• 제목/요약/키워드: Construction period

검색결과 2,714건 처리시간 0.031초

AN ANALYSIS ON THE LABOR/CAPITAL PRODUCTIVITY OF THE CONSTRUCTION INDUSTRY

  • Minsoo Choi;Jinu Kim;Moohan Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.968-973
    • /
    • 2005
  • The purpose of this study is to clarify the reality of labor and capital productivity in the construction industry through an industry-level approach and to analyze the relationship between labor and capital productivity using a Cobb-Douglas production function. According to the research results, the construction industry has shown a very high capital productivity, while labor productivity has kept up a low level during the 1980s and 1990s. The reason was because of the lack of skillful construction workers and the decrease of capital. Meanwhile, the construction productivity has greatly increased since 2000 when there was no change in wages. This was because of a large inflow of low-wage foreign workers while the amount of value added has dramatically increased due to the liberalized sale price of apartment buildings. According to the analysis by the Cobb-Douglas production function, the elasticity coefficient of V/L to K/L in the construction industry had decreased from 1.1663 in the 1st period(1971-1988) to 0.4465 in the 2nd period(1989-1997), and to 0.1664 in the 3rd period(1998-2003). Such a result means that the allocation of labor has gradually increased while the allocation of capital has decreased. Moreover there was a big increase in allocation of labor after 1998 due to the excessive deterioration of capital. In conclusion, in order to raise the construction productivity and to avoid labor-intensive production methods, investment for capital should be more increased. In particular, new machinery and equipment that can actually substitute human labor in construction sites should be more developed and applied to construction sites.

  • PDF

석괴댐의 축조 중 내부 침하 거동 평가 (Evaluation of Internal Settlement of Rockfill Dam under Construction)

  • 서민우;김용성
    • 한국농공학회논문집
    • /
    • 제52권4호
    • /
    • pp.45-52
    • /
    • 2010
  • The purposes of this research are to analyze the internal settlement behavior of Concrete Faced Rockfill Dam (CFRD) typed 'D dam' and to evaluate the stability of the 'D dam' during dam construction using internal settlement measurements and results of numerical analysis. The field measurements were obtained during dam construction period. The numerical analysis was also carried out for the same construction period. The numerical analysis focused mainly on prediction of stress and displacement behavior of 'D dam' during dam construction stage using input parameters obtained from laboratory tests, i.e. large triaxial tests. The behavior of 'D dam' was evaluated to be stable from comparing the results of field measurements and numerical analysis. A simple empirical equation is also presented to predict final settlement at the completion of dam construction, using settlement measurement monitored during dam embankment.

지중변전실 하부통과를 위한 터널설계 및 시공사례 (A Case on Design and Construction of Tunnel for Under Passing an Underground Transformer Substation)

  • 정동호;문상조;김선홍;이광제;석진호
    • 화약ㆍ발파
    • /
    • 제19권1호
    • /
    • pp.11-18
    • /
    • 2001
  • This is a case history on design and cnostruction of tunnel for under passing an underground transformer substation. The original construction plan was cut & cover method to avoid blasting vibrations and displacements of facilities during the construction stages. But this plan was changed to tunnel because of the difficulties from construction period, cost and the required relocation site. As a results of tunnel construction, the relocation of transformer substation and replacements of transmission cables were not necessary. Therefore about 10 months of construction period and 3.5 billion wonts of construction cost were saved. Additionally, quantitative criterion for blasting was provided through the results of blasting vibration analysis.

  • PDF

원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석 (Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant)

  • 송효민;신윤석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

사우디 등 중동지역의 패시브형 PC모듈러 주택개발 방안 제안 (A Study on the Proposal of Passive Precast Concrete Modular Housing Development Plan in the Middle East such as Saudi Arabia)

  • 임석호;정준수;양현정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.121-122
    • /
    • 2023
  • Existing modular research has been mainly focused on S (shelter structure) and I (infill interior finishing material), and considerable research has been conducted, and the results are being proposed. However, in the case of the rest (exterior materials and windows, etc.), existing construction methods and materials are borrowed, and supporting hardware members and insulation materials are constructed on site, which acts as a factor hindering overall shortening of the construction period. That is, since the advantages and characteristics of modularity cannot be utilized in the absence of modular cladding, manufacturing of cladding is required. Therefore, it is necessary to develop a cladding system that can drastically reduce the construction period in factories while considering the structural characteristics of PC modulars.

