• Title/Summary/Keyword: Construction monitoring

Search Result 1,740, Processing Time 0.029 seconds

OBSERVATION ERROR OF TIME-LAPSED PHOTOS IN CONSTRUCTION OPERATION MONITORING

  • Jiwon Choi;Julian Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1042-1047
    • /
    • 2005
  • A web-based camera (webcam) is expected to enhance construction operation monitoring. However, webcams are often installed outside a building because their mobility is limited by cable wiring, which makes it difficult to monitor construction operations inside the building. If a webcam is integrated with emerging wireless communication technologies, construction professionals may be able to monitor interior construction operations using webcams without getting network cables wired on a congested and dynamic construction job site. However, one may concern that wireless communication may not be fast enough to transport all webcam images seamlessly. This paper presents an investigation as to the observation error of webcam images when a limited amount of images are delivered.

  • PDF

Development of a Workload Index for Monitoring Durability Test of an Excavator (굴착기 내구시험 모니터링을 위한 작업부하 지표 개발)

  • Cho, Jae-Hong;Na, Seon-Jun;Kim, Min-Seok;Park, Myeong-Kwan
    • Journal of Drive and Control
    • /
    • v.19 no.4
    • /
    • pp.29-35
    • /
    • 2022
  • In this paper, we developed a workload index for monitoring the durability test using operation information of an excavator. First, the acceleration and cylinder pressure were selected as load factors by analyzing operation data. Through load correlation analysis according to each load factor, Root Mean Square (RMS) and Work Load Range (WLR) were respectively derived as a load feature representing mechanical load. In addition, the workload index was used to quantify load features. For applying the workload index to monitoring, a real-time monitoring system consisting of sensors and embedded controller was installed on the excavator and the system was integrated with a remote monitoring environment using a wireless network. Results of load monitoring and analysis verified that the developed workload index was effective from the viewpoint of the relative comparison of the workload.

A Study on Development of Monitoring System for Precise Consturction of Large Scale Prestressed Concrete Bridges (PC장대교량의 정밀안전시공을 위한 시공계측관리시스템의 개발에 관한 연구)

  • 오병환;김의성;최인혁;양인환
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.10a
    • /
    • pp.520-525
    • /
    • 1996
  • Recently, the prestressed concrete long-span bridegs are increasingly built at various locations in the world. The mechanical and structural behavior of prestressed concrete bridges is very complex because of nonlinear and time-dependent material behavior and sequential change of structural system due to stepwise construction. These factors may cause construction errors with respect to design value and monitoring system is needed to minimize or to protect construction errors. This study presents the basis development of monitoring system for precise construction of large scale prestressed concrete bridges.

  • PDF

Monitoring management for safely construction of deep shield tunnel (대심도 해저 쉴드터널 안전시공을 위한 계측관리)

  • 유길환;김영수;황대영;곽정민;정성교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.319-326
    • /
    • 2002
  • During the construction period of submarine shield tunnel, which is built firstly in very soft marine clay layer 40m deep in Korea, wide range problems were encountered such as safe launching against high earth pressure at shield entrance, technique of shield face pressure control when passing through complex multi-layered soils This paper introduces successful construction practice through development of state-of-the-art construction method and field monitoring.

  • PDF

Structural Health Monitoring of Shanghai Tower Considering Time-dependent Effects

  • Zhang, Qilin;Yang, Bin;Liu, Tao;Li, Han;Lv, Jia
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.1
    • /
    • pp.39-44
    • /
    • 2015
  • This paper presents the structural health monitoring (SHM) of Shanghai Tower. In order to provide useful information for safety evaluation and regular maintenance under construction and in-service condition, a comprehensive structural health monitoring (SHM) system is installed in Shanghai Tower, which is composed of a main monitoring station and eleven substations. Structural responses at different construction stages are measured using this SHM system and presented in this study. Meanwhile, a detailed finite element model (FEM) is created and comparison of results between SHM and FEM is carried out. Results indicate that the time-dependent property of concrete creep is of great importance to structural response and the measured data can be used in FEM updating to obtain more accurate FEM models at different construction stages. Therefore, installation of structural health monitoring system in super-tall buildings could be considered as an effective way to assure structural safety during the construction process.

Particulate Matter Monitoring System Based on IoT for Construction Sites (IoT 기반의 건설현장 미세먼지 모니터링 시스템 개발에 관한 연구)

  • Kim, Hyunsik;Tae, Sungho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.40-41
    • /
    • 2021
  • Recently, particulate matter(PM) caused by internal factors such as industrialization and urbanization as well as external factors such as Asian dust is a serious problem in Korea. In particular, while the emission due to construction appears to be very serious among the internal factors, it is necessary to manage PM in consideration of the characteristics of construction sites. Accordingly, in this study, a PM management system suitable for construction sites was developed to reduce civil complaints caused by PM and to minimize damage to field workers and nearby residents by supporting the fine dust management system of the state and local governments. The factors to be considered when measuring PM due to the specificity of construction sites were considered, and the system components were developed based on the considerations. As a result, an IoT based construction site PM monitoring system (CPMS) that integrates each component was established.

  • PDF

Extraction of Workers and Heavy Equipment and Muliti-Object Tracking using Surveillance System in Construction Sites (건설 현장 CCTV 영상을 이용한 작업자와 중장비 추출 및 다중 객체 추적)

  • Cho, Young-Woon;Kang, Kyung-Su;Son, Bo-Sik;Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.397-408
    • /
    • 2021
  • The construction industry has the highest occupational accidents/injuries and has experienced the most fatalities among entire industries. Korean government installed surveillance camera systems at construction sites to reduce occupational accident rates. Construction safety managers are monitoring potential hazards at the sites through surveillance system; however, the human capability of monitoring surveillance system with their own eyes has critical issues. A long-time monitoring surveillance system causes high physical fatigue and has limitations in grasping all accidents in real-time. Therefore, this study aims to build a deep learning-based safety monitoring system that can obtain information on the recognition, location, identification of workers and heavy equipment in the construction sites by applying multiple object tracking with instance segmentation. To evaluate the system's performance, we utilized the Microsoft common objects in context and the multiple object tracking challenge metrics. These results prove that it is optimal for efficiently automating monitoring surveillance system task at construction sites.

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

Force monitoring of Galfan cables in a long-span cable-truss string-support system based on the magnetic flux method

  • Yuxin Zhang;Xiang Tian;Juwei Xia;Hexin Zhang
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.3
    • /
    • pp.261-281
    • /
    • 2023
  • Magnetic flux sensors are commonly used in monitoring the cable force, but the application of the sensors in large diameter non-closed Galfan cables, as those adopted in Yueqing Gymnasium which is located in Yueqing City, Zhejiang Province, China and is the largest span hybrid space structure in the world, is seldom done in engineering. Based on the construction of Yueqing Gymnasium, this paper studies the cable tension monitoring using the magnetic flux method across two stages, namely, the pre-calibration stage before the cable leaves the rigging factory and the field tension formation stage of the cable system. In the pre-calibration stage in the cable factory, a series of 1:1 full-scale comparative tests were carried out to study the feasibility and relability of this kind of monitoring method, and the influence on the monitoring results of charging and discharging voltage, sensor location, cable diameter and fitting method were also studied. Some meaningful conclusions were obtained. On this basis, the real-time cable tension monitoring system of the structure based on the magnetic flux method is established. During the construction process, the monitoring results of the cables are in good agreement with the data of the on-site pressure gauge.The work of this paper will provide a useful reference for cable force monitoring in the construction process of long-span spatial structures.

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF