practice of effective cost planning in the Ghanaian construction industry. Through an in-depth literature review and a pilot survey, questionnaires were designed and administered to quantity surveyors. Data generated from the field survey was subjected to principal component analysis. The findings of the study revealed weak cost planning knowledge base, poor cost databases and understanding, inadequate designs and planning and external conditions are the major barriers to cost planning practices in the Ghanaian construction industry. The need for this study cannot be doubted since it provides an insight for experts in the construction industry on the barriers of the practice of cost planning in the industry. The awareness of these barriers will therefore facilitate efficient and effective efforts to resolve them. A future study is thereby proposed by this study to explore effective cost planning practices in the Ghanaian construction industry that will ensure private and public stakeholders get value for their money invested.