  • PDF

작업지연원인 기반 작업여건분석 체계 (Cause of Schedule delay-based Constraints Analysis Process)

  • 송지원;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.637-642
    • /
    • 2007
  • 건설공사 한 프로젝트의 전체공기는 개별 작업들이 수행된 날짜의 합이라 할 수 있다. 개별 작업들에서 지연이 발생할 경우 전체 공기 또한 늦어지기 마련이다. 이러한 개별 작업의 계획상에서 작업이 수행될 확률을 높인다면 프로젝트의 공기달성 확률 또한 높아지게 될 것이다. 따라서, 계획상의 작업 실행여부 확인을 위하여 건설 생산프로세스에서 각 작업의 수행을 저해하는 제약요인을 도출하여 작업여건분석을 한다. 작업여건분석을 통해 저해요인 사전 제거와 작업간의 상호의존성을 파악으로 작성된 개별 작업계획들의 실행 가능성 확임함으로써 공사전체의 공기지연을 방지하는 체계를 구축하고자 한다.

  • PDF

Adjudication in Australia: A Study of Adjudication Activity in New South Wales for 2013/14

  • Brand, Michael C.;Kim, Jinu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.396-400
    • /
    • 2015
  • The Building and Construction Industry Security of Payment Act 1999 (NSW) (the NSW Act) is a unique form of statutory regulation for the building and construction industry, which gives virtually all industry participants a statutory right to, and a means of recovering, payments for work done under a construction contract. The research aim is to examine current trends in adjudication applications and determinations under the NSW Act. The data used for this study was the collected by the NSW Office of Finance & Services as part of a regular reporting regime for the period from 1 July 2013 and ending on 30 June 2014. With just over 817 adjudication applications having been made over the 2013/14 period, the data indicates that adjudication is being frequently utilized by stakeholders in the NSW building and construction industry as a means of progress payment recovery. Adjudication is proving to be a popular choice for those making claims of less than AU$250,000. Claimants were awarded about 36% of the total of claimed amounts and claimants are generally successful at adjudication in terms of the proportion of the claimed amounts determined in their favour. This is particularly so in relation to claims of less than $100,000, which represents about 70% of the total applications made over the reporting period. The data indicates that adjudication fees are generally modest enough to conclude that adjudication provides claimants across all claim ranges with a relatively inexpensive means of having disputed progress payments determined by an independent adjudicator.

  • PDF

발파 굴착에 의한 주방식 지하구조물의 굴착공기 분석 연구 (A preliminary study on the excavation sequence of a room-and-pillar underground structure by the drill-and-blast method)

  • 이철호;현영환;송준호;장수호
    • 한국터널지하공간학회 논문집
    • /
    • 제17권6호
    • /
    • pp.605-614
    • /
    • 2015
  • 주방식 지하구조물은 여러 개의 암주의 룸으로 구성된 격자 형태의 구조물로 굴착순서에 따라 주방식 지하구조물의 시공성과 경제성이 좌우될 수 있다. 본 연구에서는 주방식 지하구조물의 굴착공정에서 중요하게 다뤄질 수 있는 발파굴착 공정을 장비 운영과 현행 발파 규정 및 건설공사 표준품셈에 근거하여 검토하였다. 굴착공법으로는 점보드릴을 이용한 발파공법을 가정하였으며, 기존연구에서 제시한 가로 세로 순차시공방식으로 검토하였다. 주방식 지하구조의 계획부지 크기에 따라 굴착공기와 장비운영 등을 고려하여 전체 굴착공정을 예상할 수 있었으며 막장운영 계획에 따라 운영가능한 장비수를 고려하여 전체 굴착공기를 예상할 수 있었다.

프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구 (An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period)

  • 조지훈;조흥구
    • 한국건축시공학회지
    • /
    • 제9권6호
    • /
    • pp.131-139
    • /
    • 2009
  • 극 초고층 공사에서 합리적인 타워크레인 선정이 필수적이나 현장 실적 자료의 부족과 주관적인 경험에 의한 계획 수립, 체계적인 기준 부재 등으로 계획상 오류나 비효율성이 크다. 특히 극 초고층의 특성 중의 하나인 높이에 따른 영향 요소들에 대한 분석이 미비하여 단순히 장비의 기계적 특성을 가지고 양중 시간을 예측하고 있는 실정이다. 본 연구에서는 양중 계획 시 담당자가 활용하기에 용이하고 체계적인 양중 분석이 가능한 시스템을 개발 하였으며, 현존 최고층인 버지 두바이의 자료를 활용하여 가변형 통계 모델을 개발하였다. 또한 층당 적정 공기 여부를 선정한 장비를 바탕으로 검토 및 의사결정을 가능하게 함으로써 극 초고층 공기 산정 방법의 패러다임을 전환 시켰다는 의미도 있다.

염해를 입은 RC 구조물의 최적 보수주기 산정 기법에 관한 연구 (Estimation of Optimum Maintenance Cycle for the Chloride Damaged RC Structure)

  • 윤선영;이한승
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.235-236
    • /
    • 2010
  • Since many structures in the sea environment are damaged by chloride, appropriate repair strategy is required. Therefore in the paper, optimum period for the RC structure's repair is calculated with consideration of economic efficiency. Moreover, when the concrete members are repaired with the other material such as polymer mortar forr section restoration, their expected service life also calculated to predict more accurate repair period during the life span.

  • PDF