• Title/Summary/Keyword: Construction of evaluation

Search Result 5,403, Processing Time 0.033 seconds

A Study on the Behaviour of the Station Structure due to Adjacent Construction (근접시공에 따른 정거장구조물 거동특성에 관한 연구)

  • Chung, Jeeseung;Kim, Manhwa;Lee, Sungil;Kim, Hongjoo;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.55-64
    • /
    • 2016
  • Recently, it has been made many adjacent construction of inter-facility by the expansion of urban infrastructure facilities using the underground space. The complaints relating to the stability of the facility by adjacent construction is common. In this study, it was conducted for the subway line 5 Gimpo airport station structure in the upper Gimpo urban railway to determine the behavior characteristics of station structure according to adjacent construction. It was performed evaluation of the safety zone and excavation method for station structure. And after a review of damage evaluation, track irregularities and structural calculation by using a numerical analysis, stability of the station structure according to adjacent construction was evaluated to be secured. This study is expected to be used as basic data in advance if you need to review the effects of nearby structure according to adjacent construction.

Construction Performance Evaluation of Steel Staircase Systems based on Construction Simulation CYCLONE Techniques (건설시뮬레이션 사이클론 기법을 활용한 시스템 철골계단 공법의 현장적용성 평가)

  • Lee, Jeong-Hun;Lee, Kyung-Suk;Kim, Hyun-Mi;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.19-26
    • /
    • 2010
  • Advanced construction technologies have been rarely applied to practical construction operations on jobsites due to a lack of quantified evaluation data of the performance of such technologies. The basic objective of this study is to suggest a feasible way for the evaluation of the performance of new technologies based on construction simulation techniques, which have been frequently used in academic research for productivity estimation. Steel staircase systems were selected as the new technology to be investigated. The simulation was implemented in various ways, such as one staircase to six staircases on a floor. The simulation results provided in this study suggest that planners are able to make a fundamental decision on the use of targeted new technology with the estimated performance data (productivity and unit costs). These findings also indicate that a simulation technique could be one of the methods appropriate for use as a planner's decision-making tool.

A Study on Competency Evaluation Item of Design Phase VE Team (설계VE팀의 역량 평가항목에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.797-800
    • /
    • 2007
  • Value Engineering(VE) is being applied as an useful tool to eliminate the waste of cost and noneffective factors previously in construction projects. Ministry of construction and transportation' has been accordingly enforcing extensionally design phase VE to the construction costing more than 10 billion won, an importance of design phase VE. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, try to find out competency factors of design phase VE to enforce a competency of VE team as a basic database for developing a check list, and estimate weight. For the result, find out a competency evaluation item and organize as a team knowledge, a team work skill and a team attitude. Perform a first survey to verify a reliability and propriety regarding the found competency evaluation, perform the second survey competency as to evaluation item of the found 1, 2, 3 class and then estimate the weight by AHP.

  • PDF

A Study on the Evaluation of the Environmental Impact of Energy Usage in Construction Sites (건설현장 내 에너지 사용량에 따른 환경영향 평가에 관한 연구)

  • Lee, Chung-Won;Tae, Sung-Ho;Jang, Hyeong-Jae;Lim, Hyo-Jin;Kim, Hyeon-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.119-120
    • /
    • 2022
  • As the seriousness of the climate crisis is emphasized, movements to solve it are becoming active. In Korea, efforts to reduce environmental impacts across all industries are being strengthened through the Framework Act on Low Carbon Green Growth. The construction industry predicts the environmental impact of buildings during the entire life cycle, but in the construction process, there is a difference in energy usage depending on the amount of input, and it is difficult to predict the environmental impact if data cannot be collected. Therefore, this study evaluated the environmental impact of energy usage in the apartment construction process as part of the study on predicting and reducing the environmental impact of the construction process of the construction site. To this end, the environmental effects of buildings were set as global warming, resource consumption, and ozone layer effects, and the environmental effects of the actual energy use in the case were evaluated. In addition, based on the evaluation results, the characteristics of the input energy usage were compared and analyzed.

  • PDF

A Basis Study on the Influential Factors Analysis of Post-Evaluation Item of Performance Measurement System in Construction Project (건설공사 성과측정시스템의 사후평가항목 영향요인 분석에 대한 기초연구)

  • Lee, Eun-Ji;Ha, Hee-Yoon;Choi, Jin-Wook;Jung, Kyung-Taek;Park, Chi-Ho;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.347-350
    • /
    • 2006
  • Today the domestic construction industries are changing. The bigger, higher and more professional are gradually the construction industries, the faster does the fusion into the other industries also undergone. It is gradually needed to estimate the process of the project in the construction industries through this tendency. Consumers or the owner gradually reify their needs and it is essential for an objective appraisal standard to estimate the accomplishment of the project because its level is raised. In this study the problem is understood through the analysis on the existing system of construction industries and it is indicated to new performance measurement system in construction project through the analysis on the influential factors including the qualitative analysis such as consumer satisfaction.

  • PDF

Competitiveness Evaluation Result of Construction Company by country in 2017 (2017년도 국가별 건설기업 역량 평가)

  • Han, Jae-Goo;Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.288-289
    • /
    • 2018
  • The purpose of this study is to provide the basic data of government policy by evaluating the capacity of construction companies by country. As a result, Korea ranked 7th in construction competitiveness, 13th in design competitiveness, and 7th in price competitiveness among the 20 countries to be compared. As a result of evaluating the competitiveness of construction companies by country, Korea ranked 7th overall.

  • PDF

Competitiveness Evaluation Result of Construction Company by country in 2018 (Focused on the Architecture and Civil Engineering Sector) (2018년도 국가별 건설기업 역량 평가 (토목,건축분야 중심))

  • Han, Jae-Goo;Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.220-221
    • /
    • 2019
  • The purpose of this study is to provide the basic data of government policy by evaluating the capacity of construction companies by country. As a result, Korea ranked 13th in construction competitiveness, 20th in design competitiveness, and 7th in price competitiveness among the 20 countries to be compared. As a result of evaluating the competitiveness of construction companies by country, Korea ranked 15th overall.

  • PDF

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

The Visibility Evaluation of the Wheel Loader by Comparing Prototype and Computer Simulation (휠로더의 시계성 평가: 프로토타입과 컴퓨터 시뮬레이션을 이용한 방법)

  • Jung, Doo-Ho
    • Journal of the Ergonomics Society of Korea
    • /
    • v.29 no.2
    • /
    • pp.249-255
    • /
    • 2010
  • The visibility evaluation is significant for the development of construction equipment. The visibility evaluation follows the standards of ISO 5006, ISO 14401-1, and ISO 14401-2. The evaluation contains the operator's visibility and the visibility of rear-view mirrors. The operator's visibility includes the visibility test which requires the recognition of the rectangular line surrounding the machine by one meter and the circle with a 12 meter radius. This study describes the two evaluation processes for the development of the wheel loader. The first process is the light bulb shadow test by using a prototype wheel loader. The second process is based on computer simulation in virtual space. The advantages and disadvantages of computer simulation process are investigated.