• Title/Summary/Keyword: Construction of complex

Search Result 1,942, Processing Time 0.027 seconds

A Design for the Symbol Park and the Waterfront Park for the Second Stage Development in the Eastern Rear Complex of Gwangyang Harbor (광양항 동측배후단지 2단계 사업지구 상징공원 및 수변공원 설계)

  • Hong Hyoung-Soon;Kim Do-Kyong;Jeong Han-Ho
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.3 s.116
    • /
    • pp.104-119
    • /
    • 2006
  • The eastern rear business complex of the Gwangyang Harbor (second stage) has undergone the 'alternative bid' process by which a construction company is selected based on their suggestions for an alternative plan and the bid for the construction expenses is based on the previously completed original plan, thereby implicitly accepting the arrangement and scale of the park which was presented in the original plan. It is possible, however, that the concept and plan of each park needs to be approached in a new way within the extent of given design guidelines. This study focuses on the alternative plan process and the Symbol Park (the second neighborhood park) and Waterfront Park (the third neighborhood park) among the five neighborhood parks in the eastern rear business complex (second stage). These two parks provide scale and function for the structure of the park and greenways system at the eastern rear complex. The neighboring waterway is a significant resource for emphasizing the pre-development features of the site. The alternative plan process focuses on determining the resources for the park's plan based on the environmental analyses of the site and utilizing the results. That is, through an analysis of the current state, all available resources are determined and the facilities and activities are derived based on these results. By this, Symbol Park and Waterfront Park reflect the regional features of the eastern rear complex, and these parks will feasibly perform the role of the region's key parte. The limit of this study is the fact that there is no chance for landscape architecture to actively play a role in the creation of the master plan, land utilization plan, and plan for the complex. Therefore there is a problem that the function scale and location of the park are not distributed appropriately in the rear complex. Also the plan for protecting the waterway's shore, a significant resource, only considers the structural stability of the engineering works, degrading the visual and ecological quality. These experiences will be used as a case for further designing the industrial complex and for the resulting park plan.

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

Analyzing Impacts of Regional Characteristics to Industrial Complex Employment in South Korea (우리나라 산업단지 고용에 미치는 지역적 특성 분석)

  • Kim, Geunyoung
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.4
    • /
    • pp.510-518
    • /
    • 2018
  • Purpose: The objective of this research is to analyze the effects of industrial complex sites to manufacturing business of South Korea. Method: This research first investigates previous relative studies for employment factors of industrial complex sites. Second, this research identifies employment decision factors of industrial complex sites by applying the two-stage ordinary least squares method to the Korea Industrial Complex Directory and the census data on establishments published by the Statistics Korea. Third, this research provides findings and policy recommendations based on study results. Results: The number of major companies, production quantity, and diversity of manufacturing have positive impacts to employment of industrial complex. The ratio of foreign workers, the number of universities and colleges, and the fiscal self-reliance ratio are also important to employment of industrial complex. Conclusion: The employment enhancement policy of industrial complex should consider regional characteristics as well as infrastructure of industrial complex.

Improvement Plan for Connecting Form of PC Member -Focused on Apartment Buildings- (PC부재의 접합부 거푸집의 개선방안 연구 -공동주택을 중심으로-)

  • Kim, Seon-Hyung;Choi, Jae-Hwi;Kim, Sun-Kuk;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.9-12
    • /
    • 2010
  • Conventional apartment building projects have favored wall slab structure for the ease of construction and economic viability. However, wall slab structure, consisting of bearing walls, makes remodeling a difficult challenge. In addition, as the amendment to the Building Act in November, 2005 incentivized easy-to-remodel Rahmen structure design for apartment building in terms of floor area ratio and the number of stories, were are seeing more use of PC construct method in apartment building projects gradually. However, PC construction method requires complex connections between beams and columns, making it difficult to install and remove formwork. Furthermore, it is not possible to reuse forms after removal, generating lots of construction wastes, and it is necessary to install new forms again when the size of connection changes in line with modification of column cross-section. Researchers in Korea and elsewhere in the world have focused on structural performance of connection in PC construction method, with little attention to alternative approaches to improving connection forms for PC construction method. Accordingly, this research aims to study an approach to improving connection forms for PC construction method.

  • PDF

Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM) (DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안)

  • Hyun, Hosang;Lee, Hyun-soo;Lee, Jeonghoon;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.2
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

A Study on the Selection and Stability of Slings and Lugs of Mobile Cranes (이동식 크레인의 슬링.러그 선정 및 안정성 검토 연구)

  • Kim, Sun-Kuk;Seo, Jong-Min;Ho, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.164-174
    • /
    • 2008
  • As buildings become larger, higher and more complex in most construction sites, construction projects have to deal with transportation of more materials, labor and equipment, necessitating more use of construction equipment. Notably, in the high-rise building and plant construction projects mobile cranes are adopted more frequently among different types of construction machinery, which also results in serious industrial accidents relating to the use of crane. To reduce serious industrial accidents involving cranes, researches on its stability is in need. The research herein aims to study how to select sling and lug of mobile crane and review its stability. The research outcomes herein will make considerable contributions to selecting mobile cranes efficiently and ensuring their stability.

Evaluation of Performance Measurement System Alternatives for Construction Companies (건설기업에 적합한 성과측정시스템/Framework의 대안 평가)

  • Kim Ki-Hyon;Yu Il-Han;Shin Dong-Woo;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.398-403
    • /
    • 2004
  • Construction companies have been required high technique and integration of management. Because they not only have got high competition, variation of customer's demands, social and economical changes but also more complex and specialization. Construction companies require performance measurement to exclude inefficiency and be aware of their business performance level, but domestic construction industry does not have adequate performance measurement system like as manufacture industry or business administration. So this paper evaluate of performance measure system alternatives for construction companies.

  • PDF

Preliminary construction of a chimeric cellulose operon containing two structural genes coding for CMCase and cellobiase

  • 이동석;황인규;이백락;박무영
    • Proceedings of the Korean Society for Applied Microbiology Conference
    • /
    • 1986.12a
    • /
    • pp.524.1-524
    • /
    • 1986
  • CMCase, a member of cellulose decomposing enzymes, hydrolyze cellulose up to cellobiose. Cellobiase splits cellobiose to glucose units. Therefore, a linkage of the twogenes coding for CMCase and cellobiase on the same plasmid is needed to produce a cellulase complex which can produce glucose from cellulose. A genetic operon in which the two structural genes are under the control of a single promoter would be ideal for this purpose. The present report is on the linking of the two cellulase genes in one plasmid as a preliminary step of the operon construction.

  • PDF

A Study on the Utilization of Industrial Waste to Improve the Durability of Base Concrete (바탕콘크리트 내구성 향상을 위한 산업폐기물 활용에 관한 연구)

  • Kim, Dae-Geon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.107-108
    • /
    • 2022
  • This study aims to solve environmental problems by reducing complex degradation and recycling industrial waste by utilizing waste fibers and blast furnace slags, which are industrial by-products. In addition, it is intended to secure long-term durability to reduce cracks. To this end, the disadvantages of fiber-reinforced concrete are to solve the problem of lowering liquidity and ensuring curing time, and to find the optimal combination when waste fibers and blast furnace slag are used together.

  • PDF

Building a Big Data Platform Using Real-time Wearable Devices and Cases of Safety Accidents in KOREA

  • LEE, Ki Seok;CHOI, Youngjin;LEE, Kyung-cheun;SHIN, Yoonseok;YOO, Wi Sung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.375-381
    • /
    • 2022
  • Safety accidents are of concern during construction projects, even given the recent innovations in digital technologies. These projects remain focused on overcoming specific and limited applications on construction sites. For this reason, the development of an inclusive safety management system has become crucial. This study aims to build a Big Data platform to inform decisions on how to proactively eliminate worker hazards on construction sites. The platform consists of about 100,000 real records and a real-time monitored database featuring various safety indices, such as workers' altitudes, heart rates, and fatigability during construction, which are determined through various wearable devices. The data types are customized and integrated by a research team in accordance with the characteristics of a specific project using hypertext transfer protocol (HTTP). The results can be helpful as efficient tools to ensure successful safety management in complex construction situations. This study is expected to provide three significant contributions to the field, including real-time fatigability analysis and tracking of workers on-site; providing early GPS-based warnings to workers who might be accessing dangerous spaces or places; and monitoring the workers' health indices, based on details from 100,000 cases.

  • PDF