Inchon International Airport(IIA) is constructed for Northeast Asia Gate as is important for IIA to become a 21 century's leader in the world, as is planned for open at december 2000 as a important economic link for unified korea. Airport Power Information System(APIS) is designed through investigation of advanced domestic and international example. In addition to power facility operation it is designed for using an information infrastructure of whole airport. APIS is newly designed for uninterupted power supply, effective power management, information infrastructure's construction. making a profit by positively introduction of new technology for collection and conservation of power related data, correlation with airport infra systems, data interrelative arrangement about related systems like outdoor lighting system and automatic measuring record, CCTV systems for remote power facility monitoring, and promotion of management ability in the emergency status.
Inchon International Airport(IIA) is constructed for Northeast Asia Gate as is important for IIA to become a 21 century's leader in the world. as is planned for open at December 2000 as a important economic link for unified korea. Power System is designed through investigation of advanced domestic and international example. In addition to power facility operation it is designed for using an information infrastructure of whole airport. IIA Power System Design make instantaneously the Power Distribution Facilities and the SCADA System to construct the airport. and the Airport Power Information System to operate the Power System. It is designed to take efficient and safe Power System including the advanced technology. Power System make the integrated Power Information Database to operate the Main Control Center, analyze the data about the relation of the Power System and Airport operation, and will support the important files in the future.
Inchon International Airport (IIA) is one of many new airports being constructed in the Asia Pacific region. IIA is located at the center of Northeast Asia connecting 43 major cities within 3.5 hour flight. With the sate-of-the-art airport facilities, IIA will also have the diverse functions of a modern airport for international business, where airport users can work and relax at the same time. It will be built for the multifunction of Pentaport - Airport, Businessport, Teleport, Seaport and Leisureport. IIA will be a leading hub airport for Northeast Asia in the coming 21st century. This paper will focus on the development plan for Inchon International Airport and its current status.
Choi, Dong Yeop;Sin, Jung Ha;Chang, Chan Hyeok;Park, Sung Do
Journal of the Korean Society for Aviation and Aeronautics
/
v.27
no.2
/
pp.37-46
/
2019
Although This study is to produce various considerations for the proper time and feasibility of new runway with Incheon international airport $4^{th}$ runway development case. In order to validate the feasibility of runway development, it is main considerations to be increased airport capacity for accommodating increase air traffic demand, secure stable airport operation without degrading service level, cope with emergency situation and maintain competitive among competitive airports which are developing new runway. Conclusionally, to develop new runwlay at the proper time for sustainable and stable airport operation without stop is the best way of maintaining competitiveness among foreign competitive airports.
Journal of the Korean Professional Engineers Association
/
v.34
no.1
/
pp.14-22
/
2001
Kimpo International Airport, located within the Seoul metropolitan district, experienced a sudden surge of passengers and cargo in recent years. In 1990, MOCT sponsored feasibility studios and Youngjong Island location was selected as the most suitable choice among four proposed sites to build a new airport. The construction work was then commenced in November 1992. Phase I project facilities are scheduled to start its operation in March 2001 with an annual capacity of 27 million passengers and 1.7 million tons of cargo for both enplaning and deplaning from International liners. Kimpo International Airport will remain in operation primarily for domestic passengers and cargo only. Phase II project construction work will add two more runways with its related facilities by 2005. Inchon International Airport will then conveniently serve 100 million passengers for enplaning and deplaning, and 7 million tons of inbound and outbound cargo annually in its full capacity. All the airport facilities In phase I and phase II periods are constructed to meet international standards. A fully integrated transportation network and logistics function systems should be accomplished prior to the full operation of the airport. With these sccomplishments, the state-of-the-art airport is poised to meet the needs of a rapidly growing worldwide air transport industry, and will more than adequately fulfill its role as a hub airport for the Northeast Asia region.
