• Title/Summary/Keyword: Construction method selection

Search Result 522, Processing Time 0.025 seconds

A Selection Model For Power Plant Project Delivery Method (화력발전소 발주방식 비교를 통한 적정 발주방식 선정 모형)

  • Kim, Sun-Kuk;Park, Jong-Kyoo;Park, Chan-Sik;Son, Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.66-77
    • /
    • 2007
  • With the electricity industry structure reformation of the government in April, 2001, Korea Power Electric Corporation was divided in to Korea water power nuclear power and 5 thermal power plant. After, various delivery method is introduced and applied for active profit creation according to the competition between each development companies for the public company privatization. However, the current situation does not satisfy the project participant by selecting the delivery method without reflecting the business goal and project characteristics of power plant construction business. The objective of this study is to research the influencing factors that should be considered to select the delivery method in thermal power construction business and develop a standard of selection of appropriate delivery method through questionnaire and interviews to establish a model to select the delivery method that fits the business goal of the subject of delivery. In the future, if the delivery method selection model suggested in this study is applied, it is expected to select the appropriate delivery method of power plant construction business by effectively reflecting the business goal, characteristics and demand of the delivery subject, and characteristics of the construction business apart from the existing customary practices that decided the delivery method dependent on the subjective and experience based judgement.

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site

  • Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.45-50
    • /
    • 2014
  • Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.

A Study on Analytic Hierarchy Proces for Construction Planning -Research on Examples of Railway Route Selection- (건설계획 수립시 계층분석적 의사결정법 적용방안에 관한 연구 -철도노선 선정시 활용사례 연구-)

  • Sohn, Jin-Hyeon;Cha, Cheol
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.4
    • /
    • pp.249-254
    • /
    • 2007
  • Recently, the items of construction planning have magnified and specialized and the problems occurring at the first step of the construction planing process have complicated. In this research, AHP(Analytic Hierarchy Process) method which is simple to apply and clear to decide has been proposed when a people making a plan at the first step of the construction planing process. As an example, the best solution has been obtained in a railway construction line choice that consist of various items by applying for this method, which proves the possibility of application of this method to the complicated problems.

  • PDF

Preparation and Construction Method of Polymer tile Adhesive for Reducing tile Defects (타일하자 저감을 위한 폴리머계 타일접착제 제조 및 시공방법)

  • Cho, Yong-Kwang;Jeon, Jin-Ho;Park, Chang-hwan;Jo, Sung-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.183-184
    • /
    • 2021
  • Defects such as falling and cracking of tiles installed in the bathrooms of apartment houses are frequently occurring. Therefore, in order to solve this problem, the A/S cost of construction companies and consumer complaints are increasing. The causes of tile defects include problems such as the selection of tile adhesive and lack of adhesive strength, the carelessness of the installer, the base surface, and the absorption rate of the tile. Therefore, in this study, an adhesive construction method using tile adhesives with high resistance to deformation of floors and tiles was studied. In addition, the properties and construction methods of tile adhesives were evaluated.

  • PDF

Case of construction method to the railway tunnel under the road (도로하부를 통과하는 철도터널의 특수공법 적용사례)

  • Kim, Sun-Hong;Jo, Yong-Seok;Kim, Dong-Ki;Park, Byung-Eun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.337-344
    • /
    • 2007
  • This paper is about the examination and selection of the special method applied to the railway tunnel which will lie under the road. Moreover, the road was constructed on the weak ground. Eventually, we select DSM, considering geological condition, stability during construction of the railway tunnel, and economic efficiency. The 3D-analysis, performed with PENTAGON-3D and MIDAS CIVIL-3D, shows that allowable standards are all satisfied. In the design of the railroad tunnel under the road at low depth, this paper will give useful data for the selection of the tunneling method.

  • PDF

THE SELECTION OF COLOR SCHEME FOR 4D CONSTRUCTION MODEL

  • Han-Shuo Chang;Shih-Chung Kang;Po-Han Chen
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.323-330
    • /
    • 2009
  • This paper presents the selection, examination, and user test (SEUT) procedure to determine the ideal color scheme for a 4D model. This systematic procedure can be performed iteratively to obtain the color scheme that would be most appropriate for construction purposes. To verify the proposed procedure, an example case with two iterations is presented. Ten color schemes were examined and 48 users tested during the two iterations, and the result shows that the SEUT procedure is an effective method for determining the ideal color scheme for 4D models.

  • PDF

Decision Making Model for a Public Construction Project Delivery Method Selection based on Analytic Hierarchy Process (AHP를 이용한 공공공사 입찰 방식 의사결정지원 모델)

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.559-566
    • /
    • 2017
  • The bidding method of public works is decided based on the experience of the officials in charge and the convenience of the work, but the validity of decision making process for the bidding method has not been verified. Another challenge in the bidding method selection is its objective validation is not easy because the decision making is based on experience, when a new type of project is ordered or a new bidding method is applied In this study, therefore, a decision making model to facilitate the selection of a public construction project delivery method was developed and examined with its applicability. This model was developed using the Analytic Hierarchy Process and was verified through 32 persons who were actually in charge of the works. As a result of applying this model, 5 of the 32 persons showed consistency in using the model. and they expressed positive opinions about the model. The model can provide a guide while recognizing the fact that they cannot depend entirely on the model. Therefore, the model proposed in this study is expected to reduce the work-related burden of the persons who are involved in the related work and help the objective performance of their tasks when a new bidding method or project appears in the future.

A Study on Change Orders in Overseas Construction using Feature Selection - Focus on Plant Construction in the Middle East - (Feature Selection을 활용한 해외 건설의 공사변경 관리에 관한 연구 - 중동 플랜트 건설프로젝트를 중심으로 -)

  • Hong, Sunyoung;Yeom, Chunho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.63-71
    • /
    • 2021
  • This paper looks into how to enhance construction project management, focusing on the change order, which is often considered one of the major causes for construction delays, disputes, and claims in the middle east construction. First, this paper categorizes the major causes of change orders. It suggests a detailed classification standard for affecting factors resulting from change orders based on a case study result of an on-going construction project in the Middle East. In particular, this paper presents a method to apply a machine learning-based feature selection to quantify the importance of change order triggers and affecting factors. As a result, the case study identifies six major change order triggers and eight affecting factors. Also, a meaningful relationship between change order triggers and affecting factors by each category is presented. This paper will contribute to setting a clear guideline for change order management for the international plant construction field while helping prevent construction delays and cost run-ups by reducing the time required for change order resolution between project owners and contractors.

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

A study on the External Insulation and Waterproof Method of Rooftop (옥상부 외단열 및 외방수 공법 제안에 관한 기초연구)

  • Jang, Dae-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.137-138
    • /
    • 2019
  • To overcome the limitation in relation to thermal insulator's selection and installation method that is suitable for exterior insulation and waterproof construction methods, a production basis of thermal insulators of which manufacturing knowhow is held by companies was ensured and future-oriented construction methods to adopt new materials were applied. Performance verification was conducted through performance and mock-up tests of thermal transmittance on the cross sections where the flexible insulators were applied based on the improved prototype and performance data were obtained. To overcome the biggest drawbacks (walking feeling and damage etc.) in the exterior insulation and waterproof construction method, inserting a protective layer between thermal insulator and water-proof layer was proposed, and polypropylene corrugated cardboards.

  • PDF