• Title/Summary/Keyword: Construction of airport

Search Result 196, Processing Time 0.027 seconds

A study about the application of GSIS on Airport site selection (공항입지선정(空港立地選定)에 있어서 GSIS의 활용(活用)에 관(關)한 연구(硏究))

  • Jeong, Seung-Hyeon;Lim, Seoung-Hyeon;Kim, Tea-Geun;Cho, Gi-Sung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.5 no.1 s.9
    • /
    • pp.27-40
    • /
    • 1997
  • Recently, with the demand for airservice increasing and localization accelerating, airport construction is booming. However, in the case of an unsuitable airport site selection, it might cause a reduction in airport service and a decrease in airport demand. Thus, it is necessary to construct a representative airport and choose a suitable site selection method for economical and efficient airports in order to make the utmost use of airport functions. In this study, GSIS was used to select the airport site and applied to case study areas. GSIS could present a new method for efficient and scientific analysis in airport site selection including various factors over an extensive area. The use of both, the paired comparison method and the delphi method, could improve the objectivity of analysis results in the process considering the relative weight grade of data and priority order of analysis factors, used in airport site selection.

  • PDF

Analytic Hierarchy Research on Site Selection to Construct Airfield to Contribute to Improve Aviation Safety Focusing on Song-Po Airfield (항공안전 증진을 위한 경비행장 건설에 따른 입지선정 AHP(Analytic Hierarchy Process) 연구 - 송포 비행장을 중심으로 -)

  • Sang Yong Park
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.31 no.3
    • /
    • pp.71-78
    • /
    • 2023
  • To minimize the occurrence of aviation accidents in the post-COVID, continuous flight training is crucial. However, the current infrastructure of domestic airports and airfields is insufficient to prepare for and respond to accidents, and there is a need for sufficient facility capacity. Therefore, this study examines the construction of a regional airport to minimize aviation accidents and selects factors necessary for determining the site location. Among the 11 selected factors, six were considered the most important site selection factors, including noise issues, weather conditions, obstacle limitations, environmental issues, airspace conditions, and facility usability. Applying these factors, an analysis was conducted on the Songpo area of Sacheon City, Gyeongsangnam-do. Based on a comprehensive review, it can be concluded that the Songpo area is a suitable choice for a regional airport due to its excellent transportation environment, consideration of noise and environmental issues with the residential population, and other factors. Furthermore, the development of the aviation industry is expected to bring about an increase in tourism and economic benefits, and it is anticipated to make a significant contribution to the domestic aviation industry along with the construction of the currently under-construction Ulleung Airport.

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

Air Passenger Demand Forecasting and Baggage Carousel Expansion: Application to Incheon International Airport (항공 수요예측 및 고객 수하물 컨베이어 확장 모형 연구 : 인천공항을 중심으로)

  • Yoon, Sung Wook;Jeong, Suk Jae
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.4
    • /
    • pp.401-409
    • /
    • 2014
  • This study deals with capacity expansion planning of airport infrastructure in view of economic validation that reflect construction costs and social benefits according to the reduction of passengers' delay time. We first forecast the airport peak-demand which has a seasonal and cyclical feature with ARIMA model that has been one of the most widely used linear models in time series forecasting. A discrete event simulation model is built for estimating actual delay time of passengers that consider the passenger's dynamic flow within airport infrastructure after arriving at the airport. With the trade-off relationship between cost and benefit, we determine an economic quantity of conveyor that will be expanded. Through the experiment performed with the case study of Incheon international airport, we demonstrate that our approach can be an effective method to solve the airport expansion problem with seasonal passenger arrival and dynamic operational aspects in airport infrastructure.

A Test Compacted Construction for Subgrade in the 3rd Runway of the 2th Incheon International Airport Construction Area using Crushed Stone (인천국제공항2단계 제3활주로 부지에서 파쇄암을 이용한 노상 시험다짐 시공)

  • Kim, Jong-Kuk;Son, Hyung-Ho;Kim, Young-Ung;Kim, Yong-Cheol;Kim, Dong-Chul;Kim, Yeon-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.507-514
    • /
    • 2005
  • In this construction case study, Crushed stone under 100mm diameter was carried out a test compacted construction for subgrade in the 3rd. runway of the 2th Incheon International Airport Construction area. Conforming to specification needs a minimum rolling compacted number 10 for upper subgrade 100% compaction degree indicated in Federal Aviation Administration and $K_{30}{\geq}20kgf/cm^3$ in plate bearing test. $K_{30}$ to be acquired 100% compaction degree of upper subgrade is confirmed to about $31kgf/cm^3$ from correlation $K_{30}$ vs relative compaction degree.

  • PDF

A Study on the Development of Project Management Information System for Mega Project (대형 건설사업에서의 사업관리정보시스템 구축에 관한 연구)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.243-255
    • /
    • 1999
  • A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.

  • PDF

Analysis of alternative project for demonstration route construction of Urban Transit Magnetic Levitation System (도시형 자기부상철도 시범노선건설 대안설계의 분석)

  • Kim, Byoung-Seop;Lee, In-Yong;Kim, Si-Gon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.581-591
    • /
    • 2010
  • Korea Rail Network Authority ordered Urban Transit Magrev System on the alternative tender lines. The project was contained order with GS Construction and Yooshin Corporation as a result of competition as 5 consortium. Urban Transit Magrev System route was constructed in the whole Yeongjong-dong and Yongyu-dong, Jung-gu, Inchen. The main project is via transportation center in Inchen Int'l airport ~ Work complex ~ Water park ~ Yongyu-station and has Total continuation of 6.1kilometers, Station of 6 spot, Car base of a spot, go out line(a single line) of 380meters. Scale of construction is Major of Roadbed, Railroad, Building, Inspection and Repair facilities. The first Urban Transit Magrev System in Korea is a new symbol of Korea and has polished beauty and creative artistry based on functional perfection. It was designed in harmony with Inchen Int'l Airport improving the dignity of SOC design.

  • PDF

Ground Stability Evaluation of Volcanic Rock Area in Jeju according to the Loading Conditions (하중조건을 고려한 제주 화산암지대의 지반 안정성 평가)

  • Han, Heuisoo;Baek, Yong
    • The Journal of Engineering Geology
    • /
    • v.31 no.2
    • /
    • pp.199-209
    • /
    • 2021
  • This paper is written to evaluate the ground stability according to the construction of Jeju 2nd airport. Sumgol is the unique characteristics of Jeju soil, which is used to evaluate the ground stability of the airport. The research contents are as follows. 1) The geotechnical characteristics for Jeju 2nd airport was analyzed, and the Sumgol and geotechnical properties were calculated based on the existing geotechnical survey data. 2) The divided sections of Jeju 2nd airport were modeled to evaluate the ground stability after determining the section (runway and airport facilities) which have the different soil and loading properties. 3) The stability and deformation ranges of the airport ground were identified through numerical analysis. The entire airport was divided into three sections to analyze the stability of Jeju 2nd airport, and calculated the stresses, settlements, and strains of each section by computer numerical analysis modeling. For modeling, the ground and load conditions were examined, also pavement conditions for each airport ground section were examined. From the analysis results of each section according to the ground conditions, the vertical settlements were analyzed as 0.11~0.18 m and the sum of effective stress and pore water pressure were 92.75~445 kPa. These results were made by taking into account the Sumgol of the bottom ground without reinforcement, also the soil strength parameters of the airport ground were reduced for computer modeling, Therefore, if proper reinforcements are applied to the ground of Jeju 2nd airport, sufficient airport ground stability can be secured.