Today air traffic at the airport is complicated including a significant increase in the volume of air transport, so aviation accidents are constantly occurring. Therefore, we should newly recognize importance of the Air Traffic Safety, the core values of the Air Traffic. The location of airport that is the basic infrastructure of the air traffic and the security of safety for facilities and equipments are more important than what you can. From this dimension, I analyze the step-by-step safety factors that are taken into account in the airport development projects from the construction or improvement of the airport within the current laws and institutions and give my opinion on the enhancement of safety in the design and construction of airport. The safety of air traffic, as well as airport, depends on location, development, design, construction, inspection and management of the airport including airport facilities because we have to carry out the national responsibility that prevents the risk of large social overhead capital for many and unspecified persons in modern society through legislation regarding intervention of specialists and locational criteria for aviation safety from the planning stage of airport development. In addition, well-defined installation standards of airports and air navigation facilities, the key points of the airport development phase, can ensure the safety of the airport and airport facilities. Of course, the installation standards of airport and air navigation facilities are based on the global standard due to the nature of air traffic. However, to prevent the chaos for the safety standards in design, construction, inspection of them and to ensure the aviation safety, the safety standards must be further subdivided in the course of domestic legislation. The criteria for installation of the Air Navigation facilities is regulated most specifically. However, to ensure the safety of the operation for Air Navigation Facilities, performance system proved suitable for the Safety of Air Navigation Facilities must change over from arbitrary restrictions to mandatory restrictions and be applied for foreign producers as well as domestic producers. Of course, negligence of pilots and defective aircraft maintenance lead to a large portion of the aviation accidents. However, I think that air traffic accidents can be reduced if the airport or airport facility is perfect enough to ensure the safety. Therefore, legal and institutional supplement to prioritize the aviation safety from the stage of airport development may be necessary.
Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
/
2003.08a
/
pp.10-17
/
2003
Acoustic and pressure type seabed installed wave sensors have advantage in observing long period infra-gravity wave and tsunami, while buoy type wave gauges which measure acceleration of the moored buoy motion are not able to detect long period waves. That's why most of the Japanese coastal wave observation sensors are seabed installed typed ones. Nationwide Japanese coastal wave observation systems with seabed installed sensors are gradually clarifying long-period tsunami profiles and infra-gravity wave characteristics (Nagai.et.al., 1996, 1997,2000,2002a,2002b). (omitted)
The back-filled soil of the New Incheon International Airport construction site was reclaimed with sea sand in near the Young-Jong island. The primary study was carried out from August 1993 to June 1997 to study soil amendment and to select salt resistance turfgrass species. This study dealt with low maintenance area that included most part of open space of airport site. The second experiment, from October 1996 to August 1998, focused on soil amendment and selection of turfgrass species for alongside runway where turf area was maintained. Through two previous studies, propagation methods with zoysiagrass were tested for alongside runway and surrounding areas at 1998. The study of construction methods with zoysiagrass, vegetative propagation showed better results on visual quality and cover rating compare with seeding propagation. However, significant different between vegetative and seeding propagation was not showed on visual quality and drought tolerance after one year of plot establishment. The cover rating by seeding construction methods reached in excess of 70% of limitation suggested by the Incheon International Airport Cooperation. Zoysia net and sprigging net methods were the most suitable where there requires rapid and high rate of ground cover. Seeding propagation should be acceptable to obtain a resonable cover rating where there allows relatively longer period of completion. Therefore, it should be possible to attain a proper rating of ground cover on the site of open space, alongside runway or areas similar to the New Incheon International Airport which is being built on dredged seashore sand. However, the methods of soil amendment, selecting salt tolerance species, and proper construction procedure should be considered at the a time.
PURPOSES : This study aimed to analyze economic effect of recycled aggregate production on job-site airport pavement. METHODS : The validation of site recycling for waste concrete as economic efficiency is analyzed through the case study of site recycling at an O airport pavement construction. The break-even point for the cost of site recycling was estimated according to two different waste concrete processing methods such as job-site recycling and processing on commission (or plant). RESULTS : Job-site recycling cost decreases as the use rate of job-site recycled concrete aggregate increases, or the amount of concrete waste increases, but transporting distance decreases. It was shown in an O airport case that as the use rate of job-site recycled concrete aggregate exceeds 61.4 %, the job-site recycling cost is cheaper than the processing cost on commission. CONCLUSIONS : The results of this study can utilize basic data of feasibility for site recycling of waste concrete on airport pavement construction